ED026 An Update to the Housing Land Supply in the LDP
Transcription
ED026 An Update to the Housing Land Supply in the LDP
CONWY LOCAL DEVELOPMENT PLAN EXAMINATION MAC112 DOCUMENT: AN UPDATE TO THE HOUSING LAND SUPPLY IN THE LDP DOCUMENT DATED: 18TH APRIL 2013 1. Introduction 1.1. This statement provides a brief update to the housing land supply for consideration in the Conwy LDP. It is based on the commentary provided in the 2012 JHLAS Report, with additional detail provided where relevant. 1.2. MAC112 to which this document relates is for an amendment to Policy HOU/1 and to the LDP housing supply due to new planning permissions being granted since the April 2012 base date of the 2012 JHLAS. Glyn Farm and Dolwen Road, previously included in the LDP contingency sites are of primary interest, although other permissions are also relevant. The housing supply resulting from these changes is provided in Appendices 3 - 6. Other changes to potential land supply in the form of planning applications awaiting determination or likely to be submitted soon are also considered. 2. Sites with Planning Permission 2.1 The following sites have planning permission and their development will provide additional sources of supply in future JHLA Studies. 2.2 Glyn Farm, Colwyn Bay (39 units) Glyn farm, which had been identified as a contingency site for 130 dwellings in the emerging LDP was recently granted permission on appeal for 39 dwellings; directly impacting on the status of the site in the LDP. The site that has been granted permission is smaller than that which was listed as a contingency site (Appendix 1) and is at a very low density of 12 dwellings per hectare, explaining the difference in the number of units. The part of the contingency site that was not included in the application is large enough for approximately 27 dwellings (based on density of 30 dph). 2.3 Interleisure Site, Towyn (approx. 140 units) After a long hiatus, work has recommenced at the Interleisure site, Pensarn. The site has previously been excluded from the five-year supply, on the basis that it was a former allocation that was unlikely to be developed. Recently however progress has been made. Following clarification with DC officers the site appears to have extant permission (1/AGT/4958) dating from 1981 for 192 chalets with no occupancy conditions. With development having re-started, this site should be included as part of the five year supply in the future. 2.4 Following discussions with the Agent, it has become evident that although the permission is for 192 chalets, this number of units will not be completed. This is for two reasons; as part of the development of the Gwynt y Mor off shore wind farm, a 40m easement crossing the site protects new electricity cables; reducing the developable area (Appendix 2). Secondly, it is the owners’ intention to seek an amendment to the planning permission, to provide a development more suited to permanent residential use than the chalets for which the existing use was granted. This would lower the density and further reduce the number of dwellings on the site to approximately 140 units. 2.5 Former Slater’s Garage, Abergele (approx. 28 units) A recent application from North Wales Housing Association for approximately 28 AHLN units has been approved. This will contribute a brownfield site to the land supply, providing a combination of houses and apartments in an area that has recently seen few permissions granted. 2.6 Land adjoining Fernbank, Llanfairfechan (24 units) Outline planning permission has previously been granted for development of this site. A recent application was approved to extend the period for submission of reserved matters. This permission demonstrates continued interest in the site and returns it to the five year supply. 2.7 Deganwy Castle Hotel (26 units) The renovation and part change of use of the Deganwy Castle Hotel was granted permission in 2012, with construction now well underway. 2.8 Albini House, Llandudno Junction (48 units) This application for the third and final phase of development was approved for 48 dwellings. The two previous phases were for 58 and 36 units respectively, bringing the total number of dwellings to 142, in comparison with the 126 units that are included in the 2012 JHLAS, based on the figure included in the original outline application. This application therefore results in an increase of the number of dwellings on the site by 16 units. 