PDG PROJECT DESIGN GUIDE A05 ‘PQP’
Transcription
PDG PROJECT DESIGN GUIDE A05 ‘PQP’
A DESIGN MANAGEMENT DOCUMENT PDG © A05 PROJECT www.projectdesignguides.com A05 DESIGN GUIDES PROJECT DESIGN GUIDE A05 ‘PQP’ Project Name: Project No.: Date: Name Number Date Document No.: PDG-PDG-PRO-A05.0 Project name: / No. Document version: V01 Date Created: © Philip D G Yorke 2012 Date Revised: 1 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com Revision: Revision description: Revision date: 01 A section for appointments and a guide tick list has been included. 6 November 2014 02 03 Edited to be project specific / Revised by: Name: Position: Signature: Date: Checked by: Name: Position: Signature: Date: Authorised by: Name: Position: Signature: Date: Project name: / No. Document version: V01 © Philip D G Yorke 2012 2 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com Document Distribution: Name Company Status A Date 00/00/2012 Status key: A – Action I – Information Project name: / No. Document version: V01 © Philip D G Yorke 2012 3 of 14 A DESIGN MANAGEMENT DOCUMENT 0.0 A05 www.projectdesignguides.com Introduction The purpose of the PQP is to define the project specific processes and provide key information that would pass the ‘knock down bus’ test; to enable a competent person, should the need arise, to be able to take over the project at short notice and be able to maintain specified programme, service and performance. It should consist of processes done in the normal course of events. Of course, it is also proof that due process has taken place if/when a project is QA audited. The relevants of Section 1.0 Appointments depends on the procurement route. Generally the PQP will be put together in parallel to and be part of the early contract definition and agreement stage. 1.0 Appointments Consultant appointments have been managed and undertaken in accordance with the following guides: Section Contents Related Documents 1 Consultant appointment strategy PDG A00.0, A00.0a, A00.0b 2 Competence PDG A00.1 3 T&C’s By commercial manager. 4 Appointment schedules PDG A01, PDG A02, PDG A03 The above are the fundamentals, dependant on the project complexity and size and phasing, the appointment process may be far more complex; this potential in set out in Guide A00.0a. 2.0 Design Fundamentals A quick reference of information fundamental to the project is to be provided and should include the following: 1.0 Project name / no. & location: 2.0 Parties: Client organisation – Key contacts: Company name & address / key personnel names / position / contact numbers Clients representative – Key contacts: Company name & address / key personnel names / position / contact numbers Main Contractor – Key contacts: Company name & address / key personnel names / position / contact numbers Design consultant 1 – Key contacts: Company name & address / key personnel names / position / contact numbers Design consultant 2 – Key contacts: Company name & address / key personnel names / position / contact numbers Design consultant 3 – Key contacts: Company name & address / key personnel names / position / contact numbers Project name: / No. Document version: V01 © Philip D G Yorke 2012 4 of 14 A DESIGN MANAGEMENT DOCUMENT Design consultant 4 – Key contacts: 3.0 A05 www.projectdesignguides.com Company name & address / key personnel names / position / contact numbers General info Procurement route: Commodity: Does the building design work? Does it answer the brief? Approximate value / GMP: Programme key dates: Refer to PDG A03. Key Area fig’s & ratios: 4.0 Description Site context: Project description: Built form: Access: Public realm: Landscape: Sustainability: 3.0 Design Processes & Protocols In addition to this document, the PQP is made up of a series of Project Design Guides, as scheduled out below, against a typical PQP list of headings. Each Design Guide is a project specific element or group of elements that make up the design process. Together they constitute the requirements of a PQP. This collated document is sometimes referred to as a DEP (Design Execution Plan), or PDH (Project Design Handbook). A brief description of the content of each section can be found below. This is to both aid the user in understanding the principles of the PQP and to give an understanding of which process documents / tools are to be associated to each section. The PQP can be adapted for use by individual consultants or it can be used at the project level as an integrated tool to be issued to the client. Section Contents Project name: / No. Document version: V01 Related Documents © Philip D G Yorke 2012 5 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com 1 Scope (Complete/element/package) PDG A06. 