awms pty. limited - Goulburn Mulwaree Council

Transcription

awms pty. limited - Goulburn Mulwaree Council
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
Grey2Green®
Envirocell
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
www.zerotech.com.au
[email protected]
ONSITE WASTEWATER MANAGEMENT SYSTEM
A SUBMISSION IN SUPPORT OF:
1.
THE INSTALLATION OF AN ULTRA CLEAR COMMERCIAL AWTS AT 15213
HUME HIGHWAY MARULAN NSW TO TREAT AND DISPOSE THE
ANTICIPATED HYDRAULIC FLOWS STATED IN HARRIS ENVIRONMENTAL
CONSULTING’S REPORT OF MAY 2013 REF: 882ww;
2.
THE INSTALLATION OF A 10,000 LITRE COLLECTION WELL,
INCORPORATING FLOW REGULATING MEANS, TO RECEIVE THE
TREATED EFFLUENT FROM THE AWTS FOR DISCHARGE INTO A SOIL
ABSORPTION BED AT A RATE STATED IN HARRIS ENVIRONMENTAL
CONSULTING’S REPORT OF MAY 2013.
PREPARED FOR:
GOULBURN MULWARRE SHIRE COUNCIL
ON BEHALF OF:
AL- MABARAT BENEVOLENT SOCIETY LTD
95 WOLLONGONG ROAD
ARNCLIFFE NSW 2205
PREPARED BY:
Armen Mesrobian
AWMS PTY. LIMITED
SUITE 8
191 BLUES POINT ROAD
NORTH SYDNEY NSW 2060
PHONE
(02) 9460 2020
EMAIL:
[email protected]
DATE PREPARED: MAY 2013
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
Grey2Green®
Envirocell
www.zerotech.com.au
[email protected]
STATEMENT
The strategy for an effective means of treating and disposing sewage and wastewaters that will
emanate from the proposed project at 15213 Hume Highway Marulan is a collaboration between
Highland Tanks Pty Ltd of Braemar NSW and AWMS Pty Ltd of North Sydney NSW.
The recommended Ultra Clear AWTS and Collection Well are manufactured by Highland Tanks Pty Ltd
at their factory in Braemar NSW.
The Envirocell treatment process outlined in the following pages was first introduced to Australia by
AWMS Pty Ltd in the late 80’s/early 90’s and is now employed in numerous situations for similar flows
and waste strengths.
The treatment processes have been incorporated into the AWTS.
Harris Environmental Consulting’s Wastewater Assessment Report of May 2013 recommends disposal
of the treated effluent into a soil absorption bed which will act as a final polishing phase in the overall
treatment process.
The effectiveness of additional treatment capabilities in absorption beds is well documented and is not
the focus of this submission.
There are NO plans to irrigate or re-use the effluent for any other purpose.
PLEASE NOTE:
ULTRA CLEAR IS A BRAND NAME OF HIGHLAND TANKS PTY LTD.
ENVIROCELL is a registered business name of AWMS (Australian Wastewater Management Strategies)
PTY. LIMITED.
Highland Tanks Pty Ltd and AWMS Pty Ltd are separate entities and do not have a financial or
management interests in one another.
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
Grey2Green®
Envirocell
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
www.zerotech.com.au
[email protected]
CONTENTS

