AC TENDER POYAPALLY - State Bank of Travancore

Transcription

AC TENDER POYAPALLY - State Bank of Travancore
(ASSOCIATE OF THE STATE BANK OF INDIA)
KOLLAM ZONAL OFFICE
DGM /KLM/ENG/PYPL/AC/15-16
04/04/2015
TENDER NOTICE
State Bank of Travancore invites sealed competitive tenders for the work of
‘SUPPLY,
INSTALLATION,
TESTING
AND
COMMISSIONING
OF
AIRCONDITIONERS at our POYAPALLY BRANCH (REGION 2 KOTTARAKKARA ) from manufacturers / Authorized dealers of reputed brands
having service facility in KOLLAM/TRINAVDRUM Districts in Kerala.
1
2
Nature of Tender
Period of completion
3
Address for
submission of
tenders.
4
Last date of receipt
of Tender
Time of opening of
Tender
5
Competitive
Within 15 days from the 7th day of date of work
order
THE ASSISTANT GENERAL MANAGER
REGION II
STATE BANK OF TRAVANCORE
REGIONAL OFFICE ,
Highland Hotels and Resort Complex
Opposite to KSEB
Shencottah National Highways
Kottarakkara
3:00 PM on 20.04.2015
3.30 PM on 20.04.2015
Further details regarding the tender for the work can be had from Assistant
Manager (Electrical Engineer) DGM Secretariat, State Bank of Travancore, Zonal
office, Kollam Mob:- 9020920987, 8086669186 /0474-2769219 during working
days. The Bank reserves the right to accept or reject any or all tenders without
assigning any reason whatsoever.
THE ASSISTANT GENERAL MANAGER
REGION II
STATE BANK OF TRAVANCORE
REGIONAL OFFICE ,
Highland Hotels and Resort Complex
Opposite to KSEB,Shencottah National Highways,Kottarakkara
SIGNATURE & SEAL OF TENDERER
1
IMPORTANT NOTICE / INSTRUCTIONS TO TENDERERS
1. The contractors who are already having three contracts on hand from
State Bank of Travancore (ie; 3 nos. work for which work orders have
already been issued by the concerned department / controller) are not
eligible to bid for this work.
2. The contractors who are bidding for this work should furnish the details of
work on hand from State Bank of Travancore in a separate envelope
suitably super scribed “Details of works on hand with SBT” in the from of
a declaration as per the format enclosed (Page no.3)
3. The tender of the Contractor/s who do not furnish the details of work in
hand or furnishing false details will be summarily rejected.
4. The Contractor / s who are awarded work on the basis of false details are
liable to be removed from Bank’s Panel and their security deposit will be
forfeited.
5. The cover containing the declaration and details of work in hand from
State Bank of Travancore (item no.2 above) will be opened before
opening tenders.
6. The tenders of contractors who satisfy the above stipulation (item no.1
above) only will be opened and others will be rejected.
7. Contractors not having any work should furnish a NIL statement.
All contractors are herby instructed to read the above instructions carefully
and submit the tenders (all pages excluding page no.3 of this tender
document) and the duly filled Declaration as per format enclosed (Page
no.3 of this tender document) in separate sealed covers, suitably super
scribed as the case may be and to be enclosed in a third cover marked
‘SUPPLY,
INSTALLATION,
TESTING
AND
COMMISSIONING
OF
AIRCONDITIONERS at our POYAPALLY BRANCH (GROUND FLOOR)
(REGION 2 - KOTTARAKKARA)
SIGNATURE & SEAL OF TENDERER
2
DECLARATION
(to be filled by the Tenderer & to be submitted a separate sealed cover)
To
The Deputy General Manager
State Bank of Travancore
Zonal Office
Kollam
I
/
We………………………………………………………………………………….,
hereby declare that I/We am/ are not undertaking three contracts on hand from
State Bank of Travancore. I/We am / are aware that furnishing of false
information will lead to removal from the Bank’s Panel and forfeiting of the
security deposit. I/We am /are also attaching the details of work in hand from
State Bank of Travancore for your reference.
Sl. No.
