Page 1 Page 2 SPECIAL N OTICE Pursuant to Section 55
Transcription
Page 1 Page 2 SPECIAL N OTICE Pursuant to Section 55
Assets $ 6,742.91 704.79 2,719.96 160,889.16 1,000.00 101,195.32 27,334.66 66,772.59 67,107.51 Confidential: $ (10.00) $ (10.00) $ (434,456.90) For Internal Use Only $ (2,719.88) (1,000.00) (427,588.46) 4,345.64 7,416.26 (14,910.46) $ (10.00) Liabilities and Equity $ 434,466.90 $ 434,466.90 FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Balance Sheet January 31, 2012 CURRENT ASSETS 569-1010.0000 CASH-OPERATING/TOWNE 569-1020.0000 PETTY CASH 569-1102.0000 CASH-OP RESERVE/TOWNE 569-1103.0000 CASH-REP RESERVE/TOWNE 569-1104.0000 CASH-GENERAL MAINT RESERVE 569-1105.0000 CASH-CD/RR/BNKCMLTH/198809 569-1110.0000 CASH-MM/RR/FULTON/33006152 569-1115.0000 CASH-CD/RR/HERITAGE/799540 569-1116.0000 CASH-CD/RR/HERITAGE/799541 TOTAL CURRENT ASSETS LONG TERM ASSETS TOTAL ASSETS CURRENT LIABILITIES 569-2302.0000 EMP MISC DEDUCTIONS TOTAL CURRENT LIABILITIES 9:56 am ACCUM OPERATING RESERVE ACCUM GENERAL MAINT RESERV ACCUM REPLACEMENT RESERVE REPL RESERVES Y-T-D EXPS RETAINED EARNINGS CURRENT EARNINGS LONG TERM LIABILITIES TOTAL LIABILITIES CAPITAL & EQUITY 569-3200.0000 569-3202.0000 569-3300.0000 569-3400.0000 569-3498.0000 TOTAL EQUITY February 10, 2012 9:56 am TOTAL LIABILITIES & EQUITY February 10, 2012 For Internal Use Only FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Balance Sheet January 31, 2012 $ (434,466.90) Confidential: FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Budget Comparison Statement For the Period Ended January 31, 2012 462,000.00 500.00 0 4,500.00 150.00 467,150.00 Annual Budget 23,399.60 $ (41.67) .58 (318.50) (12.50) 23,027.51 $ 3,600.00 275.00 2,500.00 50,000.00 14,225.00 13,650.00 250.00 22,150.00 100.00 2,500.00 200.00 800.00 1,500.00 275.00 225.00 3,300.00 115,550.00 YTD Variance $ 300.00 16.02 113.33 (828.68) 1,185.42 (276.49) 20.83 18.47 8.33 58.53 (3.28) 56.99 125.00 22.92 18.75 (162.65) 673.49 $ YTD Actual 61,899.60 0 .58 56.50 0 61,956.68 $ YTD Budget $ 0 6.90 95.00 4,995.35 0 1,413.99 0 1,827.36 0 149.80 19.95 9.68 0 0 0 437.65 8,955.68 Current Variance 38,500.00 41.67 0 375.00 12.50 38,929.17 $ Monthly Actual $ 300.00 22.92 208.33 4,166.67 1,185.42 1,137.50 20.83 1,845.83 8.33 208.33 16.67 66.67 125.00 22.92 18.75 275.00 9,629.17 Monthly Budget 23,399.60 (41.67) .58 (318.50) (12.50) 23,027.51 $ 38,400.00 44,400.00 11,000.00 93,800.00 Title $ 300.00 16.02 113.33 (828.68) 1,185.42 (276.49) 20.83 18.47 8.33 58.53 (3.28) 56.99 125.00 22.92 18.75 (162.65) 673.49 3,088.00 1,328.02 (658.11) 3,757.91 $ $ 61,899.60 0 .58 56.50 0 61,956.68 $ $ $ $ 0 6.90 95.00 4,995.35 0 1,413.99 0 1,827.36 0 149.80 19.95 9.68 0 0 0 437.65 8,955.68 112.00 2,371.98 1,574.78 4,058.76 $ 38,500.00 41.67 0 375.00 12.50 38,929.17 $ $ $ $ 300.00 22.92 208.33 4,166.67 1,185.42 1,137.50 20.83 1,845.83 8.33 208.33 16.67 66.67 125.00 22.92 18.75 275.00 9,629.17 3,200.00 3,700.00 916.67 7,816.67 $ INCOME-ASSOCIATION FEES ELEVATOR MOVE IN/MOVE OUT INTEREST-DELINQUENT FEES INTEREST INCOME LATE FEES INCOME TOTAL INCOME $ $ $ AUDITING EXPENSES BANK SERVICE CHARGE LEGAL EXPENSES EMPLOYEE SALARY/TAXES/BENEF PROPERTY INSURANCE-FLOOD PROPERTY INSURANCE CORPORATE FEES MANAGEMENT FEE MISC EXP/GENERAL & ADMIN OFFICE EXP/PRINTING COUPON BOOKS POSTAGE PROFESSIONAL FEES TAXES-STATE TAXES-CORPORATE TELEPHONE TOTAL GEN. & ADM. EXPENSE 3,088.00 1,328.02 (658.11) 3,757.91 2,000.00 6,000.00 10,000.00 1,000.00 7,000.00 14,750.00 $ (521.33) 4.16 (2,116.67) (218.87) 583.33 .01 112.00 2,371.98 1,574.78 4,058.76 688.00 495.84 2,950.00 302.20 0 1,229.16 $ 166.67 500.00 833.33 83.33 583.33 1,229.17 For Internal Use Only (521.33) 4.16 (2,116.67) (218.87) 583.33 .01 3,200.00 3,700.00 916.67 7,816.67 Confidential: 688.00 495.84 2,950.00 302.20 0 1,229.16 $ 166.67 500.00 833.33 83.33 583.33 1,229.17 UTILITIES-WATER UTILITIES-ELECTRIC UTILITIES-GAS TOTAL UTILITIES 9:56 am MAINT.-ENTRY SYSTEM MAINT.-WASTE DISPOSAL MAINT.-JANITORIAL SERVICE MAINT.-GATE MAINTENANCE MAINT.-FIRE SPRINKLER SYSTE MAINT.-LAWN CONTRACT February 10, 2012 125.00 0 0 0 200.00 0 0 2,405.32 9,807.92 0 0 120.00 18,323.44 $ $ 0 (1,000.00) (1,000.00) $ 375.00 (875.00) (500.00) $ 125.00 $ 83.33 225.00 20.83 (116.67) 83.33 141.67 (1,321.99) (8,224.59) 75.00 125.00 5.00 (11,048.46) $ YTD Variance 467,150.00 11,000.00 0 11,000.00 4,500.00 155,000.00 159,500.00 3,000.00 1,000.00 2,700.00 250.00 1,000.00 1,000.00 1,700.00 13,000.00 19,000.00 900.00 1,500.00 1,500.00 87,300.00 Annual Budget FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Budget Comparison Statement For the Period Ended January 31, 2012 $ 0 13,791.67 13,791.67 $ (8,117.06) $ YTD Actual 250.00 83.33 225.00 20.83 83.33 83.33 141.67 1,083.33 1,583.33 75.00 125.00 125.00 7,274.98 $ 916.67 1,000.00 1,916.67 $ 0 YTD Budget $ 375.00 12,916.67 13,291.67 $ 47,046.22 $ Current Variance 125.00 83.33 225.00 20.83 (116.67) 83.33 141.67 (1,321.99) (8,224.59) 75.00 125.00 5.00 (11,048.46) $ 916.67 0 916.67 $ 14,910.45 Monthly Actual $ 375.00 (875.00) (500.00) $ 38,929.16 $ Monthly Budget 125.00 0 0 0 200.00 0 0 2,405.32 9,807.92 0 0 120.00 18,323.44 $ 0 (1,000.00) (1,000.00) $ 14,910.46 Title $ 0 13,791.67 13,791.67 $ (8,117.06) $ $ 250.00 83.33 225.00 20.83 83.33 83.33 141.67 1,083.33 1,583.33 75.00 125.00 125.00 7,274.98 $ 916.67 1,000.00 1,916.67 $ .01 $ $ 375.00 12,916.67 13,291.67 $ 47,046.22 $ $ MAINT.-LANDSCAPING EXTRAS/T MAINT.-IRRIGATION MAINT.-ELECTRICAL REPAIRS MAINT.-SIGNS MAINT.-HEAT & A/C CONTRACT MAINT.-REPAIR/OPERATING SUP MAINT.-FIRE ALARM MONITOR MAINT.-ELEVATOR CONTRACT MAINT.-GEN MAINT & REPAIRS MAINT.-GENERATOR CONTRACT/F MAINT.-BOOSTER PUMP REPAIR MAINT.-GROUNDS/SNOW REMVL TOTAL MAINTENANCE $ 916.67 0 916.67 $ 14,910.45 $ RESERVES-EARNED INTEREST REPLACEMENT RESERVE TOTAL REPLACEMENT RESERVE $ 38,929.16 $ $ GENERAL OPERATING RESERVE GENERAL MAINT RESERVE TOTAL CAPITAL/OPER RESVRS $ 14,910.46 $ TOTAL EXPENSES/RESERVES $ For Internal Use Only .01 Confidential: $ 9:56 am NET INCOME February 10, 2012 $ 424,178.74 FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Balance Sheet December 31, 2011 Assets $ 7,873.95 704.79 1,803.21 151,386.71 101,195.32 27,334.66 66,772.59 67,107.51 $ 424,178.74 $ (15,995.00) Liabilities and Equity $ (25.00) (15,970.00) $ (15,995.00) $ (408,183.74) $ (424,178.74) For Internal Use Only $ (1,803.21) (551,586.14) 137,789.35 (3,225.83) 10,642.09 Confidential: CURRENT ASSETS 569-1010.0000 CASH-OPERATING/TOWNE 569-1020.0000 PETTY CASH 569-1102.0000 CASH-OP RESERVE/TOWNE 569-1103.0000 CASH-REP RESERVE/TOWNE 569-1105.0000 CASH-CD/RR/BNKCMLTH/198809 569-1110.0000 CASH-MM/RR/FULTON/33006152 569-1115.0000 CASH-CD/RR/HERITAGE/799540 569-1116.0000 CASH-CD/RR/HERITAGE/799541 TOTAL CURRENT ASSETS LONG TERM ASSETS TOTAL ASSETS CURRENT LIABILITIES 569-2302.0000 EMP MISC DEDUCTIONS 569-2311.0000 DEFERRED REVENUE TOTAL CURRENT LIABILITIES LONG TERM LIABILITIES TOTAL LIABILITIES CAPITAL & EQUITY 569-3200.0000 ACCUM OPERATING RESERVE 569-3300.0000 ACCUM REPLACEMENT RESERVE 569-3400.0000 REPL RESERVES Y-T-D EXPS 569-3498.0000 RETAINED EARNINGS CURRENT EARNINGS TOTAL EQUITY TOTAL LIABILITIES & EQUITY January 14, 2012 4:26 pm January 14, 2012 4:26 pm For Internal Use Only FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Balance Sheet December 31, 2011 Confidential: Monthly Budget Current Variance YTD Budget FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Budget Comparison Statement For the Period Ended December 31, 2011 Monthly Actual YTD Actual 426,481.96 (1,487.13) 50.00 1,695.00 7.40 4,366.34 200.00 431,313.57 Title $ $ 432,000.00 0 0 0 0 2,000.00 100.00 434,100.00 $ $ 4,585.00 79.20 2,762.00 44,157.14 13,924.00 17,813.18 204.08 21,818.88 895.21 2,520.00 590.60 803.48 13,703.00 0 160.00 (501.00) 3,195.80 126,710.57 $ (15,543.40) 0 0 0 6.90 190.22 16.66 (15,329.62) $ $ $ 5,800.00 275.00 2,500.00 38,500.00 14,000.00 22,600.00 250.00 20,600.00 0 2,000.00 250.00 1,000.00 4,600.00 250.00 400.00 500.00 3,550.00 117,075.00 $ 20,456.60 0 0 0 6.90 356.88 25.00 20,845.38 $ $ $ 483.34 17.25 163.34 (3,169.02) 1,166.66 469.35 20.84 (110.70) (795.21) (113.76) (5.86) 61.78 383.34 20.84 33.34 41.66 33.59 (1,299.22) YTD Variance 414.12 440.02 1,410.68 2,264.82 Annual Budget 432,000.00 0 0 0 0 2,000.00 100.00 434,100.00 36,000.00 0 0 0 0 166.66 8.34 36,175.00 $ $ (5,518.04) $ (1,487.13) 50.00 1,695.00 7.40 2,366.34 100.00 (2,786.43) $ $ 0 5.66 45.00 6,377.36 0 1,413.99 0 1,827.36 795.21 280.42 26.70 21.56 0 0 0 0 262.25 11,055.51 41,585.88 30,159.98 6,989.32 78,735.18 $ INCOME-ASSOCIATION FEES INCOME-ADV ASSOC FEES RESALE PACKAGE INCOME OTHER MISC INCOME INTEREST-DELINQUENT FEES INTEREST INCOME LATE FEES INCOME TOTAL INCOME $ $ 5,800.00 275.00 2,500.00 38,500.00 14,000.00 22,600.00 250.00 20,600.00 0 2,000.00 250.00 1,000.00 4,600.00 250.00 400.00 500.00 3,550.00 117,075.00 483.34 22.91 208.34 3,208.34 1,166.66 1,883.34 20.84 1,716.66 0 166.66 20.84 83.34 383.34 20.84 33.34 41.66 295.84 9,756.29 42,000.00 30,600.00 8,400.00 81,000.00 1,215.00 195.80 (262.00) (5,657.14) 76.00 4,786.82 45.92 (1,218.88) (895.21) (520.00) (340.60) 196.52 (9,103.00) 250.00 240.00 1,001.00 354.20 (9,635.57) $ $ $ $ AUDITING EXPENSES BANK SERVICE CHARGE LEGAL EXPENSES EMPLOYEE SALARY/TAXES/BENEF PROPERTY INSURANCE-FLOOD PROPERTY INSURANCE CORPORATE FEES MANAGEMENT FEE MISC EXP/GENERAL & ADMIN OFFICE EXP/PRINTING COUPON BOOKS POSTAGE PROFESSIONAL FEES RESALE PACKAGE RMB TAXES-STATE TAXES-CORPORATE TELEPHONE TOTAL GEN. & ADM. EXPENSE 229.15 942.12 700.00 1,871.27 42,000.00 30,600.00 8,400.00 81,000.00 $ (1,467.65) 1,102.96 (736.29) 3,600.00 7,800.00 18,800.00 $ 3,270.85 1,607.88 0 4,878.73 5,067.65 6,697.04 19,536.29 $ 3,600.00 7,800.00 18,800.00 For Internal Use Only 300.00 154.16 (1,983.34) 3,500.00 2,550.00 700.00 6,750.00 Confidential: 0 495.84 3,550.00 $ 300.00 650.00 1,566.66 UTILITIES-WATER UTILITIES-ELECTRIC UTILITIES-GAS TOTAL UTILITIES 4:26 pm MAINT.-ENTRY SYSTEM MAINT.-WASTE DISPOSAL MAINT.-JANITORIAL SERVICE January 14, 2012 (2,366.34) 23,755.00 21,388.66 $ (899.91) $ 1,856.64 (6,285.57) (2,242.56) (3,820.80) 1,200.00 1,276.07 648.35 (2,803.56) (16,541.71) (5,429.70) (34,143.73) $ YTD Variance 0 8,365.00 8,365.00 2,000.00 135,000.00 137,000.00 2,400.00 16,600.00 500.00 500.00 300.00 1,200.00 2,400.00 1,200.00 9,300.00 24,860.00 1,200.00 90,660.00 Annual Budget FINANCIAL STATEMENTS - PIERPOINTE CONDOMINIUM Budget Comparison Statement For the Period Ended December 31, 2011 $ $ YTD Actual 3,299.91 14,743.36 6,785.57 2,742.56 4,120.80 0 1,123.93 551.65 12,103.56 41,401.71 6,629.70 124,803.73 $ 12,270.12 .04 12,270.16 YTD Budget $ 4,366.34 111,245.00 115,611.34 $ 434,100.00 Current Variance 2,400.00 16,600.00 500.00 500.00 300.00 1,200.00 2,400.00 1,200.00 9,300.00 24,860.00 1,200.00 90,660.00 $ (12,270.12) 8,364.96 (3,905.16) (7,855.66) $ Monthly Actual $ 2,000.00 135,000.00 137,000.00 $ $ Monthly Budget 200.00 154.18 (2,613.34) (758.34) (88.50) 100.00 (213.00) 100.00 775.00 (5,399.24) 100.00 (9,172.42) $ 0 8,365.00 8,365.00 441,955.66 Title $ (549.10) 11,250.00 10,700.90 $ $ $ 0 1,229.16 2,655.00 800.00 113.50 0 413.00 0 0 7,470.90 0 16,727.40 $ 0 .01 .01 434,100.00 0 $ $ 715.76 0 715.76 $ $ (10,642.09) $ $ 200.00 1,383.34 41.66 41.66 25.00 100.00 200.00 100.00 775.00 2,071.66 100.00 7,554.98 $ 0 697.08 697.08 2,100.54 $ $ $ 166.66 11,250.00 11,416.66 $ $ (10,642.09) $ MAINT.-GATE MAINTENANCE MAINT.-LAWN CONTRACT MAINT.-LANDSCAPING EXTRAS/T MAINT.-IRRIGATION MAINT.-ELECTRICAL REPAIRS MAINT.-EXTM/PEST CONTROL MAINT.-HEAT & A/C CONTRACT MAINT.-REPAIR/OPERATING SUP MAINT.-ELEVATOR CONTRACT MAINT.-GEN MAINT & REPAIRS MAINT.-GROUNDS/SNOW REMVL TOTAL MAINTENANCE $ 0 697.09 697.09 34,074.48 $ $ RESERVES-EARNED INTEREST REPLACEMENT RESERVE TOTAL REPLACEMENT RESERVE $ $ 0 OPERATING RESERVE DRAW GENERAL OPERATING RESERVE TOTAL CAPITAL/OPER RESVRS 36,175.02 $ $ (13,229.08) TOTAL EXPENSES/RESERVES $ For Internal Use Only (13,229.10) (.02) Confidential: $ $ 4:26 pm NET INCOME January 14, 2012 REPLACEMENT RESERVE REPORT FY 2011 PIERPOINTE AT FREEMASON HARBOUR REPLACEMENT RESERVE REPORT FY 2011 PIERPOINTE AT FREEMASON HARBOUR Community Management by: United Property Associates Mr. Justin Winslow 525 South Independence Boulevard Suite 200 Virginia Beach, VA 23452 757-334-4224 Consultant: 929 West Street, Suite 310 Annapolis, MD 21401 Tel: 410.268.0479 Fax: 410.268.8483 www.mdareserves.com INTENTIONALLY LEFT BLANK Section A Replacement Reserve Analysis REPLACEMENT RESERVE REPORT PIERPOINTE AT FREEMASON HARBOUR NORFOLK, VIRGINIA Executive Summary - A1 Reserve Status & Funding Plan - A1 General Information - A2 Cash Flow Method - A4 Component Method - A6 Current Association Funding - A8 Reserve Analysis Comments - A9 Section B Replacement Reserve Inventory Replacement Reserve Inventory General information - B1 Replacement Reserve Inventory Comments - B2 Schedule of Projected Replacements and Exclusions - B3 Section C Projected Annual Replacements Scope. Pierpointe at Freemason Harbour is a condominium association located in Norfolk, Virginia. Pierpointe was constructed from 2000 to 2002. The community consists of three mid-rise building with a total of 72 units (note: the actual number of units is less due to several owners having purchased adjacent units and combining them into a single residence). The survey examined the common elements of the property, including: • • • • • • Asphalt drive and parking. Concrete sidewalks and curb and gutter. Bulkhead, sheet pile walls, and pilings. Site utilities (storm water, domestic water, and sanitary sewer). Building plumbing, mechanical, and electrical systems. Building exteriors and common interior areas. Level of Service. This study has been performed as a Level I, Full Service Reserve Study as defined under the National Reserve Study Standards that have been adopted by the Community Associations Institute. As such, a complete component inventory was established based on information regarding commonly-owned components provided by the community manager and upon quantities derived from field measurement and/or quantity takeoffs from to-scale engineering drawings. The condition of all commonly-owned components was ascertained from a site visit and the visual inspection of each component by the Analyst. The life expectancy and the value of the components are provided based in part on these observations. The fund status and funding plan have been derived from analysis of this data. Projected Annual Replacements General Information - C1 Reserve Analysis and Inventory Policies, Procedures, and Administration - C2 Calendar of Projected Annual Replacements - C2 Section D Condition Assessment Section E Attachments Accounting Summary Appendix Purpose. The purpose of this Replacement Reserve Study is to provide Pierpointe at Freemason Harbour (hereinafter called the Association) with an inventory of the common community facilities and infrastructure components that require periodic replacement. The Study includes a general view of the condition of these items and an effective financial plan to fund projected periodic replacements. • Inventory of Items Owned by the Association. Section B Replacement Reserve Inventory lists the Projected Replacements of the commonly owned items that require periodic replacement using funding from Replacement Reserves. The Replacement Reserve Inventory also provides information about excluded items, which are items whose replacements are not scheduled for funding from Replacement Reserves. • Condition of Items Owned by the Association. Section B Replacement Reserve Inventory includes our estimates of the normal economic life and the remaining economic life for the projected replacements. Section C Calendar of Projected Annual Replacements provides a year-by-year listing of the projected replacements. Section D Condition Assessment provides additional detail for items that are unique or deserving of attention because of their condition or the manner in which they have been treated in this Study. • Financial Plan. The Association has a fiduciary responsibility to protect the appearance, value, and safety of the property and it is therefore essential the Association have a financial plan that provides funding for the projected replacements. In conformance with American Institute of Certified Public Accountant guidelines, Section A Replacement Reserve Analysis evaluates the current funding of Replacement Reserves as reported by the Association and recommends annual funding of Replacement Reserves by two generally accepted accounting methods; the Cash Flow Method and the Component Method. Section A Replacement Reserve Analysis includes graphic and tabular presentations of these methods and current Association funding. An Executive Summary of these calculations is provided on Page A1. Basis. The data contained in this Replacement Reserve Study is based upon the following: • The Request for Proposal submitted and executed by the Association. • Our visual evaluation and measurements on December 8, 2010. Miller - Dodson Associates has visually inspected the common elements of the property in order to ascertain the remaining useful life and the replacement costs of these components. Engineering Drawings. Partial site plans for Pierpointe at Freemason Harbour Building 1 by C. Allan Bamforth Engineers and dated November 2000 was used as the basis for establishing the quantities of asphalt pavement, concrete sidewalk, concrete curb and gutter, and storm water drainage