Report on Project UDC - Department of Science and Technology
Transcription
Report on Project UDC - Department of Science and Technology
Report on Project UDC Expert Advisory Committee on Solar Power and Energy Sector National S&T Entrepreneurship Development Board (NSTEDB) Department of Science & Technology March, 2015 Contents Introduction ............................................................................................................................................ 3 1. The Technical Review Meeting held on 30th December, 2014 at IIT, Madras.................................... 4 2. The Cost Review Meeting held on 3rd Feb, 2015 at IIT, Hyderabad ................................................... 7 3. Conclusion: ...................................................................................................................................... 8 Annexures Annexure 1: Concept of Brown-out ......................................................................................................... 9 Annexure 2: SLD for UDC ....................................................................................................................... 13 Annexure 3: UDPM Specifications and Functionalities ........................................................................... 14 Annexure 4: Cost Estimation for Substation Implementation ................................................................. 15 Annexure 5: Minutes of First Meeting ................................................................................................... 16 Annexure 6: Minutes of Second Meeting ............................................................................................... 19 Annexure 7: Minutes of Third Meeting .................................................................................................. 22 UDC Report Introduction Load shedding is a common phenomenon in India to bridge the gap between power supply and demand. This results in power-cut (or load-shedding or black-out) in select localities, resulting in the denial of basic conveniences like lighting, fans and TV during power shortages to a significant portion of our population. To overcome this, IIT Madras has come up with an innovative technology to provide some uninterrupted power supply to homes, even when load-shedding is required. The project Uninterrupted Direct Current (Project UDC) provide homes with uninterrupted, but limited power, sufficient to support 2-3 lights, 1-2 fans or a TV, charge mobile phones/ laptop 24X7, irrespective of power shortages. Instead of black-outs, this technology offers to perform Brown-outs (BO) by feeding 10% of the normal power to homes, however in DC forms, which provisions to energize homes even during power shortages. The details of this technology are given in Annexure 1. Department of Science and Technology (DST) has set-up an Expert Advisory Committee on “Solar and Energy Sector,” which was entrusted with the responsibility of evaluating various aspects of the technology. The committee comprised of Directors of four IITs and eminent area experts from different IITs. The composition of the committee is as follows: Prof. Uday B. Desai, Director IIT, Hyderabad - Chairman Prof. P.P.Chakrabarti, Director IIT Kharagpur - Member Prof. Bhaskar Ramamurthi, Director IIT Madras -Member Prof. Timothy Gonsalves, Director, IIT Mandi –Member Prof. Rajiv Sangal, Director, IIT Varanasi - Member Prof. Ashok Jhunjhunwala, IIT Madras -Member Prof. B.G Fernandes, IIT Bombay -Member Prof. D. Thukaram, Indian Institute of Science, Bangalore-Member Prof. S.A Kharpade, IIT Bombay -Member Prof. K. Shanti Swarup, IIT Madras -Member Prof. G. Bhuvaneswari , BITs , Hyderabad -Member Prof. Siva Kumar K, IIT Hyderabad -Member Sh. H.K.Mittal, Sc. G and Head- Innovation and Entrepreneurship(NSTEDB) -Member Dr. Anita Gupta, Sc. F and Associate Head-Innovation and Entrepreneurship (NSTEDB), DST -Member Secretary 15. Anand Pandey, Sc. B , DST- Meeting Organizing Committee 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. The terms of reference for the committee included evaluation of UDC / Brown-out technology with respect to: Whether the UDC/Brown-out proposal of IIT Madras, involving dropping of voltage at substation, is technically sound and feasible? What would be the estimated costs per home of doing it all over the country? The first advisory committee meeting to evaluate the proposed technology was held on 17th Nov, 2014 at IIT, Delhi (Minutes of meeting are given in Annexure 5). IIT Madras team had presented the concept of UDC before the committee and shared their experience on the technical and commercial feasibility of the Brown-Out. The technology and relate requirements were discussed by the committee members. The committee formed a sub-committee to look into the detailed aspects of the proposal. The sub-committee for UDC/Brown-Out technology evaluation comprised of the following members: • • • • • • • Prof. U B Desai (IIT H)- Convener Prof K Shanti Swaroop (IITM) Prof. Ashok Jhunjhunwala (IITM) Prof. Siva Kumar (IITH) Prof D. Thukaram, (IISc.) Venkat Rajaraman –Solarsis ([email protected]) Sridhar Reddy- Esennar Transformers Pvt. Ltd ([email protected]) Two subsequent committee meetings were held, where one of these meetings was focused on analyzing the technical feasibility of the solution and the other meeting was aimed at evaluating the cost and production ability of the system. Minutes of these meetings are given in Annexure 6. The technical review meeting was held on 30th December, 2014 at IIT, Madras. The economic viability aspect of the UDC was taken up during the third meeting held on 3rd Feb, 2015 at IIT, Hyderabad. The stake holders, manufacturers and suppliers were invited to present the production and costing of the project. Minutes of this meeting are given in Annexure 7. The details of the technical and costing aspects discussed during the meetings are presented in the sections below. 