Recommendations
Page 1

Schematic of Proposed System
Page 2

The Concept…The Process
Page 3

Engineering, Process Stability, Process Performance
Page 4

Sludge Production, Settlement & Storage
Page 4

Clarification/Settling
Page 5

Influent and Effluent Characteristics
Page 5

Management, Operation and Maintenance
Page 6

Ongoing Maintenance Service Policy
Page 7

Warranty Policy
Page 8

Warranty on Equipment Supplied
Page 8

Responsibilities and Legal Requirements
Page 9

Representative List of Key Projects
Page 10
PLANS, DRAWINGS and SPECIFICATIONS
•
•
•
•
•
•
•
CT20 – Excavation details, Installation Manual, Plan
CT20 – Written Specifications
CT20 – Electrician wiring specification
CT20 – Aerator specifications-100 litres/minute
CW10000 – Collection Well specifications, approval
CW10000 – Schematic of tank/flow regulating means
CW10000 – Flow Regulation Pump specifications
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
Envirocell
www.zerotech.com.au
Grey2Green®
[email protected]
RECOMMENDATIONS
Based on the Summary on Page 15 of the Harris Environmental Consulting Report of May 2013 REF:
882ww, AWMS Pty Ltd recommends the following:1. The installation of an Ultra Clear AWTS Model CT20 package sewage treatment system which
has a treatment capability of up to 3500 litres per day at peak.
The system is designed to treat Domestic type wastes only that will emanate from the proposed
complex.
NO Industrial wastes are to enter the system.
2. The disinfection of effluent by chlorination prior to discharge.
3. The installation of a 10,000 litre collection well, incorporating flow regulating means, to receive
the treated effluent from the CT20 and to discharge the effluent into an absorption bed at a rate
stated in Harris Environmental Consulting’s report of May 2013.
Discharge into the absorption bed will provide an effective barrier between humans and
effluent.
4. The Management and Maintenance of the System, as stated in this report, in association with
the Onsite Manager.
5. The installation of water saving fixtures to reduce the effluent load for onsite disposal.
6. The location of the system is to be as shown in Harris Environmental’s report. Any change in
the location must provide for clear access for maintenance and desludging purposes.
7. Cleaning products low in phosphates, sodium and boron should be used.
8. The On-Going Management and Maintenance of the system and the disposal means as stated
below - see section Management, Operation and Maintenance of Sewage Treatment Systems.
PAGE 1
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
Grey2Green®
Envirocell
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
www.zerotech.com.au
[email protected]
SCHEMATIC ONLY OF PROPOSED ULTRA CLEAR CT20 AWTS and COLLECTION WELL
MAY 2013…NOT TO SCALE
ULTRA CLEAR AWTS MODEL CT20 & 10000 LITRE COLLECTION WELLFOR DETAILS/CAPACITIES REFER TO ATTACHED SPECIFICATIONS
INFLOW
SEPARATION/PRE-TREATMENT
TANK
SECONDARY&TERTIARY
TREATMENT TANK
COLLECTION WELL OUTFLOW TO
ABSORPTION
BED
PAGE 2
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
Grey2Green®
Envirocell
www.zerotech.com.au
[email protected]
THE CONCEPT……THE PROCESS
The Envirocell concept employs the MICROBIAL FILM PROCESS (MFP) technology which has developed rapidly over the last
twenty years in the USA, Japan and Australia.
PROCESS FLOW……….TREATMENT PRINCIPLES
AIR SUPPLY
INCOMING WASTEWATER
SEPARATION / PRE-TREATMENT
CONTACT
AERATION
SLUDGE /SCUM RETURN
DISCHARGE TO DISPOSAL FIELDS
DISINFECTION
CLARIFICATION/
SETTLING
In the ENVIROCELL process, incoming sewage initially passes through PRE-TREATMENT chambers which are used to break
down sewage ANAEROBICALLY (in the absence of oxygen) and trap untreatable material before wastewater enters the
aeration chambers of the system.
Following reduction in the concentration of the wastewater, liquids are passed onto the second stage of the Process……
AERATION.
This section of the treatment process, the heart of the ENVIROCELL, contains purpose built AEROBIC FIXED BED
SUBMERGED FILTER MEDIUM (the CELL). The CELLS, which are strategically located in AERATION chambers, support the
growth of microbial film which is critical for the purification process.
By the diffusion of air through TUBE – AIR diffusers, oxygen supply and recirculation flows are accomplished to bring
aerated wastewater into contact with the biofilm in the CELLS.
The repeated, constant and uniform supply of oxygen to the biofilm creates healthy, reproductive, aerobic micro-organisms
which ensure excellent efficiencies in the ENVIROCELL system.
Following aeration, liquid flows into a CLARIFICATION chamber where under still conditions particles, which may have
inadvertently flown through, settle and are then pumped automatically to a pre-treatment section.
Supernatant effluent flows into a DISINFECTION chamber for disinfection, retention and automatic disposal onto landscaped
or grassed irrigation areas or, into sand mounds or dedicated sub-surface disposal areas.
Filtration, Evapo-transpiration and partial nutrient removal by means of plant/soil uptake completes the treatment process.
A monitoring system is provided to alert the owner of a malfunction in any mechanical or electrical component.
PAGE 3
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
PHONE : (02) 9460 2020
Grey2Green®
Envirocell
AAA RAIN 4UZE®
www.zerotech.com.au
[email protected]
ENGINEERING