Details of work in hand from State Bank of Travancore
Name of Work
Name of Zone /
Date of award of
Region
work
1
2
3
4
Place :
Date:
Name, Signature and Seal of the Contractor
Note: All contractors are herby instructed to submit the tenders (all pages
excluding page no.3 of this tender document) and the duly filled Declaration as
per format enclosed (Page no.3 of this tender document) in separate sealed
covers, suitably super scribed as the case may be and both the covers are to be
enclosed in a third cover marked ‘SUPPLY, INSTALLATION, TESTING AND
COMMISSIONING OF AIRCONDITIONERS at our POYAPALLY BRANCH
(GROUND FLOOR) (REGION 2 - KOTTARAKKARA)
SIGNATURE & SEAL OF TENDERER
3
TERMS & CONDITIONS
1
2
Quotation Validity
Period of Work Completion
3
Date of Commencement
4
Defect liability period
5
Earnest Money Deposit
6
Security Deposit
7
Performance Guarantee
8
Compensation for
Liquidated Damages
9
Interim Payments
10
Extra work
11
Deductions from Bill
3 months
15 days
7th day from the date of work order or date of
handing over of the site whichever is later.
12 Months from the date of completion.
Rs.6,000.00 by way of Demand Draft
favoring Assistant General Manager Region
II, SBT payable at Kottarakkara
2% (including EMD) of the work order value
by way of Demand Draft favoring Assistant
General Manager Region II, SBT payable at
Kottarakkara. To be submitted before
commencement of work. Will be released on
successful completion of the work.
Bank Guarantee for 5% of the work order
value to be issued by Banks other than State
Bank of Travancore and to be submitted
Assistant General Manager Region II, SBT
payable at Kottarakkara. Performance
Guarantee is to be submitted before
commencement of work and will be released
on successful completion of the work.
For delay beyond completion time without
valid reasons, Rs.1000/- per day will be
levied. (max. 10% of the final bill amount)
60% of the bill amount for completed items
only for a minimum value of bill amount of
Rs. 2,00,000/Cost of materials and labours + 10% for profit
and overheads
Retention Amount @5% of the final bill
amount and will be released on successful
completion of the defect liability period of one
year.
SIGNATURE & SEAL OF TENDERER
4
DETAILS OF SERVICE FACILITY IN KOLLAM/TRIVANDRUM DISTRICT
Name of Contact Person / s :
Contact Telephone Number :
Full Office Address :
Note: Failure to respond to the test calls made by us on the above contact
number and submission of false information or wrong address will lead to
disqualification of the bidder and their offer will be summarily rejected.
The offer from those bidders who have no service facility in kollam /
trivandrum district will be summarily rejected.
TERMS & CONDITIONS
1. The quoted rate should include all taxes, levies, octroi, cost of
transportation & loading and unloading at site.
2. The quoted rate should also include the cost of drain piping (full length),
copper piping up to 5m and wiring between indoor and outdoor unit for
single phase split air conditioners.
3. Time period for completion is 15 days from the date of Work order.
4. Delay beyond 15 days will attract compensation towards liquidated
damages @ Rs.1000/- per day.
5. No advance payment.
6. 95% of the bill amount will be released on satisfactory
commissioning of the airconditioners and balance 5% on
satisfactory completion of defect liability period of one year.
7. All Civil works under suppliers scope and wall openings made if any
should be sealed using cement mortar only and should be finished to the
plastering level.
8. The single phase air conditioners should have a comprehensive warranty
of 1 year + additional warranty of 5 years for the compressor.
SIGNATURE & SEAL OF TENDERER
5
AIRCONDITIONING WORKS OF POYAPALLY BRANCH
Brand Name:- Voltas
Blue star
Carrier,
LG
Hitachi
Panasonic or equivalent
Name of Brand:- __________________________
Comprehensive Warranty :- _______________________
Compressor Warranty:- _______________________
SIGNATURE & SEAL OF TENDERER
6
SCHEDULE OF ITEMS
Sl.
No.
Item Description
Qty. Unit
Supply, Installation, Testing and commissioning of
minimum 3.0 TR capacity, CASSETE type split air
conditioners with first fill of refrigerant & electrical
wiring between indoor and outdoor units complete.
Rate
Amount
Indoor unit ceiling hung comprising cooling coil,
evaporator fan with motor, filters, insulated drain
pan, drain pump, expansion valve, refrigerant filter
drier with codeless remote control unit, etc.
Outdoor unit comprising three phase hermetically
sealed scroll compressors, condenser coil with fan
& motor, starters / controls / cutouts / relays etc.,
mounted inside a powder coated sheet metal cabinet
of 2mm thick, duly treated for corrosion protection
complete, mounted on ribbed rubber pads.
a) Capacity 3.0TR , 3 Phase with scroll Compressor
1
4
Set
40
m
4
Set
40
m
6
Supply and installation of 1.0 TR 5 star rated Split AC
with cordless remote including installation charges.
(for server room) and including copper piping upto
5m.