2 Quality Objectives Refer to text below. 3 Design & Development INPUTS PDG A03, PDG A06. 4 Management Responsibilities PDG D01 & many of the other sections. 5 Control of Documentation and Data PDG D02, PDG D03, PDG D04, PDG D05? 6 Planning of Asset Realisation Refer to text below. 7 Design & Development Planning PDG A03. 8 Resources PDG A00.1, PDG D02. 9 Client Related Processes Refer to text below and PDG A06, PDG D03, PDG D04, PDG D07, PDG D08. 10 Technical Interface PDG D02 11 Design & Development OUTPUTS PDG A03, PDG A04 12 Design & Development Review PDG A04 13 Design & Development Verification and Validation Refer to text below, PDG D08, PDG D09 14 Design & Development Changes PDG D07 15 Appendix A – Design Certificate of Compliance Statutory certification or self certification process to be described. 1 Scope Project scope definition is the most important factor when it comes to project requirements. It is vital for the Contractor to define the scope of the project in order to successfully enter into an agreement with the client. Project scope is defined by one or many of the following: Contractual responsibilities, RIBA stage, description of asset, site boundary. All elements of the brief, subject to ambiguity, need to be clarified and agreed, to ovoid scope creep. Scope certainty is required to enable cost and programme certainty. Describe / List out here: 01 Refer to section 2.0 Design Fundamentals, of this document. 02 Refer to Land Registry deeds for ownership boundary. 03 Refer to L.A. Planning red line boundary for extent of works. 04 Refer to PDG A06. 05 Project brief at contract award agreed as achieving RIBA stage ‘D’ 2 Quality Objectives There are differing quality definitions; one simple way to look at quality is to break it down into 3 parts – Time, Cost and Scope. One should, however refer to the standards described in the Main contract and/or by Contractor policy. There are many criteria by which to define and measure quality holistically or in part, i.e. Design Council CABE, BREEAM, etc. Describe / List out here: 01 Design Council CABE. 02 03 3 Design & Development INPUTS Project name: / No. Document version: V01 © Philip D G Yorke 2012 6 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com All items required to undertake the design of the project. From the Client – the brief, required standards, surveys, all items required under the CDM regulations. From the Contractor – the cost plan, construction programme, Phasing, logistics, knowledge of all specialist supply chain members being deployed. 4 Management Responsibilities Ensuring that the process adheres to certain quality guide lines and so ensuring the PQP fits the project needs for – strategic planning, effective communication, resource management & training needs, design control, development control (product quality conformance), risk and mitigation, performance monitoring (KPI’s) and feed-back. 5 Control of Documentation and Data Information is the life blood of construction projects. Therefore, the project quality plan should describe the way to manage and control the documents used. Usually there is a common documentation repository with controlled access in order to store and retrieve items. It is vital that the method of designing (i.e. BIM or CAD) is fully understood and agreed between all parties before these protocols are written. 6 Planning of Asset Realisation An asset, whether building or infrastructure needs to be realised in accordance with the client’s business plan. An asset, as opposed to a building or structure, embodies the concept of commercial value. It is not uncommon for clients to keep their asset running whilst construction is being undertaken. The planning of asset realisation, usually by Contractor to satisfy client needs, will have a bearing on how the design solution is formulated. Live sites, phased hand-over, restricted sites and Contractor specialism’s, to name 4 constraints, will have a bearing on design solutions. Describe project specific constraints here: 01 Live sites. 02 Phased hand-over. 03 Restricted site. 04 Specialist contractor processes i.e. DfMA. 7 Design & Development Planning The Lead designer will be responsible for ensuring all consultants agree to an integrated design plan that is as far as reasonable, aimed at meeting all contractor programme dates. It is to take into account VE process and SDP and will be required to be updated for all instructed changes. Programmed integrated implication of changes and proposed mitigation scenario’s, are to be provided by the Lead designer to the employer for all proposed changes. Lead designers integrated project design delivery plan is to be produced in the programme software, dictated by the employer to enable all programmes to be integrated as necessary. 