1. The Technical Review Meeting held on 30th December, 2014 at IIT, Madras. The technical review meeting was held on 30th of Dec 2014 at IIT, Madras. IIT, Madras gave a short presentation on the proposed solution. The committee members raised and discussed various issues relating ‘Brown-out’ technology. Selection of proper voltages, changes needed at home and substation side, load management and costing of the solution were discussed for the implementation of this solution. Members discussed the rationale behind the brown-out (BO) technology and selection of the voltages used during brown-out (BO). The details are given below. Prof. D. Thukaram, Indian Institute of Science, Bangalore and Prof. Shanti Swarup together shared a presentation raising few clarifications on the implementation feasibility of UDC/BO. They mentioned that providing 24x7 power supply using UDC was a very good and the idea is worth investigating as it provides some insights into the realm of DC power distribution along with AC line for reliable power supply to houses/ rural distribution. In the presentation, Prof Shanti Swarup and Prof. Thukaram raised concerns on voltage profile, Line losses, voltage drop calculations along the length of the feeder, reactive power requirements at the substation. A single line diagram (SLD) of the UDC implementation for better understanding and analysis was asked in his presentation. The first question was with respect to line-losses, transformer-losses and line-loading and whether the proposed schemes worsens any of these parameters. Prof Krishna Vasudevan of IIT, Madras gave a presentation on these issues. The SLD of UDC/Brown-out implementation (given in Annexure 2) was described. It was explained that UDC/BO is operated at lower voltage levels. As a result, at lower voltage, flux density levels in the transformer core comes down; this would mean lesser losses in the core and lesser heating. In the UDC operation, low voltage is accompanied by a lower power operation as well - this ensures that current in the windings is much lower than rated conditions. This is quite opposed to normal voltage sag situations where current flowing could be much higher than normal levels if constant power loads are deployed by the users. On a lower voltage operation, surge levels will also be correspondingly lower and hence the regular distribution transformer will be stressrelieved to some extent even on surges. It was also discussed among the members that lower voltage applied to the windings stresses the insulation lesser; this may perhaps have a beneficial impact on life of insulation, though insulation life depends on a wide variety of factors. Dr. Thukaram, Dr. Shanti Swarup and the other committee members were satisfied with the answers. Prof Thukaram IISc, Bangalore, Prof Shanti Swarup, IITM and Dr.Sivakumar, IIT Hyderabad also raised questions on the Transmission & DC distribution losses during Brown-Out in their presentations. These queries were discussed in the committee. IITM team, with the help of SLD of UDC implementation, explained that there is no DC transmission line from the feeder to the homes; instead the DC distribution is done only inside the homes. To implement Brown-out, no DC feeder is used, the DC wiring only resides inside the home. The 90 V transmission (10% of the normal power from feeder) in the line feeds this power to the UDPM, which is capable of receiving AC power either at 230V/90V. Prof. B. G. Fernandes, IITB, then discussed the loss-reduction in case of brown out condition. In this case, the supply is at 90 volts, implying a current increase by 2.5 times for the constant power. However, this is clearly NOT the case, since under brown out the AC supply at each home is cut-off and at most 10% of the full load is supported on a feeder. For every nine feeders for which power supply was cut-off during load shedding in the current approach, ten feeders are now affected and goes into brownout situation with a maximum of 10% load. AC supply to each home is cut-off and at only 100 W DC is allowed to be drawn from the grid, ensuring that the total load on this feeder would be far less than 10% of the normal load. Assuming even 10% of normal power during brown out, the current will go down by a factor of 4, when voltage goes down by a factor of 2.5. This means loss goes down by 16 times. With power going down to 10% and losses going down by 16 times, even the relative loss (loss expressed as a fraction of delivered power) goes down by at least 1.6 times. The details are shown in Appendix 8. The committee members were satisfied that both absolute as well relative losses will go down during Brown-out. Some members