ENVIROCELL’s design team pays particular attention to the critical aspects of sewage treatment i.e. the separation of solids
and liquids in pre-treatment chambers, the healthy growth and dynamics of micro-organisms on the CELLS, efficient settling
in the clarification chamber and finally, effective disinfection and irrigation in/from the appropriate chamber in the sequence.
Treatment Chambers are sized using authority standards as a minimum, with additional capacity provided to allow for
unforeseen circumstances that can occur in various applications.
The growth of healthy, reproductive micro-organisms is enhanced by the strategic location of diffusers in relation to the
CELLS. PEELING of suspended particles is controlled thus reducing the subsequent stress on the clarification and
disinfection of wastewater.
PROCESS STABILITY
A high degree of operational stability of the biological process is provided by means of a fixed or attached growth on the
CELLS in the aeration chambers.
The stability of attached growth systems is well documented and arises largely because the bio-mass simply cannot be
washed from the treatment system as in suspended growth systems such as activated sludge plants.
Excessive loss of solids and process instability is a classic problem with small activated sludge plants.
Staged bio-oxidation, in the ENVIROCELL, provides operational stability by virtue of the initial aeration chambers acting to
remove the bulk of the remaining (after pre-treatment) carbonaceous BOD5 (up to 80% even with high loads).
Additional aeration chambers then act both as (BOD5) polishing reactors and nitrifying reactors.
PROCESS PERFORMANCE
In employing the ENVIROCELL biological process, the effective removal of dissolved organic material in the wastewater is
particularly influenced by the duration of contact between the incoming waste and the bacteria growing on the fixed,
submerged, CELL walls.
Longer contact times provide greater opportunity for removal of organic material from the liquid. In a trickling filter, a single
pass of less than 2 minutes duration of liquid over media at a normal BOD5 loading rate will generally remove about 80% or
more of the BOD5.
With retention of at least 24 hours in ENVIROCELL’s aeration chambers, abundant opportunity is provided for a high level of
BOD5 conversion and oxidation.
The designed liquid circulation system takes full advantage of the prolonged contact time.
SLUDGE PRODUCTION, SETTLEMENT AND STORAGE
Sludge settles in the initial or pre-treatment chambers and derives from both the incoming wastewater and recycled sludge
produced in the aerobic process.
A critical aspect of design in the aerobic chambers is the provision of air for treatment and water circulation. The quantity of
air normally pumped into the aerobic chambers and the circulation pattern established is not designed to maintain all the
suspended solids in suspension.
The result is that sludge accumulates on the floor of the aerobic chambers. This accumulation is deliberate.
During maintenance, accumulations are removed.
PAGE 4
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
PHONE : (02) 9460 2020
Grey2Green®
Envirocell
AAA RAIN 4UZE®
www.zerotech.com.au
[email protected]
CLARIFICATION/SETTLING CHAMBER
To ensure optimum operating conditions in the clarification / settling chamber, scum and settled sludge are returned to pretreatment chambers continuously. This action enhances the carry-over of clear effluent to the disinfection chamber and
maximizes effective contact with a disinfecting agent.
Furthermore, the returned, aerated sludge/water helps to freshen and denitrify incoming wastewater and to reduce potential
odour problems.
INFLUENT AND EFFLUENT CHARACTERISTICS
As a guide, the following INFLUENT and EFFLUENT characteristics are typical for a domestic type waste stream that will be
experienced at the complex:-
INFLUENT
EFFLUENT
Biochemical Oxygen Demand
200 - 300 mg / L
< 20 mg / L
Suspended Solids
200 - 300 mg / L
< 30 mg / L
3
Faecal Coliforms
10
10 - 10 cfu / 100 ml.
< 30 cfu / 100 ml.
pH
-
6.5-8.5
Dissolved Oxygen
-
> 2 mg / L
Disinfection Cl:
-
0.2-2.0 mg/L residual
PAGE 5
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
Envirocell
www.zerotech.com.au
Grey2Green®
[email protected]
MANAGEMENT, OPERATION AND MAINTENANCE OF SEWAGE TREATMENT SYSTEMS
Comprehensive operation, maintenance and emergency services are overseen by Highland Tanks Pty Ltd and AWMS Pty Ltd,
details of which are listed in an owner’s manual.
Contact details of participating persons / organizations for this project are as follows:AWMS PTY LIMITED
8/191 Blues Point Road
NORTH SYDNEY NSW 2060
ULTRA CLEAR AWTS PTY LTD
P.O.BOX 1158
MITTAGONG NSW 2575
ONSITE MANAGER
15213 HUME HIGHWAY
MARULAN NSW 2579
Phone: (02) 9460 2020
Phone: (02) 4889 8288
Phone: TBA
Owners of onsite sewage management systems are responsible for the correct operation of systems on their premises.
Good site management will be important to ensure that the system as- designed works effectively, both now and in the long
term. An operation and maintenance logbook should be maintained for the project site. This should document the nature and
date of any maintenance to the treatment and disposal system. Some management and maintenance suggestions follow:
HT Pty Ltd, AWMS Pty Ltd or their agents will maintain the system and, when required, provide advice on
maintenance requirements and frequency. A detailed maintenance schedule should be kept.