3. Sites likely to have applications determined prior to LDP adoption 3.1 Applications for development on the following sites are either awaiting a decision or are likely to be submitted in the near future. Between them, the sites have capacity for approximately 361 units, although a number of these are already accounted for in the LDP. 3.2 Ty Mawr, Old Colwyn (approx. 255 units) This site was originally allocated for housing in the Colwyn Borough Local Plan has not been included in the five-year supply for some time. Some initial work, including a development brief, was undertaken in the past although a planning application was not submitted at the time. This work has now re-commenced in earnest, with a planning application likely to be submitted in spring 2013. The site is already included as an allocation in the Conwy LDP, so granting of permission would not increase the housing land supply in LDP terms although it will provide certainty to allow the site to be included in subsequent JHLA Studies. 3.3 Dolwen Road, Colwyn Bay (71 units; loss of 40 units contingency) Similar to Glyn Farm, Dolwen Road has been included in the LDP as a contingency site, but an early planning application was turned down at committee. The applicant appealed the decision but after giving further consideration to the Glyn Farm decision, Committee has now resolved not to contest the appeal. It is now for the applicant to decide whether to proceed with the appeal or to submit a new planning application, however the principle for development has now been accepted by both officers and members on the basis of the lack of a five year housing land supply. 3.4 Plas Dulas, Llanddulas (15 units) This site has been approved for development, with commencement anticipated soon following final determination, subject to signing of S106 relating to open space. 4. Awaiting call-in request decision 4.1 One further site is awaiting a final decision, following Planning Committee resolution against officer recommendation: 4.2 Land off Gwellyn Avenue, Kinmel Bay (102 units) This site was included as an allocation in the earlier stages of the LDP preparation but removed owing to the flood risk in this area, comments received from EAW and the lack of certainty over flood defence improvements required to ensure this site can be delivered. In accordance with this stance, officers recommended refusal when a planning application was submitted however it was approved at committee. EAW have requested a call-in from WG owing to their previous concerns relating to development in this area. At the application’s second appearance at Planning Committee, it was resolved to defer a decision on this site, awaiting WG’s response to the call-in request which has not yet been forthcoming. 5. Changes to LDP housing supply 5.1 Glyn Farm is the only site so far for which granting of permission has directly affected an LDP site. As such, this must be taken into account and the Council proposes to remove the existing contingency site for 130 dwellings and replace it with an allocation for 39 in line with the permission granted. The remaining part of the site should then be retained for contingency. Appendix 3, Scenario 1 provides the resulting housing supply. 5.2 Four other large sites have also received planning permission since April 2012 (Slaters, Fernbank, Deganwy Castle and Albini House), which the Council believe should be added to the housing supply in the LDP. In total, these sites will contribute a further 94 units that were not included in the 2012 JHLAS, used as the basis for updating the housing land supply in MAC091. The LDP housing land supply resulting from this change is shown in Scenario 2 (Appendix 3). 5.3 One further site, Dolwen Road has not yet been granted permission but for the reasons given in 3.3 above it is proposed to change this site from a contingency site to an allocation, consistent with the change made to the Glyn Farm appeal site. This results in a loss of 40 units from contingency and a gain of 71 units as an allocation, as shown in Scenario 3 (Appendix 3). 