of the committee then raised a query whether voltage reduction on distribution line was at all required during Brown-out. Questions were also raised on changes to be carried out at substation. The IITM team discussed the substation changes and the rationale behind voltage-drop selection: A reliable and guaranteed instant signaling is, achieved by dropping the voltage level of the 10% power transmitted during brown-out by say 2.5 times. This is achieved at the sub-station by using a tap on the 33kV/11kV transformer, or adding a 2.5:1 transformer at 11kV output (the block diagram of BO mechanism is provided in Figure 1 of Annexure 1). This transformer/tap is may also be rated for 10% of the power that the 11kV line would carry during normal operation. The brown-out operation then switches the 11kV output to 4.2KV (with 10% power level). This would imply that at homes, • • Switch from 230V AC to 90V AC is used as a signalling method for brown out – no extra communication systems required. Restoration of 230V AC signals Normal power. The signalling is used to cut-off / turn-on AC power Both 230V AC as well 90V AC is converted to 48V DC with maximum power delivered being limited to 100W. The committee members discussed use of other communication systems (like GPRS and power-line communication) to enable signalling. Alternative communication methods had issues like reliability, delays and jamming. It was concluded that the proposed scheme was the most reliable, instantaneous and would work in all situations. The committee then had discussions on the issue of Power stealing with or without UDC. It was noted that power-stealing could be done during normal load operations also. Even if SMART Meters was to be used to manage load at homes, keeping the distribution at normal 230V AC, power theft could occur. The use of UDC makes it more difficult to steal to steal power. As during brown-out, the line voltage is only 90V, a voltage booster transformer would be required to connect the stolen power to loads. However, as soon as line changes from Brown-out to NORMAL, the 90V AC would change to 230V AC. The boost transformer would now increase the load voltage to about 575V, damaging the load. So one has to have a sophisticated system to steal power as compared to when only 230V is used. Also, even when appliances are designed to work at lower voltages, the normal range is 130V-240V. 90V would just cut-off most appliances. The committee concluded that even though UDC scheme was not designed to stop power-stealing (it is not an anti-theft system), the proposed UDC scheme would help in reducing power-theft. The committee members raised clarifications and rationale for use of 48 V DC at the distribution. Prof B.G. Fernandes made an analysis of distribution losses at homes incurred while using 48 V DC supply, as compared to using other safe voltages like 24V and 12V DC. The committee concluded that for voltage lower than 48 V, the wiring losses will be huge. It was noted that safe voltage was below 60 V and considering the ripple, 48 V will be safe. The use of 48V DC widely used in telecom industry also gives confidence for its selection as a good candidate. The telecom industry has been using this standard for over two decades and has come up with sufficiently reliable protection and safety circuits. Also, the distribution losses at the homes for 48V DC for 100W would be minimal even if existing wiring was used. The committee concluded that 48V DC is the best choice for in-home low-power distribution. Having examined all the issues in two meetings, the Committee Conclusion on the TOR on Technical Feasibility: Yes, the UDC solution is technologically feasible. Instant signaling is possible with the innovative signaling solution proposed. Losses are lesser than the normally used 230V AC on the transmission lines. Protection and required control circuitry are well designed. The committee concluded that UDC proposal to ensure 24 x 7 power supply at homes was technically a sound solution. 2. The Cost Review Meeting held on 3rd Feb, 2015 at IIT, Hyderabad For discussing the implementation of BO technology and to gain an insight to the market, scale and production of the technological solutions proposed, the committee invited designers and vendors from the industry to participate and give recommendations. The committee discussed on the financial viability of the UDPM module to be installed at home for UDC implementation. The representatives from companies; Mr. Rathore, Genus, Srinivas Swaminathan from Power Integrations, Dilip Shetty , consultant appointed by Power Integrations presented the costing of the module. The costing of these two modules at 100K volume and their sub-parts is as given in Table 1. The industry representatives mentioned that the pricing was still being worked out. The Current BOM for 100K volume is close to Rs. 1700, but they were confident that the pricing could be brought down close to Rs 1500 at 100 K volumes; at 10M volume, and pricing is expected to be Rs 1200. Some members of the committee examined the sub-modules and Dr. Bhuneswari wondered why the pricing for the AC-DC convertor was so high. Dileep (consultant to PI) explained that the convertor has a power-factor correction and is expected to have very low losses all the way from 30W to 125W. The