The disposal system must be checked regularly for serviceability.

Disposal areas must be cropped regularly and cropped materials removed from site. This promotes evapotranspiration, facilitates nutrient removal and avoids ponding of effluent and run-off during rainy periods.

A Maintenance Manual listing Do’s and DON’T ’s and recommended products that should be used must be given to
all stakeholders.

Disinfection requirements must be addressed regularly. At least monthly inspections should be made in case of
need.

The disposal area should carry warning signs to inform persons that treated effluent is being disposed of on site.

Unauthorized persons should not enter disposal areas nor tamper with any part of the system. The recommended
maintenance team will be well versed in all aspects of system maintenance and should be called on to attend to any
matters relating to the installed system.

The onsite management team should regularly check the system and disposal area for odours, signs of seepage/runoff around tanks and disposal areas.
The above measures will enable the effectiveness and performance of the system to be analyzed and, if necessary,
changes made.
PAGE 6
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
Envirocell
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
www.zerotech.com.au
Grey2Green®
[email protected]
ONGOING MAINTENANCE SERVICE POLICY
To ensure that sewage treatment systems perform to the required standard, the NSW Department of Health and Local
Councils stipulate a maintenance program for the first, second and ensuing years of operation. Failure to have the stipulated
service could result in a breach of public health legislation and subsequent legal proceedings.
YEAR ONE (1)
For the first year from the date of installation, an authorized technician will make quarterly inspections of the system to
ensure it is functioning properly. The technician will perform the maintenance listed below.
* Check on blower pressure and noise
* Inspect connections and fittings
* Do water clarity tests
* Replenish chlorine tablets
* Check chlorinator for water flow
* Check on pump flow and noise
* Adjust air controls, if necessary
* Adjust sludge/scum returns, if necessary
* Inspect for Bio-mass growth
* Test for free chlorine.
On completion of the service, a copy of the appropriate report will be given to the client and to the Local Council, as
stipulated by Council.
PLEASE NOTE:



PUMPING OUT of any compartment of the system is NOT INCLUDED….see below.
Service that is NOT WARRANTY related will be charged at going rate for parts and labour.
If Local Councils require additional services to the system, the local technician will offer the additional services at a
nominal fee.
CONTINUING SERVICE POLICY
An offer to renew a maintenance program will be sent to the client after the last service.
The offer will include a schedule of maintenance services at a competitive fee. The local technician will be pleased to answer
any queries that a client may have.
PUMP- OUTS
The gradual accumulation of non-biodegradable materials in the system will necessitate a desludge depending on individual
usage. Abuse of the system by the introduction of chemicals or hydraulic and organic overloading may require frequent
pump-outs. This applies to all types of systems, be they septic, pump-outs or AWTS’. The local service team will advise the
client when this service will be necessary. By regulation, Pump-Outs can only be carried out by Council Approved
contractors. The cost of this service is for the Customer’s account.
The local service team will assist, where possible, with the arrangement of this service.
SPARE PARTS
Spare parts are readily available through the local service team at very competitive prices. Emergency call-outs may incur an
extra charge in some circumstances.
PAGE 7
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
Grey2Green®
Envirocell
www.zerotech.com.au
[email protected]
WARRANTY POLICY
The proper operation of the Envirocell or similar systems depends on the hydraulic and organic loadings the system was
designed for and the life of the micro-organisms inside the system.
Envirocell or its associated Companies and agents are NOT responsible for the in-field operation of a system other than the
engineering, mechanical and structural workings of the system itself. Field abuse and overloading of the system can only be
cured by the user of the system.
All Envirocell systems include appropriate Warranties provided by suppliers of equipment. Equipment is warranted against
defective materials and workmanship under normal use and service for periods specified. The warranty is limited to the repair
or replacement of any item that proves to be defective during the warranty period. Repair charges will apply if the equipment
has been disassembled by unauthorized persons, subjected to external damage, improperly wired or flooded.
WARRANTY ON EQUIPMENT SUPPLIED
Concrete Tanks
15 years
Filter Medium
15 years
Electrical Turret
15 years
Internal Pipework
15 years
Electrical Components
2 years
Aerator Unit
2 years
Delivery Pump
2 years
PAGE 8
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
Grey2Green®
Envirocell
www.zerotech.com.au
[email protected]
RESPONSIBILITIES AND LEGAL REQUIREMENTS
For general information only
In the interest of the owner and the public, certain requirements are imposed by regulating bodies with regard to the
installation of sewage treatment systems; be they Envirocell, Septic or other systems.
The following are provided as a guide only. (Please check with the local regulating body or Envirocell for further information).
1. The owner of the plant is entirely responsible for the operation and maintenance of the system.
2. The existence of the service contract does not transfer the responsibility from the owner to the supplier or its agent.
3. The Envirocell is to be constructed in the approximate position indicated in the plan.
4. The system may not be used until the site has been inspected and Council considers the effluent can be completely
disposed of on the site without nuisance or likely danger to health.
5. No fruit or salad vegetable growing on the property shall be irrigated with effluent from the system.
6. There shall be no irrigated water run-off from the allotment to the adjoining properties, public places or reserves.
7. An operator’s manual, incorporating a service record, is to be provided with the system. The date of each service shall be
entered on the record sheet.
8. The owner shall enter into a service contract with the manufacturer, distributor or their agents or any firm or contractor
considered to be competent by the Local Council for servicing of the systems at monthly/quarterly intervals.
9. The service contractor shall make adjustments to each system, its ventilation and irrigation system, when directed to do
so by the Local Council.
10. The yard or garden areas of the allotment are turfed and / or landscaped to the satisfaction of Council and before the
system is used for irrigation purposes.
Detailed conditions of installation are stated in the approval given by the regulating body. Please read them carefully and ask
for advice should it be necessary.
YOUR CO-OPERATION PLEASE
GENERAL TOPICS
Access
For maintenance purposes, please ensure that trouble free access is available to ALL manholes on the Tank/s and to the
CONTROL BOX. This is a requirement of the regulating bodies. Soil, plants, bark, etc.. MUST be removed prior to a
maintenance service.
Blower Damage – A Very Costly Problem
Avoid this problem by creating channels to take rain water away from the vicinity of the CONTROL BOX. Do not create a water
catchment area around the Control Box as this could cause fusion of the Blower during periods of heavy rain. Insurance
companies will NOT reimburse you for Blower Damage caused by your negligence.
Plumbing Problems



