Al Azizia Panda United, Distribution Facility
Transcription
Al Azizia Panda United, Distribution Facility
PROJECT SPOTLIGHT Al Azizia Panda United - Distribution Facility Ridayh, Kingdom of Saudi Arabia Design and Construction of a 71,900m² Steel Fibre Reinforced Concrete (SFRC) Ground Floor Slab Twintec Industrial Flooring of Rugby, UK part of the Twintec International Group of Companies based in Luxembourg, has recently designed and installed a steel fibre Working partners with: reinforced concrete (SFRC) ground floor slab for Al Azizia Panda United at their new regional distribution facility in Riyadh, Kingdom of Saudi Arabia. WSP Middle East Ltd were Project Managers with Davis Langdon Project QS. The facility will be fully automated, with the design of the handling systems managed by ILS of South Africa. The slab is ground bearing with individual leg loads from pallet racking of 100kN and a UDL of 50kN/m². The flatness tolerance specified for the whole of the floor area was FM2 Special to the 2003 edition of Concrete Society (UK) TR34 and as a result Twintec has created one of the flattest floors ever constructed in the Kingdom of Saudi Arabia. Design - Twintec's solution for this project was a jointless, steel fibre reinforced concrete (SFRC) slab, 190mm thick and reinforced with 40kg/m³ of AFT 1/60 steel fibres. The floor utilised a C35 concrete with a 0.5 water cement ratio and a flexural strength of 4.6N/mm². Our SFRC proprietary design software allows the plastic moment redistribution effect to be taken into account whilst still using an elastic method of design. This is a well established design methodology, supported by TR34 and with PROJECT DATA Application Type: Ground supported floor slab Consultant Engineer: WSP Middle East Ltd. Concrete Supplier: Al Falwa & Twintec Fibre Type/s: AFT 1/60 Fibre Dosage: 40 kg/m3 Total Area: 71,384 m2 Slab Depth: 190 mm Completion Date: May 2007 a track record of several million square metres. Twintec design methods have been developed in conjunction with steel producers and independent consulting engineers for over 20 years. The total volume of jointless ground bearing floors laid throughout Europe using our design methods since 1982 now exceeds 60,000,000 m². (Continued overleaf) Ref: PS/102 Concrete - The size of the panels meant that a concrete volume of 400m³ was required on a daily basis. This, together with the need for guaranteed delivery rate and consistent quality of product was a major issue that required a carefully planned solution. 11No concrete mixer trucks were used to supply the site with capacities of 6 and 9m³. The concrete suppliers Al Falwa & Twintec kept good control over the quality, consistency and workability of the concrete and also the rate of production. Key to this quality was the technical assistance of BASF who were fully engaged with Twintec, Al Falwa & WSP in carrying out trial mixes until the optimum mix was selected. Design Co-ordination - This was perhaps the key to success on this contract; with the Twintec design team fully able to understand the specific needs of the structure and the fast track nature of the client’s business.The floor slab was constructed to programme and within budget. Twintec carry out all aspects of the work from budget proposals through to detailed design along with full supply and installation.Twintec's team is entirely "in house" and includes structural engineers with over 20 years experience of designing concrete floor slabs reinforced traditionally and with Steel Fibre Reinforced Concrete (SFRC). Skilled Workers - Twintec have a superb market reputation and their directly employed work force are renowned for producing floors to the highest standards of flatness in large area jointless pours, without the need for remedial grinding. Whilst they have developed a few special tools and some unique techniques, it is essentially a question of the attitude and commitment of the workforce. To this end, the project is planned well, managed effectively, resourced correctly and the men are properly trained and supervised. Site Co-operation - Vital to the success of any floor slab project is the total commitment of all project team members and a shared goal of achieving quality and client satisfaction. Twintec were pleased to be part of this project team , where all concerned realised the vital importance of the floor slab to the long-term success of this distribution facility. Result - Using 13,000m3 of concrete, 550 tonnes of steel fibres, 250 tonnes of "Mastertop 300" dry shake topping and 7,000 litres of "Masterkure 181"curing agent / sealer, Twintec produced the floor slab in just 38 casting days over 3 visits. Twintec Head Office Twintec Northern Office Woodfield House Berkley Business Park Doncaster Road Scunthorpe DN15 7DQ Twintec Scottish Office Unit 1, Prospect Park Valley Drive Rugby Warwickshire CV21 1TF Tel: + 44 (0)1788 567722 Fax: + 44 (0)1788 567700 Tel: + 44 (0)1788 567722 Fax: + 44 (0)1724 277697 Tel: + 44 (0)1324 715616 Fax: + 44 (0)1324 715639 [email protected] www.twintec.co.uk Haypark Business Centre Marchmont Avenue Polmont Falkirk FK2 0NZ