facilities. Partial plumbing, mechanical and electrical drawings prepared by Hickman Ambrose Engineers dated November 2000 for Building 1 were used for partial quantities for both Buildings 1 and 2 as they are similar in size and construction. No drawings for Building 3 were provided. We recommend the Association assemble a library of site and building plans of the entire community. Reproducible drawings should be stored and kept in a secure fireproof location. The Association will find these drawings to be a valuable resource in planning and executing future projects. The original design architect for the property is CMSS Architects of Virginia Beach. Unfortunately CMSS has been acquired recently by another firm and attempting to obtain drawings from them may be difficult. The other alternative is try contacting the original developer for the property, Collins Enterprises of Norfolk, VA. Current Funding. This reserve study has been prepared for Fiscal Year 2011 covering the period from January 1, 2011 to December 31, 2011. The Replacement Reserves on deposit as of October 31, 2010 are reported to be $424,328. The planned contribution for the fiscal year 2011 is $135,000. This results in a Reserve Fund balance at the start of the fiscal year as follows: Oct. 31, 2010 balance Two months contribution Planned expenditures FY 2011 opening balance $424,328 $19,990 $0 $444,318 The balance and contribution figures have been supplied by the property management agent and confirmation or audit of these figures is beyond the scope of the study. For the purposes of this study, it is assumed that the annual contribution will be deposited at the end of each month. Acknowledgement. Miller - Dodson Associates would like to acknowledge the assistance and input of Mr. Justin Winslow, the property manager, who provided very helpful insight into the current operations at the property. Analyst’s Credentials. Mr. Philip Pointon holds a Bachelors Degree in Architecture from Virginia Polytechnic Institute and State University and a Masters Degree from Old Dominion University in Engineering Management as well as coursework at U.S. Army Management Staff College. Mr. Pointon has been a Registered Professional Architect in the State of Virginia and Hawaii since 1990, and has served in many facilities in an architectural function since 1987. He is currently a Reserve Specialist (RS) for Miller - Dodson Associates, Inc. Respectfully submitted, MILLER - DODSON ASSOCIATES, INC. Philip Pointon, AIA, RS, LEED AP Reserve Analyst Intentionally Left Blank Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A1 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 EXECUTIVE SUMMARY The Pierpointe at Freemason Harbour Replacement Reserve Inventory identifies 202 Projected Replacements for funding from Replacement Reserves, with an estimated one-time replacement cost of $3,687,387. The Replacement Reserve Analysis calculates recommended funding of Replacement Reserves by the two generally accepted methods, the Cash Flow Method and the Component Method. The Analysis also evaluates current funding of Replacement Reserves, as reported by the Association. The calculations and evaluation are summarized below: z $154,771 CASH FLOW METHOD MINIMUM ANNUAL FUNDING OF REPLACEMENT RESERVES IN THE STUDY YEAR, 2011. $179.13 Per unit (average), minimum monthly funding of Replacement Reserves The Cash Flow Method (CFM) calculates Minimum Annual Funding of Replacement Reserves that will fund Projected Replacements identified in the Replacement Reserve Inventory from a common pool of Replacement Reserves and prevent Replacement Reserves from dropping below a Minimum Recommended Balance. CFM - Minimum Annual Funding remains the same between peaks in cumulative expenditures called Peak Years. The first Peak Year occurs in 2043 which is outside of the 30-year Study Period. The Cash Flow Method - Minimum Annual Funding of Replacement Reserves remains constant at $154,771 throughout the entire 30-year Study Period. z $267,558 COMPONENT METHOD RECOMMENDED ANNUAL FUNDING OF REPLACEMENT RESERVES IN THE STUDY YEAR, 2011. $309.67 Per unit (average), recommended monthly funding of Replacement Reserves The Component Method is a time tested and very conservative funding model developed by HUD in the early 1980's. The Component Method treats each projected replacement in the Replacement Reserve Inventory as a separate account. Deposits are made to each individual account, where funds are held for exclusive use by that item. Based on this funding model, the Association has a Current Funding Objective of $1,218,645. The Association reports having $444,318 on deposit, which is 36.5% funded. z $135,000 CURRENT ANNUAL FUNDING OF REPLACEMENT RESERVES (as reported by the Association). $156.25 Per unit (average), reported current monthly funding of Replacement Reserves The evaluation of Current Funding, as reported by the Association, has calculated that if the Association continues to fund Replacement Reserves at the current level, there will be adequate funds for Projected Replacements throughout the entire 30-year Study Period. Pages A2 and A3 explain the Study Year, Study Period, Adjustments (interest & inflation), Beginning Balance, and Projected Replacements. Pages A4 to A9 explain in more detail the calculations associated with the Cash Flow Method, Component Method, and Current Funding. REPLACEMENT RESERVE STATUS AND FUNDING PLAN Current funding of Replacement Reserves is adequate to fund Projected Replacements. We recommend the Association adopt a Replacement Reserve Funding Plan based on the Cash Flow Method or the Component Method, to ensure that adequate funding is available throughout the 30-Year Study Period for the $3,858,846 of Projected Replacements listed in the Pierpointe at Freemason Harbour Replacement Reserve Inventory. The Funding Plan should be professionally evaluated every three to five years or after completion of each major replacement project. The Board of Directors has a fiduciary responsibility to review the Funding Plan annually and should consider annual increases in Replacement Reserve funding at least equal to the Consumer Price Index. The starting balance for January 2011 is calculated from data provided by the Manager and reflects the balance as of Oct. 31, 2010 plus two months of budgeted deposits less anticipated expenses from the reserves for November and December 2010. Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A2 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 REPLACEMENT RESERVE ANALYSIS - GENERAL INFORMATION The Pierpointe at Freemason Harbour Replacement Reserve Analysis calculations of recommended funding of Replacement Reserves by the Cash Flow Method and the Component Method, and the evaluation of the Current Funding, are based upon the same General Information; including the Study Year, Study Period, Adjustments (for interest, inflation, and/or a constant increase in annual funding), Beginning Balance, and Projected Replacements: STUDY YEAR The Association reports that their accounting year begins on January 1, and the Study Year, the first year evaluated by the Replacement Reserve Analysis, begins on January 1, 2011. STUDY PERIOD The Replacement Reserve Analysis evaluates the funding of Replacement Reserves over a 30-year Study Period that begins on January 1, 2011. ADJUSTMENTS The calculations in this Replacement Reserve Analysis do not account for interest earned on Replacement Reserves, the effects of inflation on the costs of Projected Replacements, or a constant annual increase in Annual Funding of Replacement Reserves. If requested, we will provide a Replacement Reserve Analysis with adjustments for inflation, interest, and/or a constant annual increase in funding, using values provided by the Association. BEGINNING BALANCE The Association reports Replacement Reserves on Deposit totaling $444,318 at the start of the Study Year. Graph #1. Annual Expenditures for Projected Replacements This bar graph summarizes annual expenditures for the $3,858,846 of Projected Replacements identified in the Replacement Reserve Inventory over the 30-year Study Period. The red line shows the average annual expenditure of $128,628. $424,854 2032 $453,573 $421,114 2031 $436,873 $500,000 $280,911 $292,287 $400,000 2040 2039 $7,860 2038 2037 $25,030 $78,855 $50,084 $17,454 2036 2035 2034 2033 $0 2030 $5,654 2029 2028 2027 $1,200 $39,960 $30,970 2026 $2,000 $18,164 2025 2024 2022 2023 2021 $0 2019 2018 2017 2016 2015 2014 2013 2011 $0 2012 $208,182 $236,792 $94,825 $25,030 $6,790 $31,295 $64,611 $100,000 2020 30 YR AVERAGE $103,845 $128,628 $114,847 $200,000 $209,415 $176,372 $300,000 Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A3 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 PROJECTED REPLACEMENTS The Pierpointe at Freemason Harbour Replacement Reserve Inventory (Section B) identifies 202 Projected Replacements with a one-time Replacement Cost of $3,687,387 and replacements totaling $3,858,846 over the 30-year Study Period. Projected Replacements are the replacement of commonly-owned items that: require periodic replacement and whose replacement is to be funded from Replacement Reserves. The Replacement Reserve Inventory also identifies 54 Excluded Items. Expenditures for the replacement of these items are NOT scheduled for funding from Replacement Reserves. The accuracy of the calculations made in the Replacement Reserve Analysis is dependent on expenditures NOT being made for Excluded Items. The rationale behind these exclusions is discussed in detail on Page B1. Expenditures from Replacements Reserves should be made only after consultation with an accounting professional. The Section B - Replacement Reserve Inventory, contains Tables that list each Projected Replacement (and any Excluded Items) broken down into 19 major categories (Pages B3 to B20). Tables are also included that list each Projected Replacement by year for each of the 30 years of the Study Period beginning on Page C1. The accuracy of this Replacement Reserve Analysis is dependent upon expenditures from Replacement Reserves being made only for the Projected Replacements specifically listed in the Replacement Reserve Inventory. Graph #2. Comparison of Cumulative Replacement Reserve Funding and Expenditures The line graph shows Replacement Reserves - Cumulative Receipts over the 30-year Study Period by the Cash Flow Method (red circles), Component Method (purple diamonds), and the Current Funding Plan as reported by the Association (blue triangles). The bar graph shows the Cumulative Expenditures necessary to fund the Project Replacements listed in the Replacement Reserve Inventory (Section B) and summarized in Graph #1. $7,000,000 Cash Flow Method - Cumulative Receipts Projected Replacements - Cumulative Expenditures Component Method - Cumulative Receipts Current Funding - Cumulative Receipts $6,000,000 $6,000,769 $5,087,442 $5,000,000 $4,494,318 $4,000,000 $3,858,846 $3,000,000 $2,000,000 $1,000,000 2040 2039 2038 2037 2036 2035 2034 2033 2031 2032 2030 2029 2028 2027 2026 2025 2024 2022 2023 2021 2020 2019 2018 2017 2016 2015 2014 2012 2013 2011 $0 Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A4 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CASH FLOW METHOD z CASH FLOW METHOD MINIMUM ANNUAL FUNDING OF REPLACEMENT RESERVES IN THE STUDY YEAR, 2011. $154,771 $179.13 Per unit (average), minimum monthly funding of Replacement Reserves General. The Cash Flow Method is founded on the concept that the Replacement Reserve Account is solvent if cumulative receipts always exceed cumulative expenses. The Cash Flow Method calculates a MINIMUM annual deposit to Replacement Reserves that will: z Fund all Projected Replacements listed in the Replacement Reserve Inventory (see Section B) z Prevent Replacement Reserves from dropping below the Minimum Recommended Balance (see Page A-5) z Allow a constant annual funding level between peaks in cumulative expenditures Graph #3. Cash Flow Method - Cumulative Receipts and Expenditures Graph $6,000,000 Cash Flow Method - Cumulative Receipts Cash Flow Method - Year End Balance Cumulative Expenditures $5,087,442 $5,000,000 $4,000,000 $3,858,846 $3,000,000 $2,000,000 $1,228,596 $1,000,000 2040 2038 2039 2037 2036 2035 2034 2033 2031 2032 2030 2029 2028 2027 2026 2025 2024 2023 2021 2022 2020 2018 2019 2017 2016 2015 2014 2013 2011 2012 $0 Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A5 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CASH FLOW METHOD (cont'd) z Replacement Reserves - Minimum Recommended Balance. The Minimum Recommended Balance is $184,369, which is 5.0 percent of the one-time replacement cost of the Projected Replacements listed in the Replacement Reserve Inventory. Unless otherwise noted in the Comments on Page A-9, the Minimum Recommended Balance has been established by the Analyst based upon an evaluation of the types of items included in the Replacement Reserve Inventory. z Peak Years. The Cash Flow Method calculates a constant annual funding of Replacement Reserves between peaks in cumulative expenditures called Peak Years. In Peak Years, Replacement Reserves on Deposit decline to the Replacement Reserves - Minimum Recommended Balance discussed in the paragraph above. First Peak Year. The first Peak Year occurs in 2043, which is outside of the 30-year Study Period. The Cash Flow Method - Minimum Annual Funding of Replacement Reserves of $154,771 remains the same throughout the entire 30-year Study Period. This funding level is adequate to fund the $3,858,846 of Projected Expenditures listed in the Replacement Reserve Inventory. z Study Period. The Cash Flow Method calculates the recommended contributions to Replacement Reserves over the 30-year Study Period. These calculations are based upon a 40-year projection of expenditures for Projected Replacements to avoid the Replacement Reserve balance dropping to the Minimum Recommended Balance in the final year of the Study Period. z Failure to Fund. The Cash Flow Method calculates a MINIMUM annual funding of Replacement Reserves. Failure to fund Replacement Reserves at the minimum level calculated by the Cash Flow Method will result in Replacement Reserves not being available for the Projected Replacements listed in the Replacement Reserve Inventory and/or Replacement Reserves dropping below the Minimum Recommended Balance. z Adjustment to the Cash Flow Method for interest and inflation. The calculations in this Replacement Reserve Analysis do not account for interest earned on Replacement Reserves, the effects of inflation of the cost of Projected Replacements, or a constant annual increase in Annual Funding of Replacement Reserves. z Comparison of Cash Flow Funding and Average Annual Expenditure. The Average Annual Expenditure for Projected Replacements listed in the Reserve Inventory over the 30-year Study Period is $128,628 (see Graph #1). The Cash Flow Method - Minimum Annual Funding of Replacement Reserves in the Study Year is $154,771. This is 120.3 percent of the Average Annual Expenditure, indicating that the Association is building Replacement Reserves in advance of the first Peak Year in 2043. Table #1. Cash Flow Method Data - Years 1 through 30 Year Beginning balance Minimum annual funding 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 $444,318 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 Expenditures Year end balance Minimum recommended balance Cumulative expenditures Cumulative receipts $31,295 $567,794 $184,369 $31,295 $599,089 $103,845 $618,720 $184,369 $135,140 $753,860 $64,611 $708,880 $184,369 $199,751 $908,630 $6,790 $856,861 $184,369 $206,541 $1,063,401 $25,030 $986,601 $184,369 $231,571 $1,218,172 $114,847 $1,026,525 $184,369 $346,418 $1,372,943 $176,372 $1,004,924 $184,369 $522,790 $1,527,714 $209,415 $950,279 $184,369 $732,205 $1,682,484 $94,825 $1,010,225 $184,369 $827,030 $1,837,255 $1,164,996 $184,369 $827,030 $1,992,026 Year Minimum annual funding 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 Expenditures Year end balance Minimum recommended balance Cumulative expenditures Cumulative receipts $236,792 $1,082,974 $184,369 $1,063,822 $2,146,797 $280,911 $956,835 $184,369 $1,344,733 $2,301,568 $208,182 $903,424 $184,369 $1,552,915 $2,456,339 $2,000 $1,056,195 $184,369 $1,554,915 $2,611,109 $18,164 $1,192,802 $184,369 $1,573,078 $2,765,880 $30,970 $1,316,603 $184,369 $1,604,048 $2,920,651 $436,873 $1,034,500 $184,369 $2,040,921 $3,075,422 $39,960 $1,149,311 $184,369 $2,080,881 $3,230,193 $5,654 $1,298,428 $184,369 $2,086,535 $3,384,963 $1,453,199 $184,369 $2,086,535 $3,539,734 Year Minimum annual funding 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 $154,771 Expenditures Year end balance Minimum recommended balance Cumulative expenditures Cumulative receipts $421,114 $1,186,856 $184,369 $2,507,649 $3,694,505 $424,854 $916,772 $184,369 $2,932,503 $3,849,276 $453,573 $617,971 $184,369 $3,386,076 $4,004,047 $1,200 $771,541 $184,369 $3,387,276 $4,158,817 $17,454 $908,858 $184,369 $3,404,730 $4,313,588 $50,084 $1,013,545 $184,369 $3,454,814 $4,468,359 $78,855 $1,089,461 $184,369 $3,533,669 $4,623,130 $7,860 $1,236,372 $184,369 $3,541,529 $4,777,901 $25,030 $1,366,112 $184,369 $3,566,559 $4,932,672 $292,287 $1,228,596 $184,369 $3,858,846 $5,087,442 Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A6 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 COMPONENT METHOD z COMPONENT METHOD