BLOCKAGES IN THE DRAINAGE LINES from the Complex to the system are plumbing problems. If your household
fittings are not draining away, please check the inlet to the system for blockages. Usually the lines can be cleared at this
INLET point by inserting a rod down the inlet pipe. Should this not be possible, please call your local plumber or drainer.
THE LOSS OF A WATER SEAL in fittings, allowing gases to escape, should be initially referred to your local plumber for
corrective measures. AN INCORRECTLY CONSTRUCTED E-Duct Vent could be the cause of this problem.
E-DUCT VENTS should be constructed to ensure the proper dispersal of gaseous by-products prevalent in all forms of
sewage treatment. The vent should be positioned at least 600 mm above the highest point in the house so that prevailing
winds will carry away such gases.
Change of Ownership
To enable us to continue servicing the system, please advise us when you sell your property.
PAGE 9
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
AWMS
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
PTY. LIMITED
ABN 35 001 419 889
Est. 1976
HEAD OFFICE
SUITE 8 / 191 BLUES POINT ROAD, NORTH SYDNEY, NSW, 2060, AUSTRALIA
Grey2Green®
Envirocell
AAA RAIN 4UZE®
PHONE : (02) 9460 2020
www.zerotech.com.au
[email protected]
REPRESENTATIVE LIST OF KEY PROJECTS
AWMS Pty. Limited has designed, supplied, installed, commissioned and maintained numerous sewage treatment systems of
various sizes serving a wide range of developments and industries.
Coupled with a team that has a combined 50 years of hands on experience in all facets of wastewater treatment, AWMS is well
positioned to provide effective solutions to treatment and disposal needs.
The following representative list of key projects is submitted for perusal.
In view of Privacy Laws, the names and addresses of clients have been deliberately omitted.
AWMS is prepared to provide general information only on any of the listed projects.
HYDRAULIC
FLOW
litres/day
ORGANIC
LOAD
kgs/day
41,000
41,000
26,400
26,400
26,200
18,000
18,000
18,000
18,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
5,520
5,520
5,520
3,600
3,600
2,800
2,800
2,800
16.80
16.80
7.70
7.70
11.00
7.35
5.25
5.25
5.25
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
1.61
1.61
1.61
1.05
1.05
0.82
0.82
0.82
LOCATION
BRIEF DESCRIPTION
Hunter Valley
Scone
Jamberoo
Terrey Hills
Maralya
Hunter Valley
Scone
Hoxton Park
Port Douglas, Qld
Scone
Scone
Moss Vale
Mittagong
Leppington
Menangle Park
Wyong
Northern Territory
Terrey Hills
Palm Beach
St. Marys
Mudgee
Rylstone
Campbelltown
Dural
Kenthurst
Restaurant, Tourist Buses, Vineyard & Restaurant staff
Clubhouse
Residence, Visitor Accommodation
Social Club…Predominantly weekends, Functions
Clubhouse, Workshop Staff, Wash-down Area
Winery and Restaurant, Boutique Cellar Door Sales
4 x Dwellings
Primary and High School
Motel Accommodation
3 x Horse Stables
1 x Principal Residence
Private Golf and Country Club
Office and Factory Staff
Weekend Markets
Trotting Track and Weekend markets
Handicapped Children’s Centre
Accommodation Block and Caravan Park
Short term day School for Children
Weekend Residence
Major Waste Recycling Centre for Sydney
Restaurant, Accommodation and Office Block
Office and Factory Units
Child Care Facilities
Child Care Facilities
2 Homes on One Property
PAGE 10
AUSTRALIAN WASTEWATER MANAGEMENT STRATEGIES
ULTRA CLEAR
MODEL CT20
HOLE EXCAVATION
6000mm minimum at base
3000mm
minimum
at base
•
•
•
•
•
Bottom of hole level
Hole depth approx. 2150mm
Lifting eyes at base of tank
Allow 300mm access around tanks to release hooks
NOT TO SCALE
•
•
•
Ground level
Drains
Primary tank
•
•
•
Level bottom
25-50mm sand or aggregate base
Treatment tank
UCHECT20M 09 Rev 2 27/04/07
UltraClear
WASTEWATER TREATMENT SYSTEMS