committee members concluded that the cost target were reasonable and are achievable. In high volumes (tens of millions) the UDPM installed at home was possible at ₹1200 per home. The discussions then moved on to the costing of the equipment required at the sub-station. The industry representatives; A. Sridhar Reddy, MD, ESENNAR Transformers, Mr. Venkat Ramarajan, Solarsis Private ltd. and Prof. Krishna Vasudevan from IIT, Madras presented the detailed methodology, and costing for the implementation (given in Appendix 4 ) to be carried out in different kinds (Greenfield and existing) of sub-station. Mr. Venkat and Mr. Sridhar Reddy presented the pricing for changes required at Sub-station for UDC implementation. They presented the scheme for implementing Brown-out (BO) and the field scenario implementation at Madurantakam, Tamil Nadu. Schematics and additional costing for different options for implementing BO by stepping down the voltages depending on Greenfield or existing Substation modification would be in between 283 to 580 per home respectively. The committee examined different options provided and opined that the implementations were indeed feasible and that the costing of changes required at the sub-station for UDC implementation was found to be reasonable. The committee concluded that the substation changes for large scale (tens of millions of homes) implementation of UDC would cost no more than ₹500 per home. 3. Conclusion: The committee feels that Project-UDC is a promising solution to help bridge the gap between power supply and demand. With the detailed discussions and contributions from industry representatives, the committee members conclude this solution to be technically and economically viable. A study / implementation over a larger number of substations and feeders (typically few hundreds) would help establish the scheme and its operational and techno-economical features. Annexure 1: Concept of Brown-out Uninterrupted power to homes is achieved using a concept called “brown-outs” (BO) where some power, say 10%, would continue to be fed on the grid even during power cuts. This would ensure 24X7 powering of basic amenities like lights, fans and TV. During Brown-outs, 90% power in a locality is cut rather than 100%. This significantly impacts the process of balancing of supply with demand. However Brown-out poses two problems: 1) Will homes not draw whatever they want during a brown-out, resulting in overloading and line failure? 2) Is 10% power meaningful and useful to the consumer? The first problem is overcome by delivering power from the existing single distribution grid line to homes on two circuits. One is the existing 230V AC unlimited power (subject to fuse ratings, of course) circuit which is cut off during brown-outs (load-shedding). The second circuit carries a limited amount of power (10% of maximum power, or say 100W) and is available during normal as well as brown-out states. As no home can draw more than 10% power during brown-outs, the distribution line is not overloaded. The second problem is overcome by providing this limited, but uninterrupted, power in DC form. It can therefore be used only with DC appliances. This is designed to leverage the fact that a DC-powered LED tube light consumes 40% of the power, compared to an equivalent lumens AC powered CFL tube light. Similarly a DC-powered BLDC fan uses only 40% of the power used by an equivalent AC-powered induction fan. Further, the fact that a TV (LCD/ LED), laptop, tablet, cell-phones or any other electronics uses only DC power, powering them using DC power-circuit would save 25-50% power loss. It is because of this that the 100W DC power is not equivalent to a 100W AC power. This DC power can energize 2 fans, 3 lights and a cell phone charger, simultaneously – which would otherwise require about 250W of AC power. Alternately, one of the fans can be switched off to turn on a 24” LCD/ LED TV, along with its set-top box, within this 100W. Substation Requirements To implement UDC, three things are required: 1. Carry out load shedding by cutting of 90% of power (instead of 100%) 2. Provide power within homes from grid in two circuits 3. Ensure that instant cut-off of the AC line takes place, when load shedding is implemented This requires that an instant signaling from the sub-station (where the load shedding is carried out) to each home, reliably, so that AC power is cut off during BO. Similarly, when normal power is restored, the signal should enable restoration of AC power. A reliable and guaranteed instant signaling is, achieved by dropping the voltage level of the 10% power transmitted during load shedding by say 2.5 times. This is achieved at the sub-station by using a tap on the 33kV/11kV transformer, or adding a 2.5:1 transformer at 11kV output, as shown in the Figure 1. This transformer/ tap is also limited to 10% of the power that the 11kV line would carry during normal operation. The brown-out then switches the 11kV output to 4.2KV (with 10% power level). 