8 Resources Resources, in terms of human capital, are the most important asset for professional service firms. It is therefore fundamental that checks are in place to ensure consultancies appointed have the depth and breadth of knowledge & skill to undertake project services and deliverables. It is also fundamental to check the correct individuals are available to be assigned to a project and have the necessary competences to undertake tasks. Whilst one would normally seek to appoint consultancies that have all the required competencies, there a circumstances where training will be required and so should not be discounted under CDM. Resources are to be planned for the entire project and any proposed changes need to be brought to the employer’s attention in accordance with contract procedure. 9 Client Related Processes The PQP and associated documents will need to be written to take due consideration of all client related contractual, and other agreed, processes. These may included (Amend list as required): 01 Monitoring team approvals Project name: / No. Document version: V01 © Philip D G Yorke 2012 7 of 14 A DESIGN MANAGEMENT DOCUMENT 02 Technical approvals 03 Stakeholder sign offs 04 Reviewable Design Data 05 Operation of asset 06 Phasing and decanting restrictions A05 www.projectdesignguides.com 10 Technical Interface The Design manager / Construction manager will be responsible for arranging Technical meetings with the client / client’s stakeholder and design sub-contractors. The Lead designer is to arrange Technical meetings with statutory authorities and contracted standards (Secure by Design, BREEAM, etc), and ensure all design / technical information is prepared for all meetings. Inter consultant technical interfaces are deemed to the normal part of design coordination and therefore a standard part of the Lead designers responsibilities. 11 Design & Development OUTPUTS Outputs generally come in 2 forms, those used for decision making and those used for construction processes. The type of output will depend on the stage of the project. All outputs must be subject to sections 12 and 13 of this document. Decision making outputs can be typically named as: design programmes, deliverables schedules, Design Notes, Stage Reports. Construction process outputs can be typically named as: drawings, specifications, schedules, calculations, etc; for Tender and Construction tasks. Outputs will have differing levels of ‘completeness’ depending on the project stage and use. 12 Design & Development Review The review process is ideally to be part of a practice wide system of reviewing all projects. Reviews are to be timetabled in advance with stage related agendas drawn up to be critiqued by appropriate competent personnel who are not directly involved in the project. It is a fundamental process to check information from concept to construction detail, to ensure designs answer the brief and conform to requirement and standards, or betters them. It is also a way of ensuring the information created and issued is verified and validated / fit for purpose / was created with due skill and care. 13 Design & Development Verification and Validation Verification and validation are independent processes that are used for checking that a product, service, or system meets requirements and specifications, and that it fulfills its intended purpose. Design and development verifications use objective evidence to confirm that design and development outputs meet specified input requirements. List / amend criteria here: Ref Criteria Process 01 Design solution, details, specifications, etc Design and Development Reviews 02 Completeness and accuracy of information Monitoring team approvals 03 Technical solutions meet client standards Internal Client Technical approvals 04 Technical solutions meet statutory and client standards External Technical approvals (e.g. Building Control, BREEAM, SbyD) 05 Solutions meet client standards Client / Stakeholder sign offs 06 Reviewable Design Data Negotiation Design and development validations use objective evidence to confirm that products meet the requirements which define their intended use or application. Project name: / No. Document version: V01 © Philip D G Yorke 2012 8 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com List / amend criteria here: Ref Criteria 01 Client success criteria Process 01.1 Space standards RICS method of measurement 01.2 Ease of circulation Technical studies 01.3 Environmental performance