3
Nos
8
Supply and Installation of 4 kVA V-Guard Stabiliser
2
Nos.
9
Supply and installation of timer for server ACs.
(1 to 12 hour user selectable)
1
No.
10
Supply and installation of metallic support for
mounting the outdoor unit of split ACs
3
Nos.
Supply and erection of copper piping using hard
drawn copper (1mm thick) refrigeration pipe
complete with bends, Elbows, Supports, Insulation
etc. interconnecting indoor and outdoor units (both
suction and discharge lines) along with necessary
electrical copper wiring including earthing conductor
in rigid PVC conduit.
2
Supply and erection of angle/channel support for the
condenser unit so that it can be mounted on the wall.
4
Supply and erection of 25mm dia insulated PVC drain
water piping (4kg/sq.cm.) with a ‘U’ bend at its end.
5
T O T A L
A M O U N T:
SIGNATURE & SEAL OF TENDERER
7
ANNUAL MAINTENANCE CONTRACT (AMC) :
FOR 5(FIVE) YEARS AFTER WARRANTY PERIOD
Note: The AMC charges to be quoted below will be considered for deciding the
lowest tenderer. The offer from those bidders who have not quoted for AMC will
be summarily rejected.
1ST Year after warranty Period:Capacity
Rate per year
3.0 TR AC
1.0 TR AC
Rs.................. + Service
Rs................... +
tax per year
Service tax per year
Quantity
4 Nos.
3 Nos.
Total AMC rate per
Rs.................. + Service Rs .................. + Service tax
year (Rate per Year x
tax per year
per year
Quantity)
(A)
(B)
GRAND TOTAL
(A) + (B)
In words
Rs.................. ................................................+ Service
tax per year
Rupees.............................................................................
..............Only
2nd Year after warranty Period:Capacity
Rate per year
Quantity
3.0 TR AC
1.0 TR AC
Rs.................. + Service
Rs................... +
tax per year
Service tax per year
4 Nos.
3 Nos.
Total AMC rate per
Rs.................. + Service Rs .................. + Service tax
year (Rate per Year x
tax per year
per year
Quantity)
(A)
(B)
GRAND TOTAL
(A) + (B)
In words
Rs.................. ................................................+ Service
tax per year
Rupees.............................................................................
..............Only
SIGNATURE & SEAL OF TENDERER
8
3rd Year after warranty Period:Capacity
Rate per year
3.0 TR AC
1.0 TR AC
Rs.................. + Service
Rs................... +
tax per year
Service tax per year
Quantity
4 Nos.
3 Nos.
Total AMC rate per
Rs.................. + Service Rs .................. + Service tax
year (Rate per Year x
tax per year
per year
Quantity)
(A)
(B)
GRAND TOTAL
(A) + (B) + (C)
In words
Rs.................. ................................................+ Service
tax per year
Rupees.............................................................................
..............Only
4th Year after warranty Period:Capacity
Rate per year
Quantity
3.0 TR AC
1.0 TR AC
Rs.................. + Service
Rs................... +
tax per year
Service tax per year
4 Nos.
3 Nos.
Total AMC rate per
Rs.................. + Service Rs .................. + Service tax
year (Rate per Year x
tax per year
per year
Quantity)
(A)
(B)
GRAND TOTAL
(A) + (B) + (C)
In words
Rs.................. ................................................+ Service
tax per year
Rupees.............................................................................
..............Only
SIGNATURE & SEAL OF TENDERER
9
5th Year after warranty Period:Capacity
Rate per year
Quantity
3.0 TR AC
1.0 TR AC
Rs.................. + Service
Rs................... +
tax per year
Service tax per year
4 Nos.
3 Nos.
Total AMC rate per
Rs.................. + Service Rs .................. + Service tax
year (Rate per Year x
tax per year
per year
Quantity)
(A)
(B)
GRAND TOTAL
(A) + (B) + (C)
In words
Rs.................. ................................................+ Service
tax per year
Rupees.............................................................................
..............Only
The sealed cover containing all the four pages of this tender document should be
filled, signed and sealed by the bidder and ‘SUPPLY, INSTALLATION, TESTING
AND COMMISSIONING OF AIRCONDITIONERS at our POYAPALLY
BRANCH (REGION 2 - KOTTARAKKRA ) should be submitted to
THE ASSISTANT GENERAL MANAGER
REGION II
STATE BANK OF TRAVANCORE
REGIONAL OFFICE ,
Highland Hotels and Resort Complex
Opposite to KSEB
Shencottah National Highways
Kottarakkara
SIGNATURE & SEAL OF TENDERER
10