AKG Thermal Systems, Inc.
Transcription
AKG Thermal Systems, Inc.
AKG THERMAL SYSTEMS AKG TCP1 & TCP2 TEMPERATURE PROBES In reviewing the installations of the TCP1 and TCP2 Temperature Probes, AKG has discovered a possible issue when there are inadequate ground connections, corroded connections, or poor power supply connections in the installation wiring. These poor connections can cause the voltage across the probe to fall below our volts, causing extreme thermal stresses in the TCP electronics which may cause the TCP to fail. • As a preventative measure AKG will be supplying a Power Module with all TCP1 and TCP2 temperature probes to eliminate this potential problem. • The Power Module will shut down the power to the TCP probe and fan when the voltage across the probe falls below 6.5 volts. The Power Module will automatically reset the TCP probe when full voltage is returned. • This Power Module is also available as a retrofit kit for units in the field. • The Power Module is an IP67, fully sealed control which is mounted between the TCP and the fan motor. • The Power Module will work with either 12V or 24V DC installations. • An installation drawing below and/or attached shows the proper placement. • It is also the customer’s responsibility to properly fuse the fan power at the power source with a fuse size per the fan amps listed in the D, DC, or DCS cooler brochure. Updated tpc probe with power module AKG Thermal Systems, Inc. P.O. Box 189; Mebane, NC 27302-0189; Phone: +1 919-563-48-71; Fax: +1 919-563-49-17 E-Mail: [email protected]; Internet: www.akgts.com AKG THERMAL SYSTEMS field retrofit of tcp1 and tcp2 The power module is installed between the fan and the TCP temperature probe to cut power to the fan and TCP probe should the voltage across the fan and probe fall below 6.5 volts. 1. Locate and mount the Power Module in a secure location, making sure the 24” leads will reach the TCP probe (the TCP2 will require two Modules), when mounting to the shroud be sure to use ¼ or 3/8” screws that will not touch the cooler core. 2. Cut the Red/Black/Blue wire coming from the TCP probe in preparation to splice in the Module, Strip ~ 1/3-inch of the insulation, mark end going to the TCP unit and the end going to the fan/ground/power. 3. Splice the Red/Black/Blue wires from the Power Module tagged TO TEMP SWITCH to the Red/Black/Blue wires from the TCP probe. A splice kit is provided with Power Module. 4. Splice the Red/Black/Blue wires from the Power Module tagged MOTOR/GROUND. The Module Black Wire to the system ground wire, Module Blue Wire to the fan motor ground and the Module Red Wire to the incoming power wire. steps 5-7 are for the tcp2 only 5. On the Coolers with Two fans a second module is required. This module does not have a red power wire to the TCP2 probe 6. Splice the Black/Blue wires from the Power Module tagged TO TEMP SWITCH to the Black striped/Blue Striped wires from the TCP probe. 7. Splice the Red/Black/Blue wires from the Power Module tagged MOTOR/GROUND. The Module Black Wire to the system ground wire, Module Blue Wire to the fan motor ground and the Module Red Wire to the incoming power wire with the 2 amp fuse provided. Power Module Part # TCP1 requires one 3703.789.0103 Power Module TCP2 requires one 3703.789.0103 and one 3703.789.0105 Power Module fuse provided. AKG Thermal Systems, Inc. P.O. Box 189; Mebane, NC 27302-0189; Phone: +1 919-563-48-71; Fax: +1 919-563-49-17 E-Mail: [email protected]; Internet: www.akgts.com AKG THERMAL SYSTEMS Wiring diagrams TCP1 Single fan tcp2 dual fan fan Amps fuse Size wire Size ** DC/DCS10-12 5.2 7.5 16 5.2 7.5 16 DC/DCS16-12 8.2 10 14 8.2 10 14 DC/DCS20-12 19 25 10 19 25 10 DCS30-12 19 25 10 19 25 10 DCS45-12 2 x 18 2 x 25 2 x 10 2 x 18 2 x 25 2 x 10 DCS60-12 2 x 19 2 x 25 2 x 10 2 x 19 2 x 25 2 x 10 D10-12 5 20 12 5 20 12 D16-12 17 35 10 17 35 10 D20-12 17 35 10 17 35 10 D30-12 29 50 8 29 50 8 D36-12 29 50 8 29 50 8 D45-12 2 x 17 2 x 35 2 x 10 2 x 17 2 x 35 2 x 10 D60-12 2 x 29 2 x 50 2 x 8 2 x 29 2 x 50 2x8 D70-12 2 x 29 2 x 50 2 x 8 2 x 29 2 x 50 2x8 ** Wire size for runs up to 20 ft, for longer wire runs, larger wire size may be required. Wire to be sized to maintain at least 12 volts at the fan. AKG Thermal Systems, Inc. P.O. Box 189; Mebane, NC 27302-0189; Phone: +1 919-563-48-71; Fax: +1 919-563-49-17 E-Mail: [email protected]; Internet: www.akgts.com AKG Technical bulletin 0614 REV A Recommended fuse and wire Size Model fan Amps