RECOMMENDED ANNUAL FUNDING OF REPLACEMENT RESERVES IN THE STUDY YEAR, 2011. $267,558 $309.67 Per unit (average), recommended monthly funding of Replacement Reserves General. The Component Method is a time tested and very conservative mathematical model developed by HUD in the early 1980s. Each of the 202 Projected Replacements listed in the Replacement Reserve Inventory is treated as a separate account. The Beginning Balance is allocated to each of these individual accounts, as is all subsequent funding of Replacement Reserves. These funds are "locked" in these individual accounts and are not available to fund other Projected Replacements. The calculation of the Recommended Annual Funding of Replacement Reserves is a multi-step process outlined in more detail on Page A7. Graph #4. Component Method - Cumulative Receipts and Expenditures Graph $7,000,000 Component Method - Cumulative Receipts Component Method - Year End Balance Projected Replacements - Cumulative Expenditures $6,000,000 $6,000,769 $5,000,000 $4,000,000 $3,858,846 $3,000,000 $2,141,923 $2,000,000 $1,000,000 2040 2038 2039 2037 2036 2035 2034 2033 2031 2032 2030 2028 2029 2027 2026 2025 2024 2023 2021 2022 2020 2018 2019 2017 2016 2015 2014 2013 2011 2012 $0 Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A7 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 COMPONENT METHOD (cont'd) z Current Funding Objective. A Current Funding Objective is calculated for each of the Projected Replacements listed in the Replacement Reserve Inventory. Replacement Cost is divided by the Normal Economic Life to determine the nominal annual contribution. The Remaining Economic Life is then subtracted from the Normal Economic Life to calculate the number of years that the nominal annual contribution should have been made. The two values are then multiplied to determine the Current Funding Objective. This is repeated for each of the 202 Projected Replacements. The total, $1,218,645, is the Current Funding Objective. For an example, consider a very simple Replacement Reserve Inventory with one Projected Replacement, a fence with a $1,000 Replacement Cost, a Normal Economic Life of 10 years, and a Remaining Economic Life of 2 years. A contribution to Replacement Reserves of $100 ($1,000 + 10 years) should have been made in each of the previous 8 years (10 years - 2 years). The result is a Current Funding Objective of $800 (8 years x $100 per year). z Funding Percentage. The Funding Percentage is calculated by dividing the Beginning Balance ($444,318) by the Current Funding Objective ($1,218,645). At Pierpointe at Freemason Harbour the Funding Percentage is 36.5 z Allocation of the Beginning Balance. The Beginning Balance is divided among the 202 Projected Replacements in the Replacement Reserve Inventory. The Current Funding Objective for each Projected Replacement is multiplied by the Funding Percentage and these funds are then "locked" into the account of each item. If we relate this calculation back to our fence example, it means that the Association has not accumulated $800 in Reserves (the Funding Objective), but rather at 36.5 percent funded, there is $292 in the account for the fence. z Annual Funding. The Recommended Annual Funding of Replacement Reserves is then calculated for each Projected Replacement. The funds allocated to the account of the Projected Replacement are subtracted from the Replacement Cost. The result is then divided by the number of years until replacement, and the result is the annual funding for each of the Projected Replacements. The sum of these is $267,558, the Component Method Recommended Annual Funding of Replacement Reserves in the Study Year (2011). In our fence example, the $292 in the account is subtracted from the $1,000 Total Replacement Cost and divided by the 2 years that remain before replacement, resulting in an annual deposit of $354. Next year, the deposit remains $354, but in the third year, the fence is replaced and the annual funding adjusts to $100. z Adjustment to the Component Method for interest and inflation. The calculations in the Replacement Reserve Analysis do not account for interest earned on Replacement Reserves, the effects of inflation of the cost of Projected Replacements, or a constant annual increase in Annual Funding of Replacement Reserves. Table #2. Component Method Data - Years 1 through 30 Year Beginning balance Recommended annual funding 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 $444,318 $267,558 $250,500 $223,808 $214,004 $213,230 $213,380 $206,222 $197,810 $190,126 $187,384 Expenditures Year end balance Cumulative Expenditures Cumulative Receipts $31,295 $680,581 $31,295 $711,876 $103,845 $827,236 $135,140 $962,375 $64,611 $986,432 $199,751 $1,186,183 $6,790 $1,193,647 $206,541 $1,400,187 $25,030 $1,381,846 $231,571 $1,613,417 $114,847 $1,480,378 $346,418 $1,826,796 $176,372 $1,510,229 $522,790 $2,033,018 $209,415 $1,498,624 $732,205 $2,230,829 $94,825 $1,593,924 $827,030 $2,420,955 $1,781,309 $827,030 $2,608,339 Year Recommended annual funding 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 $187,384 $181,868 $176,477 $173,932 $173,932 $173,845 $173,644 $168,592 $168,467 $168,458 Expenditures Year end balance Cumulative Expenditures Cumulative Receipts $236,792 $1,731,901 $1,063,822 $2,795,723 $280,911 $1,632,858 $1,344,733 $2,977,591 $208,182 $1,601,154 $1,552,915 $3,154,069 $2,000 $1,773,086 $1,554,915 $3,328,001 $18,164 $1,928,855 $1,573,078 $3,501,933 $30,970 $2,071,730 $1,604,048 $3,675,778 $436,873 $1,808,501 $2,040,921 $3,849,422 $39,960 $1,937,133 $2,080,881 $4,018,014 $5,654 $2,099,946 $2,086,535 $4,186,481 $2,268,404 $2,086,535 $4,354,939 Year Recommended annual funding 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 $168,458 $166,382 $165,084 $163,810 $163,810 $163,804 $163,739 $163,581 $163,581 $163,581 Expenditures Year end balance Cumulative Expenditures Cumulative Receipts $421,114 $2,015,747 $2,507,649 $4,523,397 $424,854 $1,757,276 $2,932,503 $4,689,779 $453,573 $1,468,787 $3,386,076 $4,854,863 $1,200 $1,631,397 $3,387,276 $5,018,673 $17,454 $1,777,753 $3,404,730 $5,182,483 $50,084 $1,891,473 $3,454,814 $5,346,287 $78,855 $1,976,357 $3,533,669 $5,510,027 $7,860 $2,132,078 $3,541,529 $5,673,607 $25,030 $2,270,629 $3,566,559 $5,837,188 $292,287 $2,141,923 $3,858,846 $6,000,769 Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A8 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CURRENT FUNDING z CURRENT ANNUAL FUNDING OF REPLACEMENT RESERVES (as reported by the Association). $135,000 $156.25 Per unit (average), reported current monthly funding of Replacement Reserves General. Our evaluation of the Current Association Funding assumes that the Association will continue to fund Replacement Reserves at the current level of $135,000 per year in each of the 30 years of the Study Period. Our evaluation is based upon this Replacement Reserve Funding Level, a $444,318 Beginning Balance, the Projected Annual Replacement Expenditures shown in Graph #1 and listed in the Replacement Reserve Inventory, and any interest, inflation rate, or constant annual increase in annual contribution adjustments discussed below. z Evaluation. Our calculations have determined that Current Annual Funding of Replacement Reserves, as reported by the Association, is adequate to fund Projected Replacements throughout the 30-year Study Period. z Adjustment to the Current Association Funding for interest and inflation. The Calculations in the Replacement Reserve Analysis do not account for interest earned on Replacement Reserves, the effects of inflation of the cost of Projected Replacements, or a constant annual increase in Annual Funding of Replacement Reserves. z Comparison of Current Association Funding and Average Annual Expenditure. The average annual expenditure for Projected Replacements listed in the Reserve Inventory over the 30-year Study Period is $128,628 (see Graph #1). Current Association annual funding of Replacement Reserves is $135,000, or approximately 105 percent of the Average Annual Expenditure. Graph #5. Current Association Funding - Cumulative Receipts and Expenditures Graph $5,000,000 Current Funding - Cumulative Receipts Current Funding - Year End Balance Projected Replacements - Cumulative Expenditures $4,494,318 $4,000,000 $3,858,846 $3,000,000 $2,000,000 $1,000,000 $635,472 2040 2038 2039 2037 2036 2035 2034 2033 2031 2032 2030 2028 2029 2027 2026 2025 2024 2023 2021 2022 2020 2018 2019 2017 2016 2015 2014 2013 2011 2012 $0 Miller + Dodson Associates, Inc. Replacement Reserve Analysis - Page A9 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CURRENT FUNDING (cont'd) Table #3. Current Funding Data - Years 1 through 30 Year Beginning balance Annual deposit 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 $444,318 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 Expenditures Year end balance Cumulative Expenditures Cumulative Receipts $31,295 $548,023 $31,295 $579,318 $103,845 $579,178 $135,140 $714,318 $64,611 $649,567 $199,751 $849,318 $6,790 $777,777 $206,541 $984,318 $25,030 $887,747 $231,571 $1,119,318 $114,847 $907,900 $346,418 $1,254,318 $176,372 $866,528 $522,790 $1,389,318 $209,415 $792,113 $732,205 $1,524,318 $94,825 $832,288 $827,030 $1,659,318 $967,288 $827,030 $1,794,318 Year Annual deposit 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 Expenditures Year end balance Cumulative expenditures Cumulative receipts $236,792 $865,496 $1,063,822 $1,929,318 $280,911 $719,585 $1,344,733 $2,064,318 $208,182 $646,403 $1,552,915 $2,199,318 $2,000 $779,403 $1,554,915 $2,334,318 $18,164 $896,240 $1,573,078 $2,469,318 $30,970 $1,000,270 $1,604,048 $2,604,318 $436,873 $698,397 $2,040,921 $2,739,318 $39,960 $793,437 $2,080,881 $2,874,318 $5,654 $922,783 $2,086,535 $3,009,318 $1,057,783 $2,086,535 $3,144,318 Year Annual deposit 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 $135,000 Expenditures Year end balance Cumulative Expenditures Cumulative Receipts $421,114 $771,669 $2,507,649 $3,279,318 $424,854 $481,815 $2,932,503 $3,414,318 $453,573 $163,242 $3,386,076 $3,549,318 $1,200 $297,042 $3,387,276 $3,684,318 $17,454 $414,588 $3,404,730 $3,819,318 $50,084 $499,504 $3,454,814 $3,954,318 $78,855 $555,649 $3,533,669 $4,089,318 $7,860 $682,789 $3,541,529 $4,224,318 $25,030 $792,759 $3,566,559 $4,359,318 $292,287 $635,472 $3,858,846 $4,494,318 COMMENTS ON THE REPLACEMENT RESERVE ANALYSIS z This Replacement Reserve Study has been developed in compliance with the Community Associations Institute, National Reserve Study Standards, for a Level One Study - Full Service. z Pierpointe at Freemason Harbour has 72 units. The type of property is a condominium association. z Our calculations assume that Replacement Reserves are not subject to tax. z The study uses the adopted 2011 budget for reserves contributions as provided by the Manager. Intentionally Left Blank Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B1 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 REPLACEMENT RESERVE INVENTORY GENERAL INFORMATION Pierpointe at Freemason Harbour - Replacement Reserve Inventory identifies 256 items. Two types of items are identified, Projected Replacements and Excluded Items: z PROJECTED REPLACEMENTS. 202 of the items are Projected Replacements and the periodic replacements of these items are scheduled for funding from Replacement Reserves. The Projected Replacements have an estimated one-time replacement cost of $3,687,387. Replacements totaling $3,858,846 are scheduled in the Replacement Reserve Inventory over the 30-year Study Period. Projected Replacements are the replacement of commonly owned physical assets that require periodic replacement and whose replacement is to be funded from Replacement Reserves. z EXCLUDED ITEMS. 54 of the items are Excluded Items, and expenditures for these items are NOT scheduled for funding from Replacement Reserves. The accuracy of the calculations made in the Replacement Reserve Analysis is dependent on expenditures NOT being made for Excluded Items. The Excluded Items are listed in the Replacement Reserve Inventory to identify specific items and categories of items that are not to be funded from Replacement Reserves. There are multiple categories of items that are typically excluded from funding by Replacement Reserves, including but not limited to: Tax Code. The United States Tax Code grants very favorable tax status to Replacement Reserves, conditioned on expenditures being made within certain guidelines. These guidelines typically exclude maintenance activities, partial replacements, repairs, capital improvements, and one-time only replacements. Value. Items with a replacement cost of less that $1,000 are typically excluded from funding from Replacement Reserves. This exclusion is made to accurately reflect how Replacement Reserves are administered. If the Association has selected an alternative level, it will be noted in the Replacement Reserve Inventory - General Comments on Page B2. Long-lived Items. Items that when properly maintained, can be assumed to have a life equal to the property as a whole, are typically excluded from the Replacement Reserve Inventory. Unit improvements. Items located on property owned by a single unit and where the items serve a single unit are generally assumed to be the responsibility of that unit, not the Association. Other non-common improvements. Items owned by the local government, public and private utility companies, the United States Postal Service, Master Associations, state and local highway authorities, etc., may be installed on property that is owned by the Association. These types of items are generally not the responsibility of the Association and are excluded from the Replacement Reserve Inventory. The rationale for the exclusion of an item from funding by Replacement Reserves is discussed in more detail in the 'Comments' section of it's page of the Replacement Reserve Inventory. z CATEGORIES. The 256 items included in the Pierpointe at Freemason Harbour Replacement Reserve Inventory are divided into 19 major categories. Each category is printed on a separate page, Pages B3 to B20. z LEVEL OF SERVICE. This Replacement Reserve Inventory has been developed in compliance with the standards established for a Level One Study - Full Service, as defined by the National Reserve Study Standards, established in 1998 by Community Associations Institute, which states: A Level I - Full Service Reserve Study includes the computation of complete component inventory information regarding commonly owned components provided by the property manager, quantities derived from field measurements and/or quantity takeoffs from to-scale engineering drawings that may be made available. The condition of all components is ascertained from a visual inspection of each component by the analyst. The life expectancy and the value of the components are provided based on these observations and the funding status and funding plan are then derived from analysis of this data. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B2 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 REPLACEMENT RESERVE INVENTORY - GENERAL INFORMATION (cont'd) z INVENTORY DATA. Each of the 202 Projected Replacements listed in the Replacement Reserve Inventory includes the following data: Item Number. The Item Number is assigned sequentially and is intended for identification purposes only. Item Description. We have named each item included in the Inventory. Where the name of the item and the category are not sufficient to specifically identify the item, we have included additional information in the Comments section at the bottom of the page. Units. We have used standard abbreviations to identify the number of units including SF-square feet, FT-feet, SY-square yard, LS-lump sum, EA-each, and PR-pair. Nonstandard abbreviations are noted in the Comments section on the page on which the abbreviation is used. Number of Units. The methods used to develop the quantities are discussed in "Level of Service" above. Unit Replacement Cost. We use three sources to develop the unit cost data shown in the Inventory; actual replacement cost data provided by the client, industry standard estimating manuals, and a cost database that we have developed based upon our detailed interviews with contractors and service providers who are specialists in their respective lines of work. In addition, trends in the Producers Price Index (PPI), labor rates, and transportation costs are monitored and considered. This cost database is reviewed and updated regularly by Miller Dodson and biannually by an independent professional cost estimating firm. Normal Economic Life (Yrs). The number of years that a new and properly installed item should be expected to remain in service. Economic Life Remaining (Yrs). The estimated number of years before an item will need to be replaced. In "normal" conditions, this could be calculated by subtracting the age of the item from the Normal Economic Life of the item, but only rarely do physical assets age "normally". Some items may have longer or shorter lives depending on many factors such as environment, initial quality of the item, maintenance, etc. Total Replacement Cost. This is calculated by multiplying the Unit Replacement Cost by the Number of Units. Each of the 54 Excluded Items includes the Item Description, Units, and Number of Units. Many of the Excluded Items are listed as a 'Lump Sum' with a quantity of 1. For the Excluded Items, this indicates that all of the items identified by the 'Item Description' are excluded from funding by Replacement Reserves. z REVIEW OF EXPENDITURES. All expenditures from Replacement Reserves should be made only after consultation with an accounting professional. z PARTIAL FUNDING. Items may have been included in the Replacement Reserve Inventory at less than 100 percent of their full quantity and/or replacement cost. This is done on items that will never be replaced in their entirety, but which may require periodic replacements over an extended period of time. The assumptions that provide the basis for any partial funding are noted on in the Comments section. REPLACEMENT RESERVE INVENTORY - GENERAL COMMENTS z PLEASE NOTE: For inventory items with a Remaining Economic Life greater than 40 years, the replacement projections fall outside this study's limits and are not included in the annual calculations. However, tracking these items over time will bring them within the 40 year window and they will be included in the future. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B3 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 SITE COMPONENT PROJECTED REPLACEMENTS ITEM # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) sf sf 37,319 37,319 $0.20 $1.40 6 18 2 8 2 Concrete curb & gutter (20%) Concrete curb & gutter (20%) Concrete curb & gutter (20%) Concrete curb (20%) Concrete curb (20%) Concrete curb (20%) ft ft ft ft ft ft 138 138 138 292 292 292 $34.00 $34.00 $34.00 $30.00 $30.00 $30.00 54 54 54 54 54 54 8 26 44 8 26 44 2 Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) sf sf sf sf sf sf sf sf sf sf 43 43 43 43 43 43 43 43 43 43 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 60 60 60 60 60 60 60 60 60 60 6 12 18 24 30 36 42 48 54 60 2 Quarry tile at entrances (partial) Quarry tile at entrances (partial) sf sf 80 80 $15.00 $15.00 10 10 5 20 2 ITEM DESCRIPTION UNIT Asphalt pavement, seal coat Asphalt pavement, overlay SITE COMPONENT - Replacement Costs - Subtotal REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $7,464 $52,247 $4,699 $4,699 $4,699 $8,766 $8,766 $8,766 $404 $404 $404 $404 $404 $404 $404 $404 $404 $404 $1,200 $1,200 $106,544 SITE COMPONENT COMMENTS z We have assumed that the Association will replace the asphalt pavement by the installation of a 2 inch thick overlay. The pavement will need to be milled prior to the installation of the overlay. Milling and the cost of minor repairs (5 to 10 percent of the total area) to the base materials and bearing soils beneath the pavement are included in the cost shown above. z A small portion of exposed aggregate concrete walkway appears to have been replaced recently. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B4 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 SITE COMPONENT (cont.) PROJECTED REPLACEMENTS NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ea ea 2 2 $1,260.00 $280.00 24 12 14 2 2 Actuator, drop arm, entry gate Gate barrier Keypad entry system Entry gate reurbishing ea ea ea ls 2 2 1 1 $2,000.00 $2,300.00 $750.00 $1,200.00 8 16 8 4 4 6 4 none 2 Bulkhead, sheetpile (Bldg 1), refurbish Bulkhead, sheetpile (Bldg 1), replace sf lf 1,080 270 $18.75 $310.00 10 40 1 11 2 Bulkhead, (Bldg 2 & 3), refurbish Bulkhead, (Bldg 2 & 3), replace sf sf 2,272 568 $18.75 $365.00 10 40 1 31 2 30 31 Sink hole, backfill & cap ls 1 $14,000.00 4 4 2 $14,000 32 Concrete pile, refurbishing Concrete pile cap (partial) ls ls 1 1 $330,000.00 $35,000.00 25 15 16 10 2 $330,000 $35,000 ITEM # 21 22 23 24 25 26 27 28 29 33 ITEM DESCRIPTION UNIT Light pole, site Light, site, pole mounted SITE COMPONENT (cont.) - Replacement Costs - Subtotal REPLACEMENT COST ($) $2,520 $560 2 $4,000 $4,600 $750 $1,200 2 2 2 2 2 2 $20,250 $83,700 $42,600 $207,320 $746,500 SITE COMPONENT (cont.) COMMENTS z Bulkhead refurbishing is for exposed faces above mean low water and includes blasting, coating, partial concrete caps and partial deadmans to be replaced. Quantity is estimated from length of wall on drawings and an average exposed face of 4-feet. The values are highly speculative due to the complex nature of the site constraints but are comparable to a project at a nearby property with similar scope of work. z Bulkhead replacement assumes all mobilization, and working from the water side at portions were access is restricted by buildings proximity to waters edge. The price should be confirmed after an inspection and design by a professional engineer with marine structure experience. The values are highly speculative due to the complex nature of the site constraints but are comparable to a project at a nearby property with similar scope of work. z Concrete pile price should be confirmed after study & design by a professional engineer. z Sink hole price is based on Manager's recent reported replacements for 3 sink holes x 2 for increases. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B5 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 SITE COMPONENT (cont.) PROJECTED REPLACEMENTS ITEM # 34 35 36 37 38 39 40 41 NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ea lf lf 1 70 70 $4,400.00 $54.00 $43.00 35 10 10 25 10 10 2 Domestic water lateral (partial) Sanitary lateral (partial) ls ls 1 1 $3,600.00 $2,700.00 10 10 10 10 2 Storm water, curb inlet (25%) Storm water, drop inlet (50%) Storm water, 18" RCP (25%) ea ea lf 1 1 41 $4,750.00 $4,100.00 $39.00 30 30 10 20 20 20 2 ITEM DESCRIPTION UNIT 3" water meter Domestic water main (10%) Sanitary main (10%) SITE COMPONENT (cont.) - Replacement Costs - Subtotal REPLACEMENT COST ($) 2 2 2 2 2 $4,400 $3,780 $3,010 $3,600 $2,700 $4,750 $4,100 $1,609 $27,949 SITE COMPONENT (cont.) COMMENTS z Comprehensive drawings detailing the components of the systems listed above were not available for our review. We have included the estimated cost of the systems based upon our experience with other similar communities. We have assumed that 10 percent of the system(s) will require replacement. In the future, this assumption and the estimated costs should be adjusted based upon actual experience at the community. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B6 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING EXTERIOR (Building 1) PROJECTED REPLACEMENTS ITEM # 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 ITEM DESCRIPTION UNIT Roofing, shingle asphalt/fiberglass Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing, metal PVC Fascia Trim EIFS dormers, chimneys & cupola, replace EIFS dormers, chimneys & cupola, refurbish Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators sf ls ft ls ls ls ls ea ea ea sf ls lf sf sf lf lf lf lf ls ls ea ea ea NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) 11,871 1 494 1 1 1 1 73 2 2 2,223 1 312 3,870 3,870 537 537 128 128 1 1 2 4 2 $5.90 $14,000.00 $8.50 $3,900.00 $18,000.00 $15,600.00 $3,500.00 $77.00 $720.00 $600.00 $8.75 $4,000.00 $17.90 $16.77 $24.00 $3.05 $38.50 $4.15 $4.15 $16,000.00 $4,800.00 $1,655.00 $915.00 $950.00 30 20 30 30 20 30 10 20 30 30 20 20 30 15 30 15 30 15 30 30 30 15 25 10 10 10 20 20 10 20 none 10 20 20 10 10 none 5 20 5 20 5 20 30 20 none 15 5 BUILDING EXTERIOR (Building 1) - Replacement Costs - Subtotal BUILDING EXTERIOR (Building 1) COMMENTS z Garage door replacement is based on a quote to the Manager and is planned for 2011. REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $70,042 $14,000 $4,199 $3,900 $18,000 $15,600 $3,500 $5,621 $1,440 $1,200 $19,451 $4,000 $5,585 $64,900 $92,880 $1,636 $20,655 $531 $531 $16,000 $4,800 $3,310 $3,660 $1,900 $377,341 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B7 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING EXTERIOR (Building 2) PROJECTED REPLACEMENTS ITEM # 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 ITEM DESCRIPTION UNIT Roofing, shingle asphalt/fiberglass Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing , metal PVC Fascia EIFS dormers & chimneys, replace EIFS dormers & chimneys, refurbish Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators sf ls ft ls ls ls ls ea ea ea sf ls lf sf sf lf lf lf lf ls ls ea ea ea NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) 11,871 1 494 1 1 1 1 73 2 2 2,223 1 312 3,870 3,870 537 537 128 128 1 1 2 4 2 $4.80 $14,000.00 $8.50 $3,600.00 $18,000.00 $15,600.00 $3,500.00 $77.00 $720.00 $600.00 $8.75 $4,000.00 $17.90 $16.77 $24.00 $3.05 $38.50 $4.15 $4.15 $16,000.00 $4,800.00 $1,655.00 $915.00 $950.00 30 20 30 30 20 30 10 20 30 30 20 20 30 15 30 15 30 15 30 30 30 15 25 10 16 11 21 21 11 21 1 11 21 21 11 11 1 6 21 6 21 6 21 30 21 1 16 6 BUILDING EXTERIOR (Building 2) - Replacement Costs - Subtotal BUILDING EXTERIOR (Building 2) COMMENTS REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $56,983 $14,000 $4,199 $3,600 $18,000 $15,600 $3,500 $5,621 $1,440 $1,200 $19,451 $4,000 $5,585 $64,900 $92,880 $1,636 $20,655 $531 $531 $16,000 $4,800 $3,310 $3,660 $1,900 $363,983 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B8 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING EXTERIOR (Building 3) PROJECTED REPLACEMENTS ITEM # 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 ITEM DESCRIPTION UNIT Roofing, standing seam metal Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing, metal PVC Fascia EIFS dormers, chimneys & cupola, replace EIFS dormers, chimneys & cupola, refurbish Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators sf ls ft ls ls ls ls ea ea ea sf ls lf sf sf lf lf lf lf ls ls ea ea ea NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) 19,631 1 813 1 1 1 1 83 4 4 3,659 1 412 4,734 4,734 572 572 192 192 1 2 4 8 4 $14.65 $21,000.00 $8.50 $5,800.00 $26,000.00 $15,600.00 $3,500.00 $77.00 $720.00 $600.00 $8.75 $8,800.00 $17.90 $16.77 $24.00 $3.05 $38.50 $4.15 $4.15 $24,000.00 $4,800.00 $1,655.00 $915.00 $950.00 30 20 30 30 20 30 10 20 30 30 20 20 30 15 30 15 30 15 30 30 30 15 25 10 29 12 22 22 12 22 2 12 22 22 12 12 2 7 22 7 22 7 22 30 22 2 17 7 BUILDING EXTERIOR (Building 3) - Replacement Costs - Subtotal BUILDING EXTERIOR (Building 3) COMMENTS REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $287,587 $21,000 $6,911 $5,800 $26,000 $15,600 $3,500 $6,353 $2,880 $2,400 $32,012 $8,800 $7,375 $79,389 $113,616 $1,743 $22,003 $797 $797 $24,000 $9,600 $6,620 $7,320 $3,800 $695,901 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B9 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING EXTERIOR (Miscellaneous) PROJECTED REPLACEMENTS ITEM # 114 115 116 117 118 119 120 121 122 123 124 NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) sf sf sf sf sf sf 3,870 3,870 5,805 1,482 1,482 2,519 $4.19 $4.19 $4.19 $6.48 $6.48 $6.48 15 15 15 20 20 20 6 7 7 10 11 12 2 Awning, fabric (Building 3) Awning, frame (Building 3) ls ls 1 1 $2,700.00 $1,900.00 7 14 1 8 2 Joint Sealants,exterior (Building 1) Joint Sealants, exterior (Building 2) Joint Sealants, exterior (Building 3) ls ls ls 1 1 1 $17,700.00 $17,700.00 $25,400.00 10 10 10 none 1 2 2 ITEM DESCRIPTION UNIT Balcony Soffits (Bldg 1) Balcony Soffits (Bldg 2) Balcony Soffits (Bldg 3) Roof eave soffits (Bldg 1) Roof eave soffits (Bldg 2) Roof eave soffits (Bldg 3) BUILDING EXTERIOR (Miscellaneous) - Replacement Costs - Subtotal BUILDING EXTERIOR (Miscellaneous) COMMENTS REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 $16,215 $16,215 $24,323 $9,603 $9,603 $16,326 $2,700 $1,900 $17,700 $17,700 $25,400 $157,686 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B10 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING INTERIOR (Building 1) PROJECTED REPLACEMENTS ITEM # 125 126 127 128 ITEM DESCRIPTION UNIT Flooring, interior carpet (Flr 2-4) Flooring, porcelain tile (1st Floor) sf sf Lobby furnishings (partial) Mailboxes, aluminum gang boxes ls ea NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) 1,200 770 $4.25 $18.44 10 30 1 20 2 1 20 $6,500.00 $82.00 20 35 10 25 2 BUILDING INTERIOR (Building 1) - Replacement Costs - Subtotal BUILDING INTERIOR (Building 1) COMMENTS REPLACEMENT COST ($) 2 2 $5,100 $14,199 $6,500 $1,640 $27,439 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B11 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING INTERIOR (Building 2) PROJECTED REPLACEMENTS ITEM # NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) sf sf sf 300 600 770 $18.44 $4.25 $18.44 30 10 30 21 2 21 2 Lobby furnishings (partial) Mailboxes, aluminum gang boxes ls ea 1 20 $6,500.00 $82.00 20 35 10 25 2 Corridor wall coverings (Flr 2-4) sf 2,700 $3.15 15 6 2 ITEM DESCRIPTION UNIT Flooring, porcelain tile (Flr 4) Flooring, interior carpet (Flr 2 & 3) Flooring, porcelain tile (1st Floor) 133 134 129 130 131 132 BUILDING INTERIOR (Building 2) - Replacement Costs - Subtotal BUILDING INTERIOR (Building 2) COMMENTS REPLACEMENT COST ($) 2 2 2 $5,532 $2,550 $14,199 $6,500 $1,640 $8,505 $38,926 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B12 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING INTERIOR (Building 3) PROJECTED REPLACEMENTS ITEM # ITEM DESCRIPTION UNIT Flooring, marble tile (Flrs 2-4) Flooring, interior carpet (Flr 2-4) Flooring, porcelain tile (1st Floor) sf sf sf 139 Lobby furnishings (partial) Mailboxes, aluminum gang boxes ls ea 140 Corridor wall coverings (Flr 2-4) sf 135 136 137 138 NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) 915 1,530 770 $25.65 $4.25 $18.44 40 10 30 32 2 22 2 1 32 $6,500.00 $82.00 20 35 10 25 2 1,440 $3.15 15 7 2 BUILDING INTERIOR (Building 3) - Replacement Costs - Subtotal BUILDING INTERIOR (Building 3) COMMENTS REPLACEMENT COST ($) 2 2 2 $23,470 $6,503 $14,199 $6,500 $2,624 $4,536 $57,831 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B13 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING SYSTEM (Building 1) PROJECTED REPLACEMENTS ITEM # 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 ITEM DESCRIPTION UNIT Elevator cab & door, passenger Elevator, hydraulic psngr, controls Elevator, hydraulic psngr, piston Domestic water pumps Pump controller Plumbing risers, partial Pressure tanks Backflow preventer, domestic Backflow preventer, fire Fire pump & jockey pump Fire pump controllers Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances Backup generator Switchgear Intercom system (partial) Fire alarm control panel ea ea ea ea ea unit ls ea ea ls ls ea ea ea ea ea ls ls ea ea ls ls ls ls NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) 1 1 1 2 1 20 1 1 1 1 1 1 1 2 2 2 1 1 20 4 1 1 1 1 $7,900.00 $29,500.00 $14,800.00 $1,300.00 $1,450.00 $8,800.00 $1,600.00 $3,900.00 $4,300.00 $7,700.00 $3,300.00 $1,985.00 $1,250.00 $1,490.00 $770.00 $840.00 $2,000.00 $1,200.00 $156.00 $540.00 $39,000.00 $3,600.00 $3,100.00 $12,000.00 15 15 30 20 20 40 40 30 30 30 30 20 20 24 12 10 8 16 15 15 30 30 15 25 5 5 20 10 10 30 30 20 20 20 20 10 10 14 2 15 4 6 5 5 20 20 1 15 BUILDING SYSTEM (Building 1) - Replacement Costs - Subtotal BUILDING SYSTEM (Building 1) COMMENTS z The fire pump serves all three buildings. z The backup generator serves all three buildings. REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $7,900 $29,500 $14,800 $2,600 $1,450 $176,000 $1,600 $3,900 $4,300 $7,700 $3,300 $1,985 $1,250 $2,980 $1,540 $1,680 $2,000 $1,200 $3,120 $2,160 $39,000 $3,600 $3,100 $12,000 $328,665 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B14 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING SYSTEM (Building 2) PROJECTED REPLACEMENTS ITEM # 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ea ea ea 1 1 1 $7,900.00 $60,200.00 $30,100.00 15 15 20 6 6 11 2 Domestic water pumps Pump controllers Plumbing risers, partial Pressure tanks Backflow preventer ea ea unit ls ea 2 1 20 1 1 $1,300.00 $1,450.00 $8,800.00 $1,600.00 $3,900.00 20 20 40 40 30 11 11 31 31 21 2 Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) ea ea ea ea ea 1 1 2 2 2 $1,985.00 $1,250.00 $1,490.00 $770.00 $840.00 20 20 24 12 10 11 11 15 3 16 2 Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances ls ls ea ea 1 1 20 4 $2,000.00 $1,200.00 $156.00 $540.00 8 16 15 15 5 7 6 6 2 Intercom system (partial) Fire alarm control panel ls ls 1 1 $3,100.00 $12,000.00 15 25 2 16 2 ITEM DESCRIPTION UNIT Elevator cab & door, passenger Elevator, traction psngr, controls Elevator, traction psngr, mechanical BUILDING SYSTEM (Building 2) - Replacement Costs - Subtotal BUILDING SYSTEM (Building 2) COMMENTS REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $7,900 $60,200 $30,100 $2,600 $1,450 $176,000 $1,600 $3,900 $1,985 $1,250 $2,980 $1,540 $1,680 $2,000 $1,200 $3,120 $2,160 $3,100 $12,000 $316,765 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B15 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 BUILDING SYSTEM (Building 3) PROJECTED REPLACEMENTS ITEM # 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ea ea ea 1 1 1 $7,900.00 $60,200.00 $30,100.00 15 15 20 7 7 12 2 Domestic water pumps Pump controllers Plumbing risers, partial Pressure tanks Backflow preventer ea ea unit ls ea 2 1 32 1 1 $1,300.00 $1,450.00 $8,800.00 $3,200.00 $3,900.00 20 20 40 40 30 12 12 32 32 22 2 Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) ea ea ea ea ea 1 1 4 4 3 $1,985.00 $1,250.00 $1,490.00 $770.00 $840.00 20 20 24 12 10 12 12 16 4 17 2 Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances ls ls ea ea 1 1 32 8 $3,100.00 $1,850.00 $156.00 $540.00 8 16 15 15 6 8 7 7 2 Intercom system (partial) Fire alarm control panel ls ls 1 1 $5,250.00 $16,600.00 15 25 3 17 2 ITEM DESCRIPTION UNIT Elevator cab & door, passenger Elevator, traction psngr, controls Elevator, traction psngr, mechanical BUILDING SYSTEM (Building 3) - Replacement Costs - Subtotal BUILDING SYSTEM (Building 3) COMMENTS REPLACEMENT COST ($) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $7,900 $60,200 $30,100 $2,600 $1,450 $281,600 $3,200 $3,900 $1,985 $1,250 $5,960 $3,080 $2,520 $3,100 $1,850 $4,992 $4,320 $5,250 $16,600 $441,857 Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B16 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 VALUATION EXCLUSIONS EXCLUDED ITEMS ITEM # NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ITEM DESCRIPTION UNIT REPLACEMENT COST ($) Site lighting fixtures, right of way Property identification signage Miscellaneous signage Bulletin boards Bollard/access control devices Stairway handrails ls ls ls ls ls ls 1 1 1 1 1 1 3 Fire extinguisher cabinet Sprinkler head Emergency lighting, exit light, etc. Signage Interior doors, unless noted otherwise ls ls ls ls ls 1 1 1 1 1 3 Electric heaters, unless noted otherwise ls 1 3 EXCLUDED Carbon monoxide detectors Garage storage unit doors ls ls 1 1 3 EXCLUDED EXCLUDED Janitor sinks Inst hot water heaters for janitor ls ls 1 1 3 3 3 3 3 3 3 3 3 3 3 3 EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED VALUATION EXCLUSIONS COMMENTS z Valuation Exclusions. For ease of administration of the Replacement Reserves and to reflect accurately how Replacement Reserves are administered, items with a dollar value less than $1,000.00 have not been scheduled for funding from Replacement Reserves. Examples of items excluded from funding by Replacement Reserves by this standard are listed above. z The list above exemplifies exclusions by the cited standard(s) and is not intended to be comprehensive. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B17 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 LONG-LIFE EXCLUSIONS EXCLUDED ITEMS ITEM # NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ITEM DESCRIPTION UNIT REPLACEMENT COST ($) Exterior brick veneer Stairways ls ls 1 1 3 Building foundation(s) Concrete floor slabs (interior) Wall, floor, & roof structure ls ls ls 1 1 1 3 Common element electrical services Electrical wiring Fire protection system, UNO ls ls ls 1 1 1 3 3 3 3 3 3 EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED LONG-LIFE EXCLUSIONS COMMENTS z Long Life Exclusions. Components that when properly maintained, can be assumed to have a life equal to the property as a whole, are normally excluded from the Replacement Reserve Inventory. Examples of items excluded from funding by Replacement Reserves by this standard are listed above. z Exterior masonry is generally assumed to have an unlimited economic life but periodic repointing is required and we have included this for funding in the Replacement Reserve Inventory. z The list above exemplifies exclusions by the cited standard(s) and is not intended to be comprehensive. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B18 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 UNIT IMPROVEMENTS EXCLUSIONS EXCLUDED ITEMS ITEM # NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ITEM DESCRIPTION UNIT REPLACEMENT COST ($) Domestic water pipes serving one unit Sanitary sewers serving one unit Electrical wiring serving one unit Cable TV service serving one unit Telephone service serving one unit Gas service serving one unit ls ls ls ls ls ls 1 1 1 1 1 1 3 Unit windows Unit sliding doors Unit entry doors Unit balcony tile (where added) ls ls ls ls 1 1 1 1 3 Unit interior Unit HVAC system ls ls 1 1 3 3 3 3 3 3 3 3 3 3 EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED UNIT IMPROVEMENTS EXCLUSIONS COMMENTS z Unit improvement Exclusions. We understand that the elements of the project that relate to a single unit are the responsibility of that unit owner. Examples of items excluded from funding by Replacement Reserves by this standard are listed above. z The list above exemplifies exclusions by the cited standard(s) and is not intended to be comprehensive. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B19 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 UTILITY EXCLUSIONS EXCLUDED ITEMS ITEM # ITEM DESCRIPTION UNIT Primary electric feeds Electric transformers Cable TV systems and structures Telephone cables and structures Site lighting, along the waterfront Gas mains and meters ls ls ls ls ls ls NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) 1 1 1 1 1 1 REPLACEMENT COST ($) 3 3 3 3 3 3 EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED UTILITY EXCLUSIONS COMMENTS z Utility Exclusions. Many improvements owned by utility companies are on property owned by the Association. We have assumed that repair, maintenance, and replacements of these components will be done at the expense of the appropriate utility company. Examples of items excluded from funding Replacement Reserves by this standard are listed above. z The list above exemplifies exclusions by the cited standard(s) and is not intended to be comprehensive. Miller + Dodson Associates, Inc. Replacement Reserve Inventory - Page B20 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 MAINTENANCE AND REPAIR EXCLUSIONS EXCLUDED ITEMS ITEM # NUMBER OF UNITS UNIT REPLACEMENT COST ($) NORMAL ECONOMIC LIFE (YRS) REMAINING ECONOMIC LIFE (YRS) ITEM DESCRIPTION UNIT REPLACEMENT COST ($) Cleaning of asphalt pavement Crack sealing of asphalt pavement Painting of curbs Striping of parking spaces Numbering of parking spaces ls ls ls ls ls 1 1 1 1 1 3 Landscaping and site grading ls 1 3 EXCLUDED Exterior painting Interior painting ls ls 1 1 3 EXCLUDED EXCLUDED Janitorial service Repair services Partial replacements Capital improvements ls ls ls ls 1 1 1 1 3 3 3 3 3 3 3 3 3 EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED EXCLUDED MAINTENANCE AND REPAIR EXCLUSIONS COMMENTS z Maintenance activities, one-time-only repairs, and capital improvements. These activities are NOT appropriately funded from Replacement Reserves. The inclusion of such component in the Replacement Reserve Inventory could jeopardize the special tax status of ALL Replacement Reserves, exposing the Association to significant tax liabilities. We recommend that the Board of Directors discuss these exclusions and Revenue Ruling 75-370 with a Certified Public Accountant. z Examples of items excluded from funding by Replacement Reserves by this standard are listed above. z The list above exemplifies exclusions by the cited standard(s) and is not intended to be comprehensive. Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C1 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED ANNUAL REPLACEMENTS GENERAL INFORMATION CALENDAR OF ANNUAL REPLACEMENTS. The 202 Projected Replacements in the Pierpointe at Freemason Harbou Replacement Reserve Inventory whose replacement is scheduled to be funded from Replacement Reserves are broken down on a year-by-year basis, beginning on Page C2. REPLACEMENT RESERVE ANALYSIS AND INVENTORY POLICIES, PROCEDURES, AND ADMINISTRATION z REVISIONS. Revisions will be made to the Replacement Reserve Analysis and Replacement Reserve Inventory in accordance with the written instructions of the Board of Directors. No additional charge is incurred for the first revision, if requested in writing within three months of the date of the Replacement Reserve Study. It is our policy to provide revisions in electronic (Adobe PDF) format only. z TAX CODE. The United States Tax Code grants favorable tax status to a common interest development (CID) meeting certain guidelines for their Replacement Reserve. If a CID files their taxes as a 'Corporation' on Form 1020 (IRC Section 277), these guidelines typically require maintenance activities, partial replacements, minor replacements, capital improvements, and one-time only replacements to be excluded from Reserves. A CID cannot commingle planning for maintenance activities with capital replacement activities in the Reserves (Revenue Ruling 75-370). Funds for maintenance activities and capital replacements activities must be held in separate accounts. If a CID files taxes as an "Exempt Homeowners Association" using Form 1020H (IRC Section 528), the CID does not have to segregate these activities. However, because the CID may elect to change their method of filing from year to year within the Study Period, we advise using the more restrictive approach. We further recommend that the CID consult with their Accountant and consider creating separate and independent accounts and reserves for large maintenance items, such as painting. z CONFLICT OF INTEREST. Neither Miller - Dodson Associates nor the Reserve Analyst has any prior or existing relationship with this Association which would represent a real or perceived conflict of interest. z RELIANCE ON DATA PROVIDED BY THE CLIENT. Information provided by an official representative of the Association regarding financial, physical conditions, quality, or historical issues is deemed reliable. z INTENT. This Replacement Reserve Study is a reflection of the information provided by the Association and the visual evaluations of the Analyst. It has been prepared for the sole use of the Association and is not for the purpose of performing an audit, quality/forensic analyses, or background checks of historical records. z PREVIOUS REPLACEMENTS. Information provided to Miller - Dodson Associates regarding prior replacements is considered to be accurate and reliable. Our visual evaluation is not a project audit or quality inspection. z UPDATING. In the first two or possibly three years after the completion of a Level One Replacement Reserve Study, we recommend the Association review and revise the Replacement Reserve Analysis and Inventory annually to take into account replacements which have occurred and known changes in replacement costs. This can frequently be handled as a Level Two or Level Three Study (as defined by the Community Associations Institute), unless the Association has completed major replacement projects. A full analysis (Level One) based on a comprehensive visual evaluation of the site should be accomplished every three to five years or after each major replacement project. z EXPERIENCE WITH FUTURE REPLACEMENTS. The Calendar of Annual Projected Replacements, lists replacements we have projected to occur over the next thirty years, begins on Page C2. Actual experience in replacing the items may differ significantly from the cost estimates and time frames shown because of conditions beyond our control. These differences may be caused by maintenance practices, inflation, variations in pricing and market conditions, future technological developments, regulatory actions, acts of God, and luck. Some items may function normally during our visual evaluation and then fail without notice. z REVIEW OF THE REPLACEMENT RESERVE STUDY. For this study to be effective, it should be reviewed by the Pierpointe at Freemason Harbour Board of Directors, those responsible for the management of the items included in the Replacement Reserve Inventory, and the accounting professionals employed by the Association. Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C2 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 1 TO 3 Item 26 48 54 63 122 2011 Entry gate reurbishing EIFS dormers, chimneys & c Sill pans for sliding doors Garage doors Joint Sealants,exterior (Build Total Scheduled Replacements $ $1,200 $3,500 $5,585 $3,310 $17,700 $31,295 Item 27 29 72 78 87 120 123 125 163 2012 Bulkhead, sheetpile (Bldg 1) Bulkhead, (Bldg 2 & 3), refur EIFS dormers & chimneys, r Sill pans for sliding doors Garage doors Awning, fabric (Building 3) Joint Sealants, exterior (Buil Flooring, interior carpet (Flr 2 Intercom system (partial) Total Scheduled Replacements $ $20,250 $42,600 $3,500 $5,585 $3,310 $2,700 $17,700 $5,100 $3,100 $103,845 Item 1 22 96 102 111 124 130 136 155 182 2013 Asphalt pavement, seal coat Light, site, pole mounted EIFS dormers, chimneys & c Sill pans for sliding doors Garage doors Joint Sealants, exterior (Buil Flooring, interior carpet (Flr 2 Flooring, interior carpet (Flr 2 Exhaust fans, garage, motor Intercom system (partial) Total Scheduled Replacements $ $7,464 $560 $3,500 $7,375 $6,620 $25,400 $2,550 $6,503 $1,540 $3,100 $64,611 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C3 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 4 TO 6 Item 2014 176 Exhaust fans, garage, motor 201 Intercom system (partial) $ $1,540 $5,250 Total Scheduled Replacements $6,790 Item 23 25 26 31 157 195 2015 Actuator, drop arm, entry ga Keypad entry system Entry gate reurbishing Sink hole, backfill & cap Interior lighting, garage (part Exhaust fans, garage, motor Total Scheduled Replacements $ $4,000 $750 $1,200 $14,000 $2,000 $3,080 $25,030 Item 19 55 57 59 65 141 142 159 160 178 2016 Quarry tile at entrances (par Balcony decking Balcony railings, refurbish French railings, refurbish Garage door operators Elevator cab & door, passen Elevator, hydraulic psngr, co Exterior lighting, balconies Exterior lighting, entrances Interior lighting, garage (part Total Scheduled Replacements $ $1,200 $64,900 $1,636 $531 $1,900 $7,900 $29,500 $3,120 $2,160 $2,000 $114,847 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C4 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 7 TO 9 Item 9 24 79 81 83 89 114 134 158 165 166 180 181 197 2017 Concrete sidewalk (6%) Gate barrier Balcony decking Balcony railings, refurbish French railings, refurbish Garage door operators Balcony Soffits (Bldg 1) Corridor wall coverings (Flr 2 Interior lighting, interiors (pa Elevator cab & door, passen Elevator, traction psngr, con Exterior lighting, balconies Exterior lighting, entrances Interior lighting, garage (part Total Scheduled Replacements $ $404 $4,600 $64,900 $1,636 $531 $1,900 $16,215 $8,505 $1,200 $7,900 $60,200 $3,120 $2,160 $3,100 $176,372 Item 103 105 107 113 115 116 140 179 184 185 199 200 2018 Balcony decking Balcony railings, refurbish French railings, refurbish Garage door operators Balcony Soffits (Bldg 2) Balcony Soffits (Bldg 3) Corridor wall coverings (Flr 2 Interior lighting, interiors (pa Elevator cab & door, passen Elevator, traction psngr, con Exterior lighting, balconies Exterior lighting, entrances Total Scheduled Replacements $ $79,389 $1,743 $797 $3,800 $16,215 $24,323 $4,536 $1,200 $7,900 $60,200 $4,992 $4,320 $209,415 Item 1 2 3 6 26 31 120 121 198 2019 Asphalt pavement, seal coat Asphalt pavement, overlay Concrete curb & gutter (20% Concrete curb (20%) Entry gate reurbishing Sink hole, backfill & cap Awning, fabric (Building 3) Awning, frame (Building 3) Interior lighting, interiors (pa Total Scheduled Replacements $ $7,464 $52,247 $4,699 $8,766 $1,200 $14,000 $2,700 $1,900 $1,850 $94,825 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C5 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 10 TO 12 Item 2020 No Scheduled Replacements $ Item 33 35 36 37 38 42 43 46 48 49 52 53 117 122 127 132 138 144 145 152 153 2021 Concrete pile cap (partial) Domestic water main (10%) Sanitary main (10%) Domestic water lateral (parti Sanitary lateral (partial) Roofing, shingle asphalt/fibe Roofing, single ply membran PVC Fascia Trim EIFS dormers, chimneys & c Exhaust vent wall caps Brick veneer, repoint (10%) Replace steel lintels (partial) Roof eave soffits (Bldg 1) Joint Sealants,exterior (Build Lobby furnishings (partial) Lobby furnishings (partial) Lobby furnishings (partial) Domestic water pumps Pump controller Heat pump, 2.5 ton Air handler Total Scheduled Replacements $ $35,000 $3,780 $3,010 $3,600 $2,700 $70,042 $14,000 $18,000 $3,500 $5,621 $19,451 $4,000 $9,603 $17,700 $6,500 $6,500 $6,500 $2,600 $1,450 $1,985 $1,250 $236,792 Item 27 28 29 67 70 72 73 76 77 118 123 125 167 168 169 173 174 2022 Bulkhead, sheetpile (Bldg 1) Bulkhead, sheetpile (Bldg 1) Bulkhead, (Bldg 2 & 3), refur Roofing, single ply membran PVC Fascia EIFS dormers & chimneys, r Exhaust vent wall caps Brick veneer, repoint (10%) Replace steel lintels (partial) Roof eave soffits (Bldg 2) Joint Sealants, exterior (Buil Flooring, interior carpet (Flr 2 Elevator, traction psngr, mec Domestic water pumps Pump controllers Heat pump, 2.5 ton Air handler Total Scheduled Replacements $ $20,250 $83,700 $42,600 $14,000 $18,000 $3,500 $5,621 $19,451 $4,000 $9,603 $17,700 $5,100 $30,100 $2,600 $1,450 $1,985 $1,250 $280,911 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C6 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 13 TO 15 Item 10 23 25 26 31 91 94 96 97 100 101 119 124 130 136 157 186 187 188 192 193 2023 Concrete sidewalk (6%) Actuator, drop arm, entry ga Keypad entry system Entry gate reurbishing Sink hole, backfill & cap Roofing, single ply membran PVC Fascia EIFS dormers, chimneys & c Exhaust vent wall caps Brick veneer, repoint (10%) Replace steel lintels (partial) Roof eave soffits (Bldg 3) Joint Sealants, exterior (Buil Flooring, interior carpet (Flr 2 Flooring, interior carpet (Flr 2 Interior lighting, garage (part Elevator, traction psngr, mec Domestic water pumps Pump controllers Heat pump, 2.5 ton Air handler Total Scheduled Replacements $ $404 $4,000 $750 $1,200 $14,000 $21,000 $26,000 $3,500 $6,353 $32,012 $8,800 $16,326 $25,400 $2,550 $6,503 $2,000 $30,100 $2,600 $1,450 $1,985 $1,250 Item 2024 178 Interior lighting, garage (part $ $2,000 $208,182 Total Scheduled Replacements $2,000 Item 1 21 22 154 155 197 2025 Asphalt pavement, seal coat Light pole, site Light, site, pole mounted Exhaust fans, garage, 5,100 Exhaust