5.4 The changes that would result from the inclusion of the Interleisure site for 140 units, as described in 2.3 above, are shown in Appendix 6. This is provided for information only; to demonstrate how this site would affect the land supply and distribution of development. It would be inappropriate to add all of the remaining sites listed above to the land supply, as there is still a degree of uncertainty over several of them, however an update on further changes to sites will be provided when appropriate. 5.5 If new permissions are to be taken into account, then for consistency consideration should also be given to sites included in the five year supply of the 2012 JHLAS whose permissions may lapse. None of the permissions for these sites have so far expired since April 2012, although some may expire prior to LDP adoption unless work has commenced on the site. Further information can be provided later as work on the 2013 JHLAS progresses, although the final report will not be completed before adoption. 7. Impact on Contingency 7.1 Changes to the status of sites due to applications at Glyn Farm (permission granted) and Dolwen Road (anticipated) affect not only the land supply in the LDP but the level of contingency available, to provide flexibility, in accordance with Soundness Test CE4. Both of these sites were included in the submission as contingency sites for a total of 170 dwellings. 7.2 Glyn Farm was granted permission for 39 units. Even after removing 130 units from the contingency level of 665 and adding 39 to the supply (based on the table included in the Initial Schedule of Matters Arising Changes) the total resulting housing supply of 6995 meets the requirement for 6350 dwellings plus 10% contingency; with some of this flexibility coming from oversupply, not specific contingency sites. This is the ‘worst case scenario’. In practice, part of the Glyn Farm site also remains (Appendix 1), which it is proposed to be retained as contingency (Appendix 3, Scenario 1). 7.3 Other sites, as listed in 2.5 – 2.8 have been granted permission since April 2012, providing additional sources of supply (Appendix 4) and giving a substantial buffer over the housing level required. Should the site at Dolwen Road be granted permission, as we anticipate following Committee’s recent resolution, the loss of a contingency site would be replaced with a relatively large supply of 71 dwellings (Scenario 3, Appendix 3). Thus, the 170 contingency units referenced above would be replaced with two sites with permission for 110 dwellings, a contingency site to accommodate approx. 27 units (at 30 dph) plus three additional sites for a total of 78 units. 7.3 Scenario 3 would therefore result in a housing total of 7147, with flexibility for 797 or more than 12.5% over the 6350. 6. Summary The Council proposes Matters Arising Changes to update the housing supply by: • Amending policy HOU/1 to include 39 dwellings at Glyn Farm as an allocation and 27 dwellings on the remaining part of the site as contingency. • Amending policy HOU/1 to include 71 dwellings at Dolwen Road as an allocation and removing 40 units from the contingency supply. • Including the four sites listed in 2.5 – 2.8 as part of the permitted supply, providing an additional 94 units. The table in Scenario 3 demonstrates how this will affect the housing land supply in the LDP (Table HOU1a). The remaining information is provided to the Inspectors to help inform their decision relating to the Land Supply in Conwy. Updates on any further changes to sites will be provided when appropriate. Appendix 1 – Glyn Farm, Colwyn Bay Map showing the differing areas of the Appeal site (red dashed outline) and contingency site (orange hatched site). The SE corner of the contingency site provides approx. 0.9 ha of developable land (bounded to the north by woodland including some TPOs) that was not included in the appeal site. Appendix 2 - Interleisure Site, Pensarn Map showing the site with extant permission for 192 chalets for unrestricted occupation (red dashed outline) crossed by the Gwynt y Mor easement (hatched blue. Following a further application on the site, Areas A and C could provide approx. 