33KV TRANSFORMER In the "Brown Out" operation, low voltage is accompanied by a substantially lower power operation as well - this ensures that current in the windings is much lower than rated conditions. Hence copper losses 11KV Black-out • • Brown-out • Home/shop 11KV/4.2KV DT Some 10% of power TRANSFORMER (2.5 : 1) 4.2KV Low Voltage cutoff Instead of complete black-out feed a lower-voltage small power to homes Industries / Large Establishments Figure 1: Brown-out Mechanism at sub-station are also lower than rated normal conditions, leading to lower heating levels. This is quite opposed to normal voltage sag situations where current flowing could be much higher than normal levels if constant power loads are deployed by users. Also, on a lower voltage operation, surge levels will also be correspondingly lower and hence the regular distribution transformer will be stress relieved to some extent even on surges. The existing AC meter can be used AC Meter 230V/90V 230V/90V AC DC Meter UD UDPM Home Figure 2: Functional Block diagram for UDPM Since the power is in AC form, it travels on the 11kV distribution line in a normal manner. Losses in the distribution line does not increase during brown-out even though there is a drop in line voltage, as power carried is now only 10% of the normal power. The DT steps down the 4.4kV on distribution voltage to about 90V on each phase before it is fed to homes. Power to industry / large offices is cut-off during brownout using a Low Voltage Cut Off unit (LVCO). At homes, this line now feeds a unit called an UDPM (Uninterrupted DC Power Module), which is capable of receiving either 230 V AC or 92 V AC power. The output from this box would drive 2 circuits (power-lines) as shown in Fig. 2: - A 48V DC line on which will be allowed a maximum of 100 W, and services DC devices A 230 V AC line, fed through existing AC meter, to service all the AC devices. Figure 3: UDPM a) As finished Product b) PCB During a brownout, the 230V AC output will be cut off, but the 48V DC line will be on and will continue to power the DC equipment. The UDPM is also designed to support Bluetooth connectivity and RS 485 connectivity for DC meter readings, other management as well as integration with smart meter. The PCB of UDPM and finished UDPM product are shown in Figure 3a and Figure 3b. The POC has shown that UDC is working without any hitches. The trials at Moinabad in Telangana also re-emphasize this. ………………………………………………………………………………………….. Annexure 2: SLD for UDC Annexure 3: UDPM Specifications and Functionalities UDPM functionality can be divided into two modules: • • AC-DC converter Communication and Control The specifications of these modules are given in Table 2.1. TABLE 2.1: UDPM MODULES AND THEIR SPECIFICATIONS Modules M1 : AC Converter - DC Description Specification Input Voltage Range 80~265Vac Output DC Voltage (Programmable) 45-51 V Output Current 3.125 A Rated Power Output 150 W Line Regulation ±1% Power Factor @ 80 Vac 0.99 (@ Full Load) @ 230 Vac 0.97 Efficiency (max.) @ 130 W 94 to 95 % M2: Communication and Monitoring Controller for monitoring and protection, Low voltage sensing and DC metering and DC cut off at 100 W UDPM Module Dimension(l*w*h) 160*95*45 mm Annexure 4: Cost Estimation for Sub-Station Implementation Annexure 5: Minutes of First Meeting Department of Science & Technology National S&T Entrepreneurship Development Board (NSTEDB) Minutes of the First Meeting of the Expert Advisory Committee on Solar Power and Energy Sector held on 17.11.2014 in IIT Delhi. The list of members who attended the meeting is given at Annexure-I. 1. Shri H.K Mittal, Head NSTEDB, DST welcomed the members for the first meeting. He emphasized the specific role of the Committee , whose contribution would result in time bound and action oriented outcomes paving way for innovative approaches to solve some of the existing challenges of the power sector in the national interest. 2. Prof. U.B. Desai, Chairman reiterated the broad terms of references of the Committee and also suggested the composition of subcommittees (as per the Annexure –II ) , each being entrusted with the responsibility of a specific terms of reference. The subcommittees to be steered by their conveners would initiate immediate actions so as to come up with a first draft report within a month’s time. 3. Industry being the key stakeholder in power, it was suggested to involve Industry in the various sub committees i.e for smart meters, DC Solar, Off-Grid Solar, etc. 4. Prof. Bhaskar Ramamurthi gave the presentation on the Brown out proposal. He along with Prof. Jhunjhunwala shared their experience on the technical and commercial feasibility of the brown out involving voltage drop at substation, by providing 48v DC line at home along with the regular AC supply for ensuring availability of some power for common household usage in the event of peak load. 5. The Committee felt that 24x 7 reliable electricity supply involves participation of other key stakeholders including nodal govt. deptt, Electricity Boards, utilities and grid management etc. The Committee considered the issue very challenging for coming out with an effective roadmap within 90 days. The members may suggest some innovative approaches on the matter to make it reliable and effective for implementation. 6. Whitepaper on focused domain of power electronics ( Prof. BG Fernandes and Prof. G. Bhuvaneswari to contribute and circulate the same within 21 days ) with a road map for India for taking dominant position in the area, comprehensive short term and long term ( 5-10 yrs) framework for R&D , formulation of broad topics, emphasizing development of prototypes and possibly new product development, cohesive research groups, creating centers of excellence for undertaking co-ordinated research, industry participation and requirements of funds etc. It was also suggested to begin with, all the IITs involved in the expert group may take the lead in this direction. 