Model CT20
PLUMBER’S INSTALLATION MANUAL
1. Excavation of hole 6 metres x 3 metres x 2.15 metres deep, including 50mm of sand
base. Lid depth 80mm. Inlet of tank 1650mm from base of tank. Overall tank height
2.2m.
2. Install tanks in hole with level bottom, using metal dust aggregate or sand base.
3. Connect pipe work between tanks with 100mm sewer pipe and 25mm PVC pipe.
4. Connect drainage to primary tank.
5. Ensure E duct vents are constructed.
6. Half fill both tanks with water, 5,000 litres each tank, to prevent lifting of tanks.
7. Backfill tanks.
8. It is the plumber’s or owner’s responsibility to provide all weather access for delivery truck
to the excavated hole. Ensure access is free of power lines and overhanging trees.
9. Location of tank – avoid storm water run off areas.
10. Tanks must be installed on level base using minimum 50mm depth sand or
aggregate, with no rocks protruding over surface area. When backfilling tanks ensure no
large rocks enter the hole. Any damage to tanks, e.g. large rocks or machinery damage,
during backfilling, is the responsibility of the contractor and/or owner.
ULTRA CLEAR AWTS PTY LTD
ACN 090 907 725 ABN 93 090 907 725 PO BOX 1158, MITTAGONG NSW 2575
Phone: 02 4889 8288 or 02 4889 8562 Mobile: 0419 545 319 Fax: 02 4889 8566
Email: [email protected] Website: www.ultraclear.com.au
May 2008
UCPIMCT20M 08 08/05/2008 Revision 1
SPECIFICATIONS
ULTRA CLEAR PTY LTD
ABN 93 090 907 725 ACN 090 907 725
MODEL
CT20
TWO TANK SYSTEM
Suitable to deal with WC's and all wastewater on premises for up to
20 persons, i.e. up to 3,500 litres per day.
SEPTIC TANK
7100 litre capacity (including baffle volume) reinforced concrete tank
baffles 2:1
manufactured by Highland Concrete Tanks AS/NZS 1546.1:1998
COLLECTION WELL
7100 litre capacity reinforced concrete tank 3000 litre aerobic chamber one
1275 litre aerobic chamber two
1275 litre aerobic chamber three
433 litre settling chamber
591 litre combined settling, disinfection & pump chamber
HCT Australian Standards AS/NZS 1546.1:1998
BAFFLES
Steel fibre or mesh reinforced concrete baffles.
Fixed in place with concrete mix and/or two part mega epoxy.
Manufactured by Highland Concrete Tanks.
Primary tank - single baffle 2:1.
Treatment tank * baffle 1 - main baffle to lid.
* insert - 230mm above water level.
- partitions installed to create settling & disinfection pump chambers.
- base tapered to accommodate sludge returns.
LIDS
Primary tank lid constructed of 80mm thick reinforced concrete.
2530mm diameter with 2 x manhole openings and over inlet & outlet.
Treatment tank lid constructed of 80mm thick reinforced concrete.
2530mm diameter with 3 manholes and lids.
AEROBIC CHAMBER 1
First treatment chamber using aerobic bacteria, containing one media
pack and two air diffusers.
AEROBIC CHAMBER 2
Second treatment chamber using aerobic bacteria, containing one
media pack and two air diffusers.
AEROBIC CHAMBER 3
Third treatment chamber using aerobic bacteria, containing one
media pack and two air diffusers.
SETTLING CHAMBER
Solids settle to bottom of chamber to be picked up by venturi operated
sludge return and returned to primary inlet of septic tank.
Scum skimmer to return floatable matter to aerobic chamber one.
CHLORINATOR
Effluent flows through 100mm sewer pipe at a controlled rate, where
the water passes through the chlorine inside the three to five chlorinator
tubes, through flow slots, controlled by end cap for disinfection
strength.
The chlorinator is situated above the water level of the disinfection
chamber. Trichloroisocyanuric acid is the disinfectant agent used, with
20 tablets in each tube, to be regulated by service technician.
Page 1
UCISCT20M 16
Revision 1 27/03/06
DISINFECTION
CHAMBER
Disinfection & pump chamber allows a retention time of greater than
