Enhanced Feeding Solutions in the Numismatic
Transcription
Enhanced Feeding Solutions in the Numismatic
Enhanced Feeding Solutions in the Numismatic Coin Production Area © Sack & Kiesselbach Maschinenfabrik GmbH Contents • Company • Feeding Solutions on the Table-Medallion-Press (TMP) • The Bi-Metal production on the TMP • Materials & Preparations • Previous Production Cycle • Todays Production Cycle • Conclusion © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 2 Company World-renowned presses – Made in Germany Sack & Kiesselbach has been around since 1891. Our business is oil hydraulic press systems. The company has made a name for itself all over the world with some 1,500 hobbing presses supplied so far. Our core skill is the development of customised, turnkey press systems developed and manufactured in Germany. As well as the coin industry, we supply customers from various industries all over the world. Our strength lies in our flexibility. As a medium-sized company with manageable business structures we respond quickly and easily to our customers' special requirements and work out individual solutions with them. Our customers value our reliability. Sack & Kiesselbach machines are known for their long life cycle. Our competent, committed staff ensure that these investments remain productive and up to date for decades. Just what people expect from „Made in Germany”! © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 3 Feeding Solutions on the Table-Medallion-Press (TMP) Magazine Feeding Tray Loading Magazine © Sack & Kiesselbach Maschinenfabrik GmbH Bi-Metal Feeding WMF 2015 / MS 4 The Bi-Metal production on the TMP © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 5 The Bi-Metal production on the TMP - Materials & Preparations Ring: Nickel-Messing CuZn20Ni5 Core: Magnimat (Cupro-Nickel) CuNi25 • • • purchase of blank material piercing of some rings in-house polishing process in-house © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 6 The Bi-Metal production on the TMP - Previous Production Cycle Pre-joint 1€ coin blank 1€ collector coin core hardness: 114 HV30 Ring & Core Possible handicaps with pre-joined blanks: core hardness: 86 HV30 • • • • pre-joint hardness water splits between ring & core after polishing possible punch markings during joining process further process to get in touch with dirt © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 7 The Bi-Metal production on the TMP - Todays Production Cycle Advantages: Ring & Core no pre-joining process needed • elimination of possible punch markings during joining process • higher machine availability, >> elimination of a pre-joining operation on a coining press • seperate polishing process of ring / core, which is easier with two different materials • higher punch life-time • less coining forces 1€ collector coin joint & coined at once on the TMP-350 (at Berlin Mint) core hardness: 86 HV30 • © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 8 The Bi-Metal production on the TMP - Todays Production Cycle Back End - Loading Station Front End - Unloading Station © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 9 The Magazine Solutions with a Bi-Metal Transfer on the TMP Magazine Load for standard coins - on the Bi-Metal Transfer Unit Bi-Metal Magazine Ring / Core Benefits on glance: • • • highest flexibility shortest down-time (appr. 15min part-part) less change parts © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 10 Conclusion A pre joining process in the production of Bi-Metal collector coins has no advantages ! Production results for the customer are more cost-effective in joining & coining the product in one production cycle. (simillar as in the circulation money production) Lower cost value, as the pre-joining operation is not necessary. The end-product result is much easier to control and to influence. Tool cost is reduced. The production flexibility with a Bi-Metal feeding system is unique on a TMP . © Sack & Kiesselbach Maschinenfabrik GmbH WMF 2015 / MS 11 Tradition Innovation Success Meet us on Booth: C-10 B-21