7. It was decided to hold the next committee meeting in Chennai. 8. There being no other point, the meeting ended with a vote of thanks to the Chair. List of Participants 1. Prof. Uday B. Desai, Director IIT, Hyderabad - Chairman 2. Prof. P.P.Chakrabarti, Director IIT Kharagpur - Member 3. Prof. Bhaskar Ramamurthi ,Director IIT Madras -Member 4. Prof. Timothy Gonsalves, IIT Mandi -Member 5. Prof. Ashok Jhunjhunwala, IIT Madras -Member 6. Prof. B.G Fernandes, IIT Bombay -Member 7. Prof. D. Thukaram, Indian Institute of Science, Bangalore-Member 8. Prof. S.A Kharpade, IIT Bombay -Member 9. Prof. K. Shanti Swarup, IIT Madras -Member 10. Prof. G. Bhuvaneswari , BITs , Hyderabad -Member 11. Prof. Siva Kumar K, IIT Hyderabad -Member 12. Sh. H.K.Mittal, Sc. G and Head- Innovation and Entrepreneurship(NSTEDB) -Member 13. Dr. Anita Gupta, Sc. F and Associate Head-Innovation and Entrepreneurship (NSTEDB), DST -Member Secretary 14. Anand Pandey, Sc. B , DST- Meeting Organising Committee Annexure 6: Minutes of Second Meeting Minutes of Meeting of Second Meeting of Expert Advisory Committee on Solar Power and Energy Sector National S&T Entrepreneurship Development Board Department of Science and Technology At IITM Board Room, IIT Madras on 30th Dec., 2014 from 10am to 4pm Prof. U.B. Desai, Chairman of the committee, welcomed all members of the committee and briefed on the minutes of last meeting, held on 17th Nov, 2014. 1. Some of the common questions raised by members were to enquire the impact of Decentralized Solar on Grid Power when the power is fed back to the Grid from the solutions proposed by IIT Madras. It was clarified that no power is fed back to the grid through any of the solutions proposed by IITM. Power generated by solar is directly used to feed the loads. 2. Prof. Bhuvneshwari raised her concern for Battery overcharging when generated power is more than the power consumed by loads, which would impact the battery life adversely. It was cleared that, IITM solution is designed such that solar will operate at non MPPT if it goes out of range and finally cuts off. This means that SPV output will be zero whenever there is no load connected to it. 3. Prof. Thukaram’s presentation was discussed which was largely focused on issues of Reverse Metering. Though solutions designed at IITM are not reverse feeding, the committee felt these issues must be taken up as research issues, which are included in the research areas (page2). His concern of DC feeder losses being higher than the AC feeder losses was also clarified. To implement Brown-out, the designed solution does not provision separate DC wiring. No DC feeder is used, the DC wiring only resides inside the home. 4. Members also raised whether 230V, and not reduced voltage, can also be used during brownout. The complexity of ensuring signalling makes this difficult. The issue of Power stealing with Brown-out situation was also raised. It was agreed that at 90V, it is much more difficult to steal, as even if voltage booster transformer is used to operate at 90V, sudden switch to normal (230V) will give over 500V damaging the device. So one has to have a sophisticated system to steal power as compared to when only 230V is used. Also, even when appliances are designed to work at lower voltages, the range acceptable is 130V-240V. 90V would just cut-off the appliance. Brown-out provides lifeline to consumers and supports 10% of the designed capacity. 5. Prof. P. P. Chakraborthy presented features, challenges and implementation issues for Smart Meters. During discussions, various issues emerged which need research attention, and are included in the research areas. The following questions were raised: a. Whether smart-meters can be used to selectively carry out instantaneous (unscheduled) black-out in a substation area when required. It was accepted that scheduled black-out and brown-out is possible. However the unscheduled brown-out (when frequency of power falls below a certain number and a mandatory instantaneous shut-down or load reduction is required so that grid does not trip) will be a problem, for every meter would have to be instantaneously informed of the BO event. It was felt that wireless Internet (or other forms of Internet) will have some latency; the best would be to cut power instantaneously, send messages to each smart-meter to go into brown-state, and when acknowledgement is received from each meter, power is restored. This could be done in 5 seconds to a few minutes, which may be acceptable. It was pointed out that if wireless Internet was used and a user puts a small jammer close to the meter, the technique would fail. This can result in power-cuts not being implemented could possibly result into grid-failure. b. A question was also asked whether the frequency measurement at each smart-meter could be used to reduce load at each customer-end. It was pointed out that gridfrequency is not limited to a substation area but will be same for the whole state / region. So the load-reduction / shedding, cannot be on selective basis, but would have to be same for all the customers on the grid. 6. Prof. Timothy Gonsalves, presented the standardization efforts for DC wiring and appliances. It was brought out that it is important to get approvals from CEA, CERC and state regulation commissions. LVDC, IEC and IEEE standardization efforts should also be followed up. 7. Rationale for use of 48V DC was discussed. It was noted that safe voltage was below 60V and considering the ripple, 48V will be safe. Fernandes pointed out that for voltage lower than 48V, the wiring losses will be huge. Committee members visited the IITM Brown-out demo facility and were also demonstrated the Off Grid Home (OGH) solution. Committee suggested that homes which are not connected to the grid, should be connected to OGH solution and that the work can be progressed aggressively. Next meeting for this committee is planned at IIT Hyderabad on 3rd Feb. with following schedule. 9.30 am– 11:30 am Sub-Groups meet 11.30 onwards Main Group Meet Action Points: 1. Include the common questions asked by members of the meeting as part of FAQ of solutions proposed by IITM. 2. Economics and Guidelines to be worked out to reach to 30% Off-grid homes. - Prof. Ashok Jhunjhunwala. 3. To list the indigenous parts in the solutions proposed and link it to “Make in India” program. – Prof. Bhaskar Ramamurthi 4. For technology and costing of Brown-outs, industry should be involved and be invited in the next sub-group meeting. 5. Smart meters technology to be reviewed in detail and be discussed – Prof. P. P. Chakraborthy. 6. Test Beds to be set-up at various places for measuring and validating the DC devices. To start with, this facility be provided at IIT Madras, IIT Hyderabad, IIT Mandi, IIT Kharagpur and IIT Bombay. – Prof. Krishna Vasudeva, Prof. B. G. Fernandes, Prof. Bhuvneshwari and Dr. Siva Kumar. 7. Indian defined Standards to be focussed and followed for DC devices. – Prof. Timothy Gonsalves. 8. For wide reach, training is important. Training manuals and videos should be prepared. Research Areas: 1. Impact of Solar Decentralized power on Grid: stability issues, load modelling, PV scalability. 2. Reverse protection at Sub Station in Indian context. 3. Communication with Grid for parameters measurements and control to avoid Grid collapse and also on amount of reverse feeding by decentralized solar systems. a. To look out the options for communication mechanism: Power Line carrier communication, LTE or separate wideband frequency etc. b. During power shortages, managing scheduled as well as unscheduled black-outs. 4. Reliable solution to handle line tapping. 5. Control and location profiling for smart meters. Defining role of smart meters at homes and at Sub-stations. Annexure 7: Minutes of Third Meeting Minutes of Meeting of Third Meeting of Expert Advisory Committee on Solar Power and Energy Sector National S&T Entrepreneurship Development Board Department of Science and Technology At Conference room, IIT Hyderabad on 3rd Feb., 2015 from 9.30 am to 3pm Prof. U.B. Desai, Chairman of the committee, welcomed all members of the committee and the meeting started with the introduction 1. Mr. Dileep Shetty, consultant, IIT Madras presented the design, features and costs associated with UPDM. Various design and costing issues were discussed. It was brought out that major cost of UDPM is due to magnetically latched relays and high conversion efficiency. At present, the BOM including the manufacturing cost for 100K volume is close to 1700. Targeted costs are as follows: a. For 100K volume, total cost of 1500. With manufacturing and 15% taxes, the price may be close to 2000. b. For 10M volume, final pricing expected to be 1200. The committee noted the pricing and found these to be a reasonable estimate. Some suggestions made by the committee: a. Design should take care of efficiencies, power factor correction, ripples and harmonics b. Specifications may be opened to all manufacturers to come up with lower price quotes. 2. Mr. Venkat Ramarajan, CEO, Cygni, along with Mr. A. Sridhar Reddy, MD, ESENNAR Transformers, presented the Sub-station side of UDC implementation. He explained the scheme for implementing Brown-out (BO) and the field scenario implantation at Madurantakam, Tamil Nadu. Three more places at Andhra Pradesh, Orissa and Kerala have been commissioned. Schematics and costing for different options for implementing BO by stepping down the voltages depending on Greenfield or existing Substation modification were discussed. For implanting BO, the cost is 283 to 580 per home at substation. The committee discussed the pricing and found it to be reasonable. Some suggestions by the committee: a. An auto step down transformer can be used instead of isolated transformer which can be cost effective. But, protection for auto transformer can be a problem as there is no isolation. This needs to be checked for a reliable and cost effective solution. b. Design cost for BO implementation may also be included. End to end cost for consumer may also be worked out 3. Dr. Shantidev Mohanty presented communication Interface for smart meters. Some important features and issues with smart meters were briefed. He presented that existing telecom standards (cellular or otherwise) cannot be used for Smart Meters