30 minutes where chlorine destroys any final bacteria not previously
removed.
PUMP CHAMBER
Treated effluent is contained until water levels rise and activate
irrigation pump for automatic disposal onto irrigation area.
AIR LINES
15mm Class 9 Pressure Pipe PVC connecting lines between air
diffusers, situated at four points at bottom of tank, controlled by
15mm ball valve taps.
DIFFUSERS
20mm x 150mm nylon micro air diffusers, to diffuse air into
aerobic chambers one and two.
SLUDGE RETURN
25mm PVC SWV pipe situated in sediment chamber.
SCUM RETURN
20mm PVC pipe situated in sediment chamber.
MEDIA
4 packs of BTM200 Code 60022IR Bio Tube .50 cubic metre with
total surface area of 180 square metres, to contain bacteria
growth in both aerobic chambers.
MEDIA FIXINGS
Aluminium brackets and megapoxy.
40mm pipe work for legs to contain media pack in place, to
provide free flow of air diffused water.
BRACKETS
Plastic brackets and non-corrosive steel pins to hold pipe work
in place.
FLOAT SWITCH
15mm pipe fixed in pump chamber to activate pressure switch
when water level is high.
CONCRETE COVER BOX
Situated on top of tank to house blower and electrical control panel.
ELECTRICAL
CONTROL PANEL
Mounted inside concrete box on top of tank by electrician, to provide
electrical outlet for irrigation pump and air blower.
ALARM PANEL
Mounted in house by electrician in visible location. Provides audible
and visible indication of electrical, blower or pump failure. With 24
hour reset muting device.
AIR BLOWER
Hiblow HP-100 air pump producing a nominal 100 litres air per
minute. Located in concrete box on top of tank.
IRRIGATION PUMP
10 to 35 metre head submersible irrigation pump with automatic
pump control. 80 to 120 litre variable water flow cycle dependent
on flow adjustment. Located in pump chamber.
Page 2
UCISCT20M 16
Revision 1 27/03/06
ELECTRICAL INSTALLATION MANUAL
NUMBER 2 - April 2010
UltraClear
WASTE WATER TREATMENT SYSTEMS
MODELS - ST10, ST8 & Commercial Systems
ELECTRICAL CIRCUIT SPECIFICATIONS ULTRA CLEAR AWTS
IMPORTANT: This manual must be given to your electrical contractor
with the control box and the alarm panel.
The Ultra Clear AWTS warranty will be void if these Specifications are
not adhered to.
The power source circuit is to be connected to a dedicated single phase plus earth circuit, protected by a 16
amp MINIMUM circuit breaker of 8Ka or greater type suitable for motor start, such as Weber/Martec As168
type or Clipsal “U” type; and marked as ULTRA CLEAR. Minimum cable size 2.5mm. Connected to and run
from an EXTERNAL building switchboard.
The alarm panel is a low voltage device (12 volt) that decodes a data signal from the main control box at the
treatment tank. A two conductor cable with a minimum cross sectional area of 0.8mm per conductor is
required to inter-connect the two. It is normal practice to use 1mm squared twin TPS if the alarm plate
conductor is in the same conduit as the power feed. The two conductors are not polarity conscious, and may
be connected any way around.
The alarm panel is fitted with a rechargeable backup battery which has been left disconnected from factory
and must be activated before final installation in the wall. Two batteries are supplied in alarm. The battery
link must be put in the on position for the battery backup to work after electrical connection has been
completed.
The alarm panel has three LEDs. Under normal operating conditions, the green power led will light. If
power supply to the treatment system fails, the power led will flash on briefly every 3 seconds, and the alarm
will give a brief beep in sequence with the power led. This beep can be muted for 24 hours.
NOTE: Electrical work must be carried out in accordance with A.S. 3000 and Supply Authority Rules.