Technical studies 05 Planning permission Lead designer check at all stages against approved scheme All criteria and processes must be agreed with the client and be wholly within the gift of the design team to dictate. In other words criteria cannot relate to how an asset is managed, the personnel employed, any equipment installed after hand-over, the output rate, profitability, etc. 14 Design & Development Changes A Change is a deviation from the main contract design brief. Changes can be proposed by various parties for many reasons, none however, are to be instigated unless instructed. All proposed changes need to be reviewed, a process to check that information conforms to requirements and standards, or betters them, is costed and instructed as laid down by the main contract. VE proposals, to become valid, will come within this procedure. Note: Design Development is not to be confused with Design Change. 4.0 Policy documents The contractors/consultant Health & Safety Policy, Environmental Policy and others relevant to design matters are to be appended B, C, etc. 5.0 Managing this document To be updated as required. Most updates, however, will be contained within the content of the associated PDG’s. PQP non-conformances and risks are to be listed below and reviewed fortnightly/monthly with an internal QA manager. Any item that is thought likely to require a 5 days Corrective Action Report (CAR), is to be brought to the attention of the employer within 5 working days. PQP None Conformances, Risk and Mitigation schedules Item Date identified - Non Conformance / Risk Date - Mitigation 001 01.05.2012 – CV’s outstanding 01.06.2012 – provided 002 003 Text boxes to have colour RAG to indicate level of Risk before and after mitigation. Key: High Risk Medium Risk Low Risk Project name: / No. Document version: V01 © Philip D G Yorke 2012 9 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com Design Management Guides tick sheet (amend to suit project design strategy) Design Management Guides CONTRACT DEVELOPMENT & DELIVERY PDG A00 ‘CONSULTANT APPOINTMENT STRATEGY AND CAM’ Alternative used – Name PDG A00.1 ‘COMPETENCE STATEMENT AND ASSESSMENT’ Alternative used – Name PDG A01 ‘SCHEDULE OF SERVICES (SOS)’ Alternative used – Name PDG A02 ‘DESIGN RESPONSIBILITY MATRIX (DRM)’ Alternative used – Name PDG A03 ‘DESIGN PROGRAMME & DELIVERABLES’ Alternative used – Name PDG A04 ‘DESIGN REVIEW & AUTHORITY PLAN’ Alternative used – Name PDG A05 ‘PROJECT QUALITY PLAN (PQP)’ Alternative used – Name PDG A06 ‘CONTRACT SCHEDULES & DESIGN PROCESSES’ Alternative used – Name PDG D01 ‘DESIGN DASHBOARD’ Alternative used – Name PDG D02 ‘COMMUNICATIONS PLAN’ Alternative used – Name PDG D03 ‘DESIGN INFORMATION FLOW MAPPING’ Alternative used – Name PDG D04 ‘DOCUMENT PROTOCOLS’ Alternative used – Name PDG D05 spare / BIM Alternative used – Name PDG D06 ‘RFI PROCEDURES’ Alternative used – Name PDG D07 ‘CHANGE CONTROL PROCEDURE’ Alternative used – Name PDG D08 ‘QUALITY CONFORMANCE’ Alternative used – Name Project name: / No. Document version: V01 © Plan to use RIBA Stage Owner Novated Date issued A 1 Client or Contractor Y/N 00/00/0000 M 2/3 Client or Contractor M 2/3 Client or Contractor M 2/3 Client or Contractor M 3/4 Client or Contractor M 3/4 Client or Contractor M 2-5 Client and Contractor M 2-4 Contractor A 3/4 Contractor A 2-4 Client or Contractor A 2-5 Client or Contractor A 2 Client or Contractor M 3-5 Client or Contractor M 3-5 Client or Contractor M 5 Client or Contractor Philip D G Yorke 2012 10 of 14 A DESIGN MANAGEMENT DOCUMENT LEAD PDG L01 A05 ‘AUDIT’ Alternative used – Name PDG L02 ‘DESIGN MANAGER WORKLOAD’ Alternative used – Name PDG L03 ‘PROJECT DESIGN KPI’ Alternative used – Name PDG L04 ‘DESIGN CONSULTANT WORKLOAD TRACKER’ Alternative used – Name PDG L05 ‘PROJECT KEY DATES www.projectdesignguides.com A Any Contractor A All Contractor M 2/3-6 Contractor A Work win Contractor P All Contractor Alternative used – Name Comments: Key: M – Manditory A – Advisable P – Potentially useful Project name: / No. Document version: V01 © Philip D G Yorke 2012 11 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com Appendix - Design Certificate of Compliance Statutory certification or clients self certification process to be appended. Project name: / No. Document version: V01 © Philip D G Yorke 2012 12 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com Appendix B – Health & Safety Policy Project name: / No. Document version: V01 © Philip D G Yorke 2012 13 of 14 A DESIGN MANAGEMENT DOCUMENT A05 www.projectdesignguides.com Appendix C – Environmental Policy Project name: / No. Document version: V01 © Philip D G Yorke 2012 14 of 14