communication and informed that the new IEEE standards, IEEE 1701TM and IEEE 1702TM, have stated that existing telecom standards should not be used for Smart meters communication. Almost all manufacturing companies are designing end-to-end solution for smart meters. Any MAC and PHY can be designed for the desired capacities. Japan uses LTE, Italy uses Power Line Communication, Canada uses Wi-Max for smart Metering. So, communication can be done based on any one or multiple ways, as long as the spectrum is sufficient to support the requirements. a. Solution using IEEE802.11ah to be explored for smart metering and connecting to the central system. b. Business case for smart meters and criticisms can be prepared and shared. c. Security issues to be addresses. d. Serious R & D, Policy recommendation and test beds for Smart Meters. 4. Committee feels a dire need for R&D in Power Electronics. A sub-group should focus on R&D, education and importance of Power Electronics. A good white paper can come-up. Innovation labs/centres on Power Electronics systems should be set up. Some action points and Research areas identified during the discussions of this committee are as below. It was decided to invite Reji Kumar Pillai, President, India Smart Grid Forum to the next meeting. It was felt that a session on Electrical Vehicles should also take place in next meeting. Chairman thanked all members, industry representatives and invitees for attending the meeting. The meeting concluded with fixing the schedule for next meeting which is planned at IIT Delhi on 23rd March, 2015. Appendix 8: Understanding losses during Brown-out Let us assume that a city has 200 feeders (distributed in multiple sub-stations) of 11 kV, each carrying a peak load of 1 MVA. That implies that the peak demand that the city can have is 200 MVA. Assume that in a peak hour (when everyone is using peak-load), the total supply to the city available is 164 MVA. Currently used Approach In the currently used approach, when 164 MVA of supply is available and the demand is 200MVA, is to carry out load shedding. 36 of the 200 feeders will therefore be cut-off (load-shedding), resulting into black-outs for all those fed by those feeders. 164 feeders will be ON and the supply and demand will both match at 164 MVA. Nearly one fifth of the city will suffer black-out. The Brown-out Approach to be used by proposed UDC solution The new approach suggested by IITM, will not do any blackout (or full load shedding). However only 160 feeders (four less than that in currently used approach) will be allowed the full load of 1 MVA each. The remaining 40 feeders will have brown-out. Each will be eligible for 100 kVA instead due to the power restriction on the dc outlet. The total load will again be 160 x 1 MVA + 40 x 100 kVA or 164 MVA. Thus the supply and demand will match. However now 40 feeders will get limited power (of 10% of their peak) and each home on these feeders will be eligible for limited power in the form of DC. Let us now compare the two approaches. The full power that was provided to four feeders in the currently used approach, is now being provided as limited power to 40 feeders. Loss calculations for the two approaches Current approach The four feeders each carry power at 11kV power and supply 1 MVA. The current per phase in each feeder is therefore 1000/(11√3) or 52.5 A. Assuming R as the line resistance per phase in each feeder, the total line losses will be 3I2R or 3(52.5)2 x R. For four feeders, the total line-loss L1 is 12 x (52.5)2 x R. UDC Solution The computations below assume that there are a total of 200 feeders each having a rated load of 1 MVA. To illustrate the power scarcity conditions, power availability of 164 MVA is considered. Under normal conditions, supply to 36 feeders would have to be cut to match the supply and demand. 164 feeders would be energised. Under the proposed structure, it is assumed that the requirements for UDC have been implemented in all the 200 feeders, so that brown-out could be effected on a rotational basis if required. The calculations presented assume the feeders are identical in structure and also loading. As the scheme implementation is spread to various substations, some additional coordination is required among the substations. The scheme utilization is for limited hours on each feeder when load-shedding takes place, and during brown out condition some consumers not having dc loads will not be benefitted. Under this situation, 160 feeders would be supplied with rated power and 40 feeders (36 which would have been cut and another 4 more), spread across various substations would be operated under brown-out mode. Thus the power that would have been supplied to 4 feeders is instead used over 40 feeders. The power from these four feeders is now being provided to 40 feeders; each feeder can supply a maximum of 100 kVA. However, this is given at 4.4 kV. The current in each feeder is then 100/(4.4√3) or 13.1A. The line losses in each feeder is again 3I2R or 3(13.1)2 x R. For 40 feeders, the total line-loss L2 is therefore equal to, 120 x (13.1)2 X R. To compare the two solutions we can now compute the relative line-losses in the two approaches as L1/L2 = [12 x (52.5)2 x R] / [120 x (13.1)2 x R], which works out to be 1.6. Thus the relative loss in Brown-out goes down by 1.6.