A “Notification of electrical work” certificate must be lodged with the Supply Authority for your wiring.
Continuous running current is 0.6 amp with a maximum intermittent current up to 3.1 amps (dependent upon
submersible pump size).
WARNING: Water resistant control box IP55. Power supply to be made on external
points of control box only. The intrusion of control box will void warranty.
HIGHLAND TANKS PTY LTD
ACN 090 907 725 ABN 93 090 907 725
PO BOX 1158, MITTAGONG NSW 2575
Phone 02 4889 8288 or 02 4889 8562 Fax 02 4889 8566
Emaill: [email protected] www.ultraclear.com.au
UCEIM 75
Revision 2
12/01/2012
11/04/2011
Pumpserv - sakuragawa hiblow techn…
QUALITY SERVICE
COMPETITIVE PRICES EFFICIENT DELIVERY
Specialists in Pumps and Airblowers
Email Us
Home Page
Submersible and Other
Pumps
SAKURAGAWA - HIBLOW - TECHNO TAKATSUKI
Air Blowers and Spares - Quiet and reliable air pumps for your fish
breeding tanks, and septic tanks.
We supply a full range of Sakuragawa - Hiblow - Techno Takatsuki air blowers and spares
including:
MEDIUM CAPACITY AIR PUMPS
HP SERIES - Silent Type
HP
HP
HP
HP
- 60
- 80
- 100
- 120
TYPE
Rated Voltage
Power Supply
Frequency
Normal
Pressure
Exhaust
Volume
Power
Consumption
Noise level
Weight
SPECIFICATIONS
V
Hz
TYPE
Rated Voltage
Power Supply
Frequency
Normal
Pressure
Exhaust
Volume
Power
Consumption
Noise level
Weight
TYPE
Rated Voltage
Power Supply
50
50
60
50
60
60
0.15
(0.015)
50
60
0.18
(0.018)
l/min
60
80
W
51
71
dBA(1m)
kg
35
7.0
36
7.0
100
95
120
100 115
38
8.5
125
40
8.5
SPECIFICATIONS
30GJ-L
40GJ-L 50GJ-L 60GJ-L
AC100/120/220~240
80GJ-L
50 60
50
50
V
Hz
kgf/cm2
(MPa)
60
50
60 50
0.13
(0.013)
60
60
0.15
(0.015)
l/min
32 35
43
46
51
57 64
65
81
84
W
26 28
37
40
51
53 55
58
81
85
dBA(1m)
kg
30 32
5.1
31 33
5.2
36 37 36 38
6.0
6.0
37
LARGE CAPACITY AIR PUMPS
SPP-GJ-H SERIES - Silent Type
100GJ-H
120GJ-H
150GJ-H
200GJ-H
HP-100
HP-120
AC100
kgf/cm2
(MPa)
MEDIUM CAPACITY AIR PUMPS
SSP-GJ-L SERIES - Silent Type
20GJ-L
40GJ-L
50GJ-L
60GJ-L
80GJ-L
HP-60
HP-80
AC100
38
6.1
SPECIFICATIONS
V
Hz
Frequency
Normal
kgf/cm2
http://www.pumpserv.com/hiblow.htm
100GJ-H 120GJ-H 150GJ-H 200GJ-H
AC100/120/220~240
50
60
50
60
0.18
50
60
50
60
0.2
1/2
11/04/2011
Pumpserv - sakuragawa hiblow techn…
kgf/cm2
0.18
0.2
(MPa)
(0.018)
(0.02)
l/min
100 110 110 120 150 170 200 210
Normal
Pressure
Exhaust Volume
Power
Consumption
Noise level
Weight
W
101 120 125
dBA(1m)
kg
37 40
8.2
145
39
42
160 180 220
43
8.2
46
260
47
10
50
10
BATTERY POWERED MEDIUM CAPACITY AIR PUMPS
IP SERIES - Inverter Type
SPECIFICATIONS
40
80
120
TYPE
Rated Voltage
Normal
Pressure
DC Current
Power Input
Exhaust
Volume
Weight
DCV
kgf/cm2
(MPa)
A
Arms
DCW
40-12
DC12
40
80
DC24
120
3.6
6.8
43
0.13
(0.013)
2.0
3.2
4.4
7.4
48
77
5.0
8.2
120
l/min
43
51
80
120
kg
7.6
7.6
8.2
8.7
Email Us
PUMPSERV PTY LTD
Unit 6, 3 Marina Close
Mount Kuring-Gai NSW 2080
Australia
http://www.pumpserv.com/hiblow.htm
PO Box 256
Hornsby NSW 1630
Australia
Phone (02) 9457 8622
Fax
(02) 9457 9891
Email [email protected]
www.pumpserv.com
2/2
SCHEMATIC ONLY……………MARULAN APRIL 2013……..NOT TO SCALE
10,000 LITRE COLLECTION WELL(CW10000)
WITH FLOW REGULATING MEANS
Influent from CT20
Manhole
Manhole
Electric Line/s to Power Source, Aqualogic Timer and Monitoring System
Water Level at Off Position
Submersible Vortex Pump
Float Switch On/Off position
Concrete Pump Stand
Controlled outflow
to Absorption Beds
ClayTech - BVP
The BVP is a heavy duty all-purpose vortex pump. This pump is tough! It has been
trialed, and survived, the pumping of rocks and debris from construction pits. It can
handle almost anything up to soft solids 32mm in diameter.
Specifications
Power absorbed
1000 w
Max. head
11 m
Max. flow rate
320 L/min
Outlet size
1½″
Solids capability
38 mm
Pump diameter
240 mm
Pump height
400 mm
Weight
8 kg