140 units at 30 dph. Appendix 3 – LDP Housing Land Supply Table Changes Scenario 1 (Glyn Farm) This table shows the LDP supply in Scenario 1 – based on the table included in the previous MAC report and adding 39 units at Glyn Farm as an allocation. The 130 units originally included as contingency on this site are removed, being replaced with 27 units on the remaining area of the site. R U R A L U R B A N LDP Housing Supply Scenario 1 Abergele, Towyn & Kinmel Bay Conwy, Llandudno Junction & Llandudno Colwyn Bay, Rhos on Sea & Mochdre Llanfairfechan & Penmaenmawr Llanrwst Urban Total Tier 1 Main Villages Tier 2 Main Villages Minor Villages Hamlets Open Countryside Rural Total TOTALS Completions Permissions 143 485 506 132 33 1299 28 46 16 6 23 119 1418 77 382 174 29 0 662 70 0 0 0 0 70 732 Empty Homes 95 800 115.8 426 305 135.1 352 574 173.6 80 52 44.4 58 200 21.2 1011 1931 490.1 43 235 7.7 103 170 11.6 33 0 5.8 31 0 3.9 35 0 0.0 245 405 28.9 1256 2336 519 School Modernisation TOTAL Contingency OVERALL HOUSING TOTAL Windfall Allocations TOTALS 1230.8 1733.1 1779.6 337.4 312.2 5393.1 383.7 330.6 54.8 40.9 58.0 867.9 6261 199 6460 562 7022 % 19.7 27.7 28.4 5.4 5.0 86.1 6.1 5.3 0.9 0.7 0.9 13.9 100 Scenario 2 (Other pemissions granted) This table shows the LDP supply in Scenario 2. This includes Scenario 1 but with the addition of a further 94 units on the four sites listed in 2.5 – 2.8. These are included in the Permissions column. R U R A L U R B A N LDP Housing Supply Scenario 2 Abergele, Towyn & Kinmel Bay Conwy, Llandudno Junction & Llandudno Colwyn Bay, Rhos on Sea & Mochdre Llanfairfechan & Penmaenmawr Llanrwst Urban Total Tier 1 Main Villages Tier 2 Main Villages Minor Villages Hamlets Open Countryside Rural Total TOTALS Completions Permissions 143 485 506 132 33 1299 28 46 16 6 23 119 1418 105 424 174 53 0 756 70 0 0 0 0 70 826 Empty Homes 95 800 115.8 426 305 135.1 352 574 173.6 80 52 44.4 58 200 21.2 1011 1931 490.1 43 235 7.7 103 170 11.6 33 0 5.8 31 0 3.9 35 0 0.0 245 405 28.9 1256 2336 519 School Modernisation TOTAL Contingency OVERALL HOUSING TOTAL Windfall Allocations TOTALS 1258.8 1775.1 1779.6 361.4 312.2 5487.1 383.7 330.6 54.8 40.9 58.0 867.9 6355 199 6554 562 7116 % 19.8 27.9 28.0 5.7 4.9 86.3 6.0 5.2 0.9 0.6 0.9 13.7 100.0 Supply Table – Scenario 3 (Dolwen Road) This table shows the LDP supply in Scenario 3. This includes Scenario 2 but also adds in the changes that would occur when including Dolwen Road. Granting of permission for this site is looking increasingly likely with Committee having recently resolved not to contest the appeal. This calculation takes into account the loss of 40 dwellings as contingency and gain of 71 as allocated supply. The changes included here result from the changes to HOU/1 as proposed by MAC112. R U R A L U R B A N LDP Housing Supply Scenario 3 Abergele, Towyn & Kinmel Bay Conwy, Llandudno Junction & Llandudno Colwyn Bay, Rhos on Sea & Mochdre Llanfairfechan & Penmaenmawr Llanrwst Urban Total Tier 1 Main Villages Tier 2 Main Villages Minor Villages Hamlets Open Countryside Rural Total TOTALS Completions Permissions 143 485 506 132 33 1299 28 46 16 6 23 119 1418 105 424 174 53 0 756 70 0 0 0 0 70 826 Empty Homes 95 800 115.8 426 305 135.1 352 645 173.6 80 52 44.4 58 200 21.2 1011 2002 490.1 43 235 7.7 103 170 11.6 33 0 5.8 31 0 3.9 35 0 0.0 245 405 28.9 1256 2407 519 School Modernisation TOTAL Contingency OVERALL HOUSING TOTAL Windfall Allocations TOTALS 1258.8 1775.1 1850.6 361.4 312.2 5558.1 383.7 330.6 54.8 40.9 58.0 867.9 6426 199 6625 522 7147 % 19.6 27.6 28.8 5.6 4.9 86.5 6.0 5.1 0.9 0.6 0.9 13.5 100.0 Supply Table – Scenario 4 (Interleisure) This table shows the LDP supply in Scenario 4. This includes Scenario 3 but with the further addition of 140 dwellings on the Interleisure site, demonstrating the effect this would have on the distribution of housing supply, should the site be developed as indicated in paragraphs 2.3-2.4 above. R U R A L U R B A N LDP Housing Supply Scenario 4 Abergele, Towyn & Kinmel Bay Conwy, Llandudno Junction & Llandudno Colwyn Bay, Rhos on Sea & Mochdre Llanfairfechan & Penmaenmawr Llanrwst Urban Total Tier 1 Main Villages Tier 2 Main Villages Minor Villages Hamlets Open Countryside Rural Total TOTALS Completions Permissions 143 485 506 132 33 1299 28 46 16 6 23 119 1418 245 424 174 53 0 896 70 0 0 0 0 70 966 Empty Homes 95 800 115.8 426 305 135.1 352 645 173.6 80 52 44.4 58 200 21.2 1011 2002 490.1 43 235 7.7 103 170 11.6 33 0 5.8 31 0 3.9 35 0 0.0 245 405 28.9 1256 2407 519 School Modernisation TOTAL Contingency OVERALL HOUSING TOTAL Windfall Allocations TOTALS 1398.8 1775.1 1850.6 361.4 312.2 5698.1 383.7 330.6 54.8 40.9 58.0 867.9 6566 199 6765 522 7287 % 21.3 27.0 28.2 5.5 4.8 86.8 5.8 5.0 0.8 0.6 0.9 13.2 100.0