fans, garage, motor Interior lighting, garage (part Total Scheduled Replacements $ $7,464 $2,520 $560 $2,980 $1,540 $3,100 $18,164 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C7 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 16 TO 18 Item 19 63 64 65 120 156 164 175 176 2026 Quarry tile at entrances (par Garage doors Exterior doors Garage door operators Awning, fabric (Building 3) Unit heaters, ground floor (2 Fire alarm control panel Exhaust fans, garage, 5,100 Exhaust fans, garage, motor Total Scheduled Replacements $ $1,200 $3,310 $3,660 $1,900 $2,700 $1,680 $12,000 $2,980 $1,540 $30,970 Item 26 31 32 66 87 88 89 163 177 183 194 195 2027 Entry gate reurbishing Sink hole, backfill & cap Concrete pile, refurbishing Roofing, shingle asphalt/fibe Garage doors Exterior doors Garage door operators Intercom system (partial) Unit heaters, ground floor (2 Fire alarm control panel Exhaust fans, garage, 5,100 Exhaust fans, garage, motor Total Scheduled Replacements $ $1,200 $14,000 $330,000 $56,983 $3,310 $3,660 $1,900 $3,100 $1,680 $12,000 $5,960 $3,080 $436,873 Item 111 112 113 182 196 202 2028 Garage doors Exterior doors Garage door operators Intercom system (partial) Unit heaters, ground floor (2 Fire alarm control panel Total Scheduled Replacements $ $6,620 $7,320 $3,800 $3,100 $2,520 $16,600 $39,960 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C8 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 19 TO 21 Item 2029 11 Concrete sidewalk (6%) 201 Intercom system (partial) Total Scheduled Replacements $ $404 $5,250 $5,654 Item 2030 No Scheduled Replacements $ Item 1 20 23 25 26 31 35 36 37 38 39 40 41 44 45 47 48 50 51 55 56 57 58 59 60 62 122 126 141 142 143 148 149 150 151 157 159 160 161 162 2031 Asphalt pavement, seal coat Quarry tile at entrances (par Actuator, drop arm, entry ga Keypad entry system Entry gate reurbishing Sink hole, backfill & cap Domestic water main (10%) Sanitary main (10%) Domestic water lateral (parti Sanitary lateral (partial) Storm water, curb inlet (25% Storm water, drop inlet (50% Storm water, 18" RCP (25% Gutter & downspout, 6" alum Roof flashing, metal EIFS dormers, chimneys & c EIFS dormers, chimneys & c Louvers, garage intake, 4'x6 Louvers, garage exhaust fan Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Storefront entrances Joint Sealants,exterior (Build Flooring, porcelain tile (1st F Elevator cab & door, passen Elevator, hydraulic psngr, co Elevator, hydraulic psngr, pis Backflow preventer, domesti Backflow preventer, fire Fire pump & jockey pump Fire pump controllers Interior lighting, garage (part Exterior lighting, balconies Exterior lighting, entrances Backup generator Switchgear Total Scheduled Replacements $ $7,464 $1,200 $4,000 $750 $1,200 $14,000 $3,780 $3,010 $3,600 $2,700 $4,750 $4,100 $1,609 $4,199 $3,900 $15,600 $3,500 $1,440 $1,200 $64,900 $92,880 $1,636 $20,655 $531 $531 $4,800 $17,700 $14,199 $7,900 $29,500 $14,800 $3,900 $4,300 $7,700 $3,300 $2,000 $3,120 $2,160 $39,000 $3,600 $421,114 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C9 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 22 TO 24 Item 27 29 68 69 71 72 74 75 79 80 81 82 83 84 86 114 123 125 129 131 134 165 166 172 178 180 181 2032 Bulkhead, sheetpile (Bldg 1) Bulkhead, (Bldg 2 & 3), refur Gutter & downspout, 6" alum Roof flashing , metal EIFS dormers & chimneys, r EIFS dormers & chimneys, r Louvers, garage intake, 4'x6 Louvers, garage exhaust fan Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Storefront entrances Balcony Soffits (Bldg 1) Joint Sealants, exterior (Buil Flooring, interior carpet (Flr 2 Flooring, porcelain tile (Flr 4 Flooring, porcelain tile (1st F Corridor wall coverings (Flr 2 Elevator cab & door, passen Elevator, traction psngr, con Backflow preventer Interior lighting, garage (part Exterior lighting, balconies Exterior lighting, entrances Total Scheduled Replacements $ $20,250 $42,600 $4,199 $3,600 $15,600 $3,500 $1,440 $1,200 $64,900 $92,880 $1,636 $20,655 $531 $531 $4,800 $16,215 $17,700 $5,100 $5,532 $14,199 $8,505 $7,900 $60,200 $3,900 $2,000 $3,120 $2,160 $424,854 Item 24 92 93 95 96 98 99 103 104 105 106 107 108 110 115 116 120 121 124 130 136 137 140 158 184 185 191 197 199 200 2033 Gate barrier Gutter & downspout, 6" alum Roof flashing, metal EIFS dormers, chimneys & c EIFS dormers, chimneys & c Louvers, garage intake, 4'x6 Louvers, garage exhaust fan Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Storefront entrances Balcony Soffits (Bldg 2) Balcony Soffits (Bldg 3) Awning, fabric (Building 3) Awning, frame (Building 3) Joint Sealants, exterior (Buil Flooring, interior carpet (Flr 2 Flooring, interior carpet (Flr 2 Flooring, porcelain tile (1st F Corridor wall coverings (Flr 2 Interior lighting, interiors (pa Elevator cab & door, passen Elevator, traction psngr, con Backflow preventer Interior lighting, garage (part Exterior lighting, balconies Exterior lighting, entrances Total Scheduled Replacements $ $4,600 $6,911 $5,800 $15,600 $3,500 $2,880 $2,400 $79,389 $113,616 $1,743 $22,003 $797 $797 $9,600 $16,215 $24,323 $2,700 $1,900 $25,400 $2,550 $6,503 $14,199 $4,536 $1,200 $7,900 $60,200 $3,900 $3,100 $4,992 $4,320 $453,573 Item 2034 179 Interior lighting, interiors (pa Total Scheduled Replacements $ $1,200 $1,200 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C10 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 25 TO 27 Item 12 26 31 198 2035 Concrete sidewalk (6%) Entry gate reurbishing Sink hole, backfill & cap Interior lighting, interiors (pa Total Scheduled Replacements $ $404 $1,200 $14,000 $1,850 $17,454 Item 19 33 34 65 128 133 139 156 2036 Quarry tile at entrances (par Concrete pile cap (partial) 3" water meter Garage door operators Mailboxes, aluminum gang b Mailboxes, aluminum gang b Mailboxes, aluminum gang b Unit heaters, ground floor (2 Total Scheduled Replacements $ $1,200 $35,000 $4,400 $1,900 $1,640 $1,640 $2,624 $1,680 $50,084 Item 1 2 4 7 22 89 155 177 2037 Asphalt pavement, seal coat Asphalt pavement, overlay Concrete curb & gutter (20% Concrete curb (20%) Light, site, pole mounted Garage door operators Exhaust fans, garage, motor Unit heaters, ground floor (2 Total Scheduled Replacements $ $7,464 $52,247 $4,699 $8,766 $560 $1,900 $1,540 $1,680 $78,855 Miller + Dodson Associates, Inc. Projected Annual Replacements - Page C11 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 PROJECTED REPLACEMENTS - YEARS 28 TO 30 Item 2038 113 Garage door operators 176 Exhaust fans, garage, motor 196 Unit heaters, ground floor (2 $ $3,800 $1,540 $2,520 Total Scheduled Replacements $7,860 Item 23 25 26 31 157 195 2039 Actuator, drop arm, entry ga Keypad entry system Entry gate reurbishing Sink hole, backfill & cap Interior lighting, garage (part Exhaust fans, garage, motor Total Scheduled Replacements $ $4,000 $750 $1,200 $14,000 $2,000 $3,080 Item 2040 90 Roofing, standing seam met 120 Awning, fabric (Building 3) 178 Interior lighting, garage (part $ $287,587 $2,700 $2,000 $25,030 Total Scheduled Replacements $292,287 Intentionally Left Blank Miller - Dodson Associates, Inc. Condition Assessment - Page D1 Pierpointe at Fremason Harbor December 8, 2010 CONDITION ASSESSMENT General Comments. Miller - Dodson Associates conducted a Reserve Study at Pierpointe in December 2010. Pierpointe is in fair condition for a condominium community constructed in 2000-2002. A review of the Replacement Reserve Inventory will show that we are anticipating most of the components achieving their normal economic lives. The following comments pertain to the larger, more significant components in the Replacement Reserve Inventory and to those items that are unique or deserving of attention because of their condition or the manner in which they have been treated in the Replacement Reserve Analysis or Inventory. SITE IMPROVEMENTS Asphalt Pavement. The site includes asphalt pavement for vehicle access and parking. In general, the asphalt pavement is in fair condition with multiple areas of defects. The Association maintains an inventory of 37,319 square feet of asphalt pavement, including the street and parking areas. Photo 1 - View of the asphalt parking and drive aisle Photo 2 - Asphalt is in fair condition but shows no evidence of having been seal coated The defects noted include the following: • Open Cracks. There are multiple locations where open cracks are allowing water to penetrate to the asphalt base and the bearing soils beneath the pavement. This water will erode the base accelerating the deterioration of the asphalt pavement. If the cracks have allowed the deterioration of the base materials and the bearing soil, the damaged areas should be removed and replaced. All other cracks should be cleaned and filled. • Alligatoring. There are multiple locations where the asphalt has developed a pattern of cracking known as alligatoring. Alligatoring is the result of an unstable base under the asphalt. Shifting in the base causes the asphalt to crack and shift, forming the cracks that resemble the skin of an alligator. Once these cracks extend through the asphalt, they will allow water to penetrate to the base, accelerating the rate of deterioration. The only solution is to remove the defective asphalt and compact the base before new asphalt is installed. • Potholes. There are a number of locations where potholes have formed as the result of the failure of the underlying base material or the surface material. Repair will require removal of the asphalt and base material, installation and compaction of new base material, and resurfacing with asphalt. • Depressions. There are areas where the asphalt surface is depressed due to deformation in the surface or underlying layers. These depressions may continue to grow with exposure to traffic. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D2 December 8, 2010 Water ponding was noted in several of these areas. Repair will require removal of the asphalt and base material, installation and compaction of new base material, and resurfacing with asphalt. Photo 3 - There are several large cracks that run parallel to the length of the waterfront Photo 4 - Some cracking is beginning to develop into alligatoring As a rule of thumb, asphalt should be overlayed when approximately five percent of the surface area has become cracked or has failed. The normal service life of asphalt pavement is typically 18 to 20 years. In order to maintain the condition of the pavement throughout the community and to ensure the longest life of the asphalt, we recommend a systematic and comprehensive maintenance program that includes: • Crack Sealing. All cracks should be sealed with an appropriate sealing compound to prevent water infiltration through the asphalt compound into the base. This repair should be done annually. This is an entirely different process from the seal coating discussed below. Crack sealing is normally considered a maintenance activity and is not funded from Reserves. Areas of extensive cracking or deterioration that cannot be made watertight by crack sealing should be cut out and patched. • Cleaning. Long-term exposure to oil or gas breaks down asphalt. Because this asphalt pavement is generally not used for long term parking, it is unlikely that frequent cleaning will be necessary. When necessary, spill areas should be cleaned, or if deterioration has penetrated the asphalt, patched. This is a maintenance activity, and we have assumed that it will not be funded from Reserves. • Seal Coating. The asphalt should be seal coated every three to five years. For this maintenance activity to be effective in extending the life of the asphalt, the crack sealing and cleaning of the asphalt as discussed above should be completed first. Pricing used in the study is based on a recent contract for a two-inch overlay and reflects the current local market. Asphalt Seal Coat. The asphalt pavement does not appear to have been seal coated within the past five years. As the asphalt surface oxidizes, some of the binders in the asphalt evaporate, resulting in a gray appearance to the asphalt. As a result of this process, the asphalt loses some of its flexibility, resulting in cracking and splitting. We recommend following a crack filling and recoating cycle of five years for asphalt surfaces. Concrete Flatwork. The concrete flatwork includes the building lead walks only. The Association maintains a very small inventory of concrete flatwork. The overall condition of the concrete flatwork is good. Miller - Dodson Associates, Inc. Condition Assessment - Page D3 Pierpointe at Fremason Harbor Photo 5 - Typical entrance walk is exposed aggregate concrete December 8, 2010 Photo 6 - A recent concrete walk repair The standards we used for recommending replacement are as follows: 1. 2. 3. 4. 5. Trip hazard, 0.5 inch height difference. Severe cracking. Severe spalling Uneven riser heights on steps. Steps with risers in excess of 8.25 inches. Because it is highly unlikely that all of the community’s concrete components will fail and require replacement in the period of the study, we have programmed funds for the replacement of 60% of the inventory and spread those funds over a 60 year timeframe to reflect the incremental nature of this work. This approach assumes a failure rate of 1% per year. Curb and Gutter. The Association maintains an inventory of 690 feet of concrete curb and gutter. All components have been well maintained and are in excellent condition. Any problems noted are in the form of minor cracks, spalling or settlement that can be repaired by continued periodic replacement of broken sections. Photo 7 - Typical curb & gutter Photo 8 - Typical concrete curb only Because it is highly unlikely that all of the community’s concrete curb and gutter sections will fail and require replacement in the period of the study, we have programmed funds for the replacement of 60 percent of the inventory and spread those funds over a 60-year timeframe to reflect the incremental nature of this work. This approach assumes a failure rate of one percent per year. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Photo 9 - Very few significant cracks were observed Condition Assessment - Page D4 December 8, 2010 Photo 10 - This section of C&G has not soil backfilled against and may be prone to damage from vehicles Storm Water System. We have included the catch basins and underground piping portions of the storm water system in the Reserve Analysis. Our estimates for the replacement costs for the storm water system are based on the partial drawings that were provided to us and our inspection of the visible components of the system. Photo 11 - Drop inlet for storm water Photo 12 - Typical curb inlet for storm water Curb Inlets. The storm water system includes a number of curb inlets that are designed to collect storm water from the drive aisles and parking areas and direct it into the storm water system. While curb inlets are long life items, soil movement can result in displacement of the structure. Openings between the inlets and the surrounding pavement and other surfaces can result in erosion and settlement of the pavement surrounding the curb inlet. This movement results in additional settlement and erosion. Uncorrected, the entire curb inlet will require replacement or rebuilding. Not all curb inlets will require rebuilding or replacement at the same time. Therefore we have included funding in the Reserve Analysis for repairs on a periodic basis. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D5 December 8, 2010 Water Mains. The Association is responsible for the replacement of the 3” main water meter and the water mains located under the roadway within the community. No engineering drawings were available to accurately determine distances, sizes of lines, and materials used for underground components of the system. Accordingly, we have provided an estimate of the approximate replacement cost based on our experience with other communities of similar size and on our inspection of the visible components while on site. Inspection of the underground lines and structures is beyond the scope of work of this study. Photo 13 - The water main valves for each building are located in the pavement Sanitary Sewer Mains. The Association is responsible for the replacement of the sanitary sewer mains located under the roadway within the community. No engineering drawings were available to accurately determine distances, sizes of lines, and materials used for underground components of the system. Accordingly, we have provided an estimate of the approximate replacement cost based on our experience with other communities of similar size and on our inspection of the visible components while on site. Inspection of the underground lines and structures is beyond the scope of work of this study. Irrigation System. There are no drawings available to accurately estimate the value of the system. The Manager reports that the Association is considering a widespread replacement of this system but no definite schedule or scope of work is available at this time. Accordingly, we have excluded an estimate of the approximate replacement cost. The estimate excludes replacement of the irrigation system controls also. Irrigation systems should be carefully monitored to eliminate repeated saturation and erosion of soils near foundations and retaining walls. Site Lighting. The Association is responsible for the operation of only two pole mounted lights between the buildings. The lighting system was not on at the time of our site visit. We understand that the lighting system is in good operating condition. Other site lighting around the perimeter of the property is within the City’s rights of way and is excluded. Photo 14 - The two pole mounted lights are in good condition Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D6 December 8, 2010 Bulkhead and Building Piles. The property was developed on a pre-existing pier along the Elizabeth River. This pier included steel sheet pile and concrete pile cap bulkheads for portions of the perimeter. This bulkhead and pile foundation system is subject to tidal energies and wind fetch. The original age and design of the system components are unknown and display a wide range of conditions and deterioration. The Association has contacted the City of Norfolk Engineer and has retained a professional structural engineering consultant to advise the Board on the need for maintenance, repairs and replacement of these components. Photo 15 - View of the piles under Building 2 Photo 16 - View of the deteriorated concrete pile cap and piles Photo 17 - View of sheet pile bulkhead and concrete cap We have included several budget allowance line items for funding in the Reserve Analysis for the periodic replacement of portions of this bulkhead and piling. Entrance Gates. The community is served by a single entrance with a pair of drop arm gates to control ingress and egress. The gates were not fully functioning at the time of the site visit and the Manager reports that some operation concerns are to be addressed in the near future but the exact maintenance or repair requirements are not known at this time. We have assumed the near term action is a maintenance activity and that the components will be able to reach their remaining economic life. Photo 18 - View of entry gates Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D7 December 8, 2010 BUILDING EXTERIORS General. The community is comprised of three midrise buildings with similar construction (expect as noted below). Buildings 1 and 2 are very similar with overall size and configuration being basically the same. Building 3 is a larger building and has some unique characteristics note found on Buildings 1 & 2 but the overall use of materials are in general the same. The inventory reflects the fact that the buildings are all of different ages and rather than use an average age for replacement of components the inventory is structure around each respective building and takes into account both differences in age and subtle differences in the use of materials. Photo 19 - Partial view of Building 1 Photo 20 - End elevation of Building 3 Photo 21 - Partial view of Building 2 The mid-rise nature of the buildings and the absence of ground access on the entire water side of the buildings require more difficult access to perform exterior envelope work which is reflected in some of the unit prices used in the inventory. The ability to combine work (i.e. joint sealants and brick tuckpointing) for performance at the same time allows for more efficient pricing of mobilization and equipment costs and should be considered when obtaining this work in the future. Asphalt Shingle Roofing. Buildings 1 and 2 have a shingle roof for the main roof areas. The asphalt shingle roofs are in fair condition for approximately 10 year old roofs on a very exposed site subject to winds. We have estimated the remaining useful life of the roofs based on the conditions seen at the site as well as the age of the roofs. We have assumed that when the roofs eventually will require replacement, the Buildings 1 and 2 roofs will be replaced with 30-year shingle roofs. We have assumed that the gutters and downspouts will be replaced when the roofs are replaced. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D8 December 8, 2010 Photo 22 - Asphalt shingle roof on Building 2 (some shingles have been replaced) Roofing unit prices reflect the height of the building and the exposed edge at the water front which requires additional worker safety requirements and will increase the time to perform the work as well as the challenge to prevent roof debris from falling into the waterway. Photo 23 - View of shingles on Building 1 (granule wear is noted on some areas) Metal Roofing. Building 3 has recently had its shingle roof replaced with a standing seam metal roof due to chronic leaks and failures of the original roof. The roof is new and understood to be in good condition with no obvious signs of disrepair or failure. However, we noted that numerous areas of the metal roof display damage from the roof nail heads of the previous shingle roof that were not thoroughly removed or driven flush prior to installation of the metal roof panels. This condition is not visible from the ground, but the deformation of the panels will shorten the life of the factory applied finish. A thorough inspection by the roof panel manufacturer should be performed to confirm if the condition will reduce or void the warranty due to installation. Photo 24 - Building 3 has just had a SSMR installed to replace the shingle roof Photo 25 - View of the SSMR on Building 3 Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D9 December 8, 2010 We have estimated the remaining useful life of the metal roof based on the conditions seen at the site as well as the age of the roof, and assume the issue described above does not void the warranty or reduce the life of the panels. We have assumed that when the Building 3 roof eventually will require replacement, the roof will be replaced with a similar metal roof. We have assumed that the gutters and downspouts will be replaced when the roof is replaced. We recommend the periodic inspection of the roof by a professional roofing consultant to detect early signs of failure. Photo 26 - Numerous dimples in the roofing are visible from the nails underneath Single-Ply Roofing. The single ply membrane roof used at the flat portion of each building roof is in fair condition. There is a relatively small area of membrane roofing on each building. The condition is fair. These roofs receive moderate traffic for the maintenance and repair of roof mounted equipment or repairs to the main roofs. Photo 27 - Membrane roofing is in fair overall condition Single-ply roofs can often fail at the seams in the panels and around vents and other roof details. Because the rubber oxidizes over time, the resealing of failed seams and joints has historically proven to be difficult, in that the oxidation inhibits the rebonding of the failed seams. Accordingly, we have included the replacement of the roof with a 20-year Photo 28 - Difficult access and the need membrane roof, and estimated the remaining life of the to move equipment impacts the existing roofs at 10 - 12 years. We have estimated the replacement costs remaining useful life of the roofs based on the conditions seen at the site as well as the age of the roofs. Because of the nature and age of the existing roof, we recommend the periodic inspection of the roof by a professional roofing consultant to detect early signs of failure. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Photo 29 - Sharp foreign objects expose the membrane to tears & punctures Condition Assessment - Page D10 December 8, 2010 Photo 30 - Sharp foreign objects expose the membrane to tears & punctures The defects we noted include the following: • Membrane Deterioration. The surface of the roof membrane is beginning to display early evidence of deterioration. This deterioration is a result of exposure to heat, the sun’s ultraviolet light, and pollutants in the air. It is an indication that the membrane is approaching the end of its service life. • Damaged Flashings. We noted several areas where the flashing or penetration flashings are damaged. Flashings are used to provide watertight junctions between the roofing membrane and walls, parapets, and equipment penetrations. They are a high stress point in roofs as they serve as transition points between materials with different rates of thermal expansion. We noted flashing problems that included improper installation, inadequate coverage, splits, separation, wrinkles, corrosion, loose fasteners, and open gaps. Failed flashings allow water direct access to the roof insulation, and therefore should be repaired as soon as possible. • Physical Damage. There are several areas where there is potentially physical damage to the roof’s surface from foreign objects remaining on the roof from repairs or maintenance to equipment and other roofing. Physical damage to a roof often results in a puncture or tear in the roof membrane, allowing water to enter. Typical causes include foot traffic, items dropped on the roof, vandalism, wind, and hail. Punctures, tears, and other damage must be repaired to prevent water entry into the roof's insulation. If the physical damage is limited to areas surrounding roofmounted equipment, roof walkway pads should be installed to prevent further damage in the future. • Ponded Water. A small percent of the roof area was covered with ponded water (frozen at the time of the site visit). Ponding occurs when the roof does not fully drain within 48 hours of a rainfall. It is an indication that the roof lacks adequate slope or roof drains, or that roof drains may not be properly placed. Ponded water can damage roofing materials by chemically altering their composition. The weight of the water can also cause physical damage to the roof by collapsing the roof's insulation. Check nearby roof drains to ensure their proper operation. Additional drains may be required to correct ponding. • Roof Penetrations. We noted some roof penetrations that are in questionable or obviously poor condition. Wherever mechanical equipment, vents, or piping penetrates the roof surface, the risk for developing leaks increases. Typical problems included loss of pitch pocket sealant, damaged flashings, traffic wear, physical damage to the roof surface, and erosion of the roof surface. Any opening or damage around roof penetrations must be repaired as quickly as possible to limit damage. Consider installing roof walkway pads for rooftop-mounted equipment to limit damage to the roof's membrane. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor • Condition Assessment - Page D11 December 8, 2010 Debris. There is a significant amount of debris on the roof, including, maintenance materials, sheet metal and piping with sharp edges. Leaves and trash can easily block roof drains, causing water to pond on the roof surface. Other debris poses a puncture risk to the roof’s membrane. We understand that roof top equipment was being replaced at the time of the visit on some buildings and assume some of the debris would be removed when the work was completed, however, this needs to be verified by the Owner to ensure no remaining foreign materials remain that would damage the roof. Brickwork and Lintels. The brickwork on the buildings is in good overall condition. Brick is usually considered to be a life of structure item and therefore excluded from reserve funding. Because weather and other conditions result in the slow deterioration of the mortar in the brick joints, we have included funding in the Reserve Analysis for tuckpointing. Photo 31 - Pointing and joint sealants should be performed at the same time Photo 32 - Corroded lintels and broken brick Tuckpointing is the process of raking and cutting out damaged sections of mortar and replacing them with new mortar. When mortar joints become damaged, they allow water to gain access to the brick joints. Repeated freeze-thaw cycles gradually increase the damage to the mortar joints, allowing even more moisture into the brick joints. If allowed to progress sufficiently, the brick surfaces can spall or entire bricks can be loosened. Periodic tuckpointing limits the damage done by moisture penetration, maximizing the life of both the mortar and the bricks. For the Reserve Analysis, we have assumed that five percent of the brick will require tuckpointing every ten years once the brickwork is approximately 30 to 35 years old. Some cracked and broken brick was observed and is believed to be attributed to the infiltration of water at doors or windows or at the intersection of balconies with exterior walls, or by structural movement of the building that is not accommodated by appropriate sized and spaced expansion and control joints. These conditions should be examined more thoroughly by a professional engineer or architect that specializes in forensic analysis and investigation for a properly document assessment, conclusions and recommendations. The exterior door and window openings are constructed with galvanized steel lintels, but the garage door openings are not. These lintels are displaying signs of corrosion and are expected to be corroding within the wall assembly overtime and therefore will require replacement as needed in the future. Exterior Joint Sealants. These building have extensive exterior joint sealants. These sealants provide a vital role in maintaining the envelope in a water tight condition. Exterior sealants deteriorate within 7 10 years depending on the conditions present, the quality of the sealant used and the quality of workmanship to install them. Sealants need to be thoroughly replaced when they begin to show deterioration and not after they have failed. Miller - Dodson Associates, Inc. Condition Assessment - Page D12 Pierpointe at Fremason Harbor December 8, 2010 Shrinkage, crazing, loss of cross section, separation from adjacent surfaces and substrates are all indications that the sealants are near the end of their economic life. Exterior Insulation Finish System (EIFS). The buildings use a limited quantity of EIFS as a cladding for the roof level chimney and dormer elements on all three buildings and the cupola structures on Buildings 1 and 3. Photo 33 - View of EIFS clad false chimney Photo 34 - EIFS is used on the Building 1 and 3 cupolas Exterior Wall Insulation and Finish System (EIFS), often incorrectly called synthetic stucco, is a lightweight, synthetic wall cladding system constructed from plastic foam insulation and several thin synthetic coatings. There are two types of EIFS systems. One type, called “barrier”, assumes that the surface is waterproof and therefore has no provision for releasing wind-driven water that permeates the surface. The second type, called “watermanaged”, allows for water penetration by implementing a drainage system within the wall that drains any water that enters or condenses behind the surface coat. The industry is no longer installing the barrier systems because of a history of failures, and instead installs the water-managed system. Photo 35 - EIFS is used for sidewalls of the dormers The EIFS was visually inspected. No major defects were noted. EIFS systems have historically experienced problems resulting from faulty installation and inappropriate design details that trap moisture behind the weather barrier. These conditions have caused leaks and structural damage at other locations. Improper detailing can also cause surface cracking. These defects can only be found by close inspection from scaffolding and by removal of small sections of the material to test if moisture is present. This activity is beyond the scope of this study. We recommend periodic inspection of the building by a professional certified and equipped to conduct this type of inspection. The property has a water managed EIFS system. Even though the water managed system provides a higher level of protection than the barrier system, it must be properly maintained in order to prevent water penetration and the resulting damage. Recommended maintenance practices include the following: • All EIFS surfaces should be inspected once every year for physical damage. • Once each year, inspect all openings around wall penetrations, including those around windows, doors, electrical outlets, and any piping for proper sealing. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor • Condition Assessment - Page D13 December 8, 2010 Once every ten years, apply a silicone based color coat to counter the slow deterioration of the EFIS surface caused by ultraviolet light. We recommend that the Purchaser contact EIMA (EIFS industry manufacturers association) to determine inspection requirements and establish an annual inspection program. EIMA may be reached at the following: EIMA 3000 Corporate Center Drive, Suite 270 Morrow, GA 30260 Tel: 1-800-294-3462 or 1-770-968-7945 www.eifsfats.com Alternatively, the Purchaser may contact the manufacturer of Drivit or similar products to gain a better understanding of the EIFS system and standard inspection and maintenance procedures. Trim and Soffits. The roof eaves are provided with a solid PVC trim material and perforated vinyl soffits. These materials are typically capable of providing a 30+year economic life. However, site observations indicate that the fasteners used on some location do no appear to be stainless steel and are corroding. It is believed the fasteners will fail before the trim and soffit materials are depleted of economic life. As the buildings age these components will begin to fail during high wind events and will require partial replacement which will be very expensive due to the difficult access and equipment required to perform the work. Photo 36 - Typical fascia trim Photo 37 - Trim is fastened with ferrous nails that are corroding Exterior Vents and Louvers. The exterior vent penetrations through the brick walls are typically in fair to good overall condition for the age of the property. These vents are not considered to be suitable for the high wind exposure for the location of the community. Additionally, it was reported by the Manager that many of the vents have been determined to have improper or no positive connection between the duct and the vent at the exterior wall cavity leading to occurrences of moisture and condensation within the wall assembly. Metal louvers are provided at the garage level for exhaust fans and air intakes. Photo 38 - Typical garage louver for air intakes Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Photo 39 - Some roof level vents are in poor condition Condition Assessment - Page D14 December 8, 2010 Photo 40 - Through wall vents are reported to lack proper installation at ducts in the wall assembly Metal Exterior Doors. The exterior doors are of metal construction. These doors are approximately 8-10 years old depending on the building and are in fair to poor condition. Metal doors and their frames are prone to damage from corrosion. To limit damage, doors and frames should be painted every five to six years. One of the doors has begun to corrode at the bottom and is planned for replacement in the near future. The Association should consider replacement doors and frames that are solid fiberglass extrusions to avoid the corrosions issues in the future. The Manager has indicated that fiberglass door is being provided for replacement. Photo 41 - Heavily corroded metal doors are to be replaced Storefront Entrances. The main entrance to each building is provided with a vestibule that includes a storefront entry door system. These doors are typically in good condition and are partially protected from either a concrete balcony above (Buildings 1 and 2) or an awning (Building 3). These are expected to meet their full economic life potential of 35 years +/-. The entrance access controls are in good overall condition. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Photo 42 - View of Building 3 entrance doors and awnings Condition Assessment - Page D15 December 8, 2010 Photo 43 - View of typical access control panel/intercom Sliding Door and Window Sill Pans. The condo docs indicate that the sill pans and flashings for exterior doors and windows of units is the Association’s responsibility. The sill pans and flashings have recently been suspected of being sources of moisture infiltration and are the subject of a pending investigation to determine the extent of the condition and the need for potential replacement. Base upon our own visual observations on site, we have identified significant cracking of brick joints were sill pans and through wall flashings are believed to be installed. We have included the cost of partial sill pan and flashing replacement in the inventory and recommended that the outcome of the investigation (by others) be used to establish a replacement program for these critical wall assembly features. Photo 44 - Cracks beneath the threshold of sliding doors are suspected to be related to improperly installed throughwall flashing and sill pans The cost of the work shall require scaffold and lift and should be coordinated with other similar work (joint sealants and brick repointing) as appropriate to save costs if possible. The cost of the investigation by a professional design firm with forensic architectural/engineering experience is excluded. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D16 December 8, 2010 Balcony Columns, Decking and Soffits. Balcony columns were reported by the Manager to have required partial replacement (2 were replaced and 14 repaired) recently, due to moisture related deterioration. There have also been concerns raised as to the effect that ledger installation and sliding door sill flashing is having on the structure of the balconies. The balconies will require both decking and soffit replacements when the structure is replaced. Additionally, interval replacement of the decking will be more frequent that the structure under normal circumstances. Balcony Railings. The balcony railings are in fair to good condition. The railings typically will require full replacement in the future to coincide with replacement of the deck/balcony structures. Interim refurbishing is also anticipated to address corroded fasteners, and coating failures to ensure the railings can meet their full economic life potential. Photo 45 - View of typical balconies Photo 46 - Building 3 balconies Photo 47 - Typical balconette railings BUILDING INTERIORS Parking Garage. The Association is responsible for the operation of the concrete ground floor parking garage. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Photo 48 - Typical garage overhead door Condition Assessment - Page D17 December 8, 2010 Photo 49 - Typical garage interior view Listed below are the major components of the parking garage: • Overhead Doors. The buildings have a total of eight electrically-operated overhead doors. All doors are in good operating condition. The doors display minor deterioration from normal wear and tear and weather deterioration. • Lighting System. The parking garage uses ceiling mounted T8 fluorescent HID light fixtures for lighting. The light output from the existing system is adequate for the area. Ballasts are wearing out and the Association is replacing lights as needed. • Garage Ventilation Fans. Each parking garage has supply and exhaust fans. We have assumed a service life of 20 years for these fans. The exhaust fans are operated by the CO2 detection system and the air intakes are thermostatically controlled. • Garage Heaters. There are small ceiling mounted heating units that serve the parking garage areas. The heaters were operating at the time of the site visit. The heaters are in good operating condition and only provide sufficient heat to prevent freezing of plumbing and fire sprinkler piping within the garage spaces. Photo 50 - Thermostatically controlled air intake Photo 51 - Typical garage unit heater Garage Concrete Slabs. The garage area concrete slabs are excluded as a long lived component. However, it was observed that the slabs display several large cracks. Given the reported concerns with the property bulkhead, building pile foundations and the occurrence of sink holes within the property limits, the potential exists that the garage slabs may experience failures requiring partial replacement in Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D18 December 8, 2010 the future. This cannot be predicted and would require the investigation and opinion of a professional structural engineer to determine appropriate replacement and costs at such time as these failures occur. Floor Finishes. The common area floor finishes vary from building to building an even from floor to floor in certain buildings. The quantities and conditions are based on the site visit and include the carpeting, porcelain tile and stone tile flooring in the main entrance lobbies and in each corridor. Flooring normal life and remaining life are based on the conditions and the level of usage for the property, and replacement values are based on replacement in kind with comparable materials and quality. Photo 53 - Ceramic tile flooring at corridor Photo 52 - Marble tile flooring in Building 3 Photo 54 - Porcelain tile flooring at first floor lobby Photo 55 - Corridor carpeting Wall Coverings. The corridors in various buildings have different finishes. No wall coverings are used in the corridors of Building 1 and different types of wall covering are used at different floors in Buildings 2 and 3. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Photo 56 - Wall coverings vary throughout each building and corridor Condition Assessment - Page D19 December 8, 2010 Photo 57 - Typical view of lobby furnishings & décor Décor and Furnishings. The buildings common areas are decorated and furnished with a multitude of seating, tables and accessories to include lamps, mirrors and oriental rugs. Décor is typically replaced more frequently than the normal economic life potential due to changes in taste. Therefore we have programmed a modest amount for the replacement of these items based on the quality and quantity present. Mailboxes. Each building is provided with anodized aluminum cluster mailboxes in the main lobby. These are all in good condition and should provide a normal life of 35-40 years. Photo 58 - Typical mail boxes PLUMBING, MECHANICAL & ELECTRICAL Domestic Water Booster Pumps and Pressure Tanks. Each building is provided with a backflow preventer. The common water for each building is designed to maintain adequate water pressure in the buildings by use of a pair booster pumps with their controller and a single pressure tank per building. When it comes time to replace or upgrade the system, we recommend that the Association consider installing a booster pump system that uses variable frequency drives to control the operating speed of the Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D20 December 8, 2010 pumps and match their output to the needs of the building. These systems provide better pressure control while reducing energy requirements. Photo 59 - Typical backflow preventer for domestic water Photo 60 - Typical pressure tank, booster pumps and controller for domestic water Common Domestic Water Piping. As mid-rise buildings, these facilities are designed with common plumbing risers for domestic water and sanitary sewer lines. Copper water supply piping is believed to have been used throughout the buildings. As a result of changes in water chemistry that have been brought on by federal clean water legislation, copper piping can develop pin hole leaks which will lead to high maintenance costs and a significantly shorter normal service life. For further information about the problem and research that is being conducted, go to www.wssc.dst.md.us, click on the dropdown box labeled “Customers”, and click on the listing for “Pin Hole Leaks”. As a result of this problem, the piping will have to be replaced at some point in time. As a less expensive alternative to the extremely costly work of re-piping a building, systems have been developed to clean and to line the interior surfaces of water lines with an epoxy coating that is warranted to last 25 years. This alternative is still very expensive (approximately $5,000 per unit), but it is still significantly less expensive than re-piping. For additional information, go to www.fixmypipes.com. Assuming that the chemical deterioration from the water content is inevitable, we have included funding for this work in the reserve study. In estimating the amount to be reserved, we have assumed that the cost of lines serving a single unit will be paid by unit owners and that the cost of funding risers will be paid from reserves. Please note that the timeframe for repiping a building can vary widely, and the estimation of the remaining economic life is highly speculative. Given the age of these buildings, the Association should be aware of the various technologies available for pipe replacement and pipe lining. Please, see the following web sites for general information on this topic: www.curaflo.com/index.cfm?fuseaction=pages.showpage&pageid=60 and www.fixmypipes.com. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D21 December 8, 2010 Heat Pumps. There are single heat pumps that serve each building with an air handler on the ground floor to support the ground floor lobby and each floor’s corridors. We have included two items in the Reserve Analysis for the heat pumps; the heat pump system and the system’s compressor. For the system, we have assumed a service life of 30 years. For the system’s compressor, we have assumed a service life of 15 years. Photo 61 - Typical heat pump air handler Elevators. Building one is provided with a single hydraulic passenger elevator with four stops. Both Buildings 2 and 3 are provided with a single electric traction passenger elevator with four stops. The elevators were all found to be in good operating condition and equipment displayed current inspection and service call data. The estimated cost of replacing the major components of the building elevators has been developed utilizing R.S. Means Construction Cost Data. These costs are included to reflect the obsolescence that occurs with elevator systems. Even though the systems may be functioning well at this time, parts for most mechanical control systems are becoming increasingly hard to find. Parts availability becomes a major consideration that forces a replacement decision. When this work is ultimately accomplished, the elevators will have to be brought into compliance with the latest safety code requirements. This work typically entails upgrading door operating mechanisms, replacing elevator call systems, and installation of emergency phones. A prudent amount has been included in anticipation of these problems. Photo 62 - View of elevator cab finishes Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D22 December 8, 2010 Photo 63 - Elevator equipment is in good condition and under service contract Photo 64 - Typical elevator doors in corridor Electrical Switchgear. The electrical switchgear includes the secondary distribution equipment, disconnects, relays, fuses, and circuit breakers for the facility. The electrical switchgear dates to the original construction of the building. Electrical switchgear has a rated service life of 50 years or more. Electrical switchgear requires ongoing maintenance for proper operation and reliability. The overall condition of the switchgear is good. As the switchgear continues to age, obtaining replacement parts can be expected to become more difficult. When parts no longer are available or when the condition of the switchgear deteriorates sufficiently, the Association will have to replace or upgrade the existing equipment. Therefore we have included partial funding in the Reserve Analysis for future upgrading the equipment. Photo 65 - Electrical equipment is in good condition Photo 66 - Generator is in good condition Emergency Generator. The building is served by a backup generator that is located outside adjacent to Building 1. The generator is approximately 10 years old and is in good condition. The Manger could not confirm the size and the cabinet on the generator was locked so the data could not be obtained from the equipment itself. We have assumed a size and capacity for the generator based on the number of buildings being served. The generator supplies power to the building’s emergency lighting, stairwell Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D23 December 8, 2010 lighting, heating system, HVAC system pumps, elevator elevators, sump pumps and the fire pump. The estimated cost of replacing the generator has been developed utilizing R.S. Means Construction Cost Data. Interior Lighting. Common area lighting in addition to the garage lighting mentioned above includes the wall sconces used for general lighting in the corridors as well as lighting in stairways and miscellaneous rooms (i.e. storage, mechanical and electrical closets, fire and plumbing rooms and trash rooms). Photo 67 - Decorative wall sconces Photo 68 - Styles vary Lighting is generally replaced as needed. However, the use of decorative scones will result in surplus fixtures being used up and the availability of replacement lights to match existing will be obsolete. When this occurs the entire lighting on a floor or in a building is typically replaced to ensure consistent aesthetics throughout. Exterior Lighting. The buildings include exterior lights at each balcony as well as large decorative lights at the ground floor adjacent to garage entrances. These large fixtures are not identical on each building. For aesthetic reasons the replacement of fixtures should be performed all at one time once the availability of parts is not longer reliable. Photo 69 - Exterior lights vary in style and condition Fire Suppression. The wet pipe sprinkler fire suppression for all three buildings is supplied by a main fire pump within Building 1. The backflow preventer, pump, jockey pump, pump controllers, valves and piping are all in good condition and bear current inspection tickets. Miller - Dodson Associates, Inc. Pierpointe at Fremason Harbor Condition Assessment - Page D24 December 8, 2010 Photo 71 - Fire pump controller Photo 70 - View of fire pump Fire Alarm & Detection Systems. Each building is provided with a fire alarm control panel and devices for detection and alarm including strobes and audible alarms, illuminated exit signage and egress lighting. These components are all in good condition and typically will only be replaced as need until the entire system becomes obsolete from changes in the technology and the applicable codes. Photo 72 - Typical fire alarm indicator panel Photo 73 - Typical exit signage and alarm strobe Photo 74 - Typical egress light Miller - Dodson Associates, Inc. Condition Assessment - Page D25 Pierpointe at Fremason Harbor December 8, 2010 This Condition Assessment is based upon our visual survey of the property. The sole purpose of the visual survey was an evaluation of the common elements of the property to ascertain the remaining useful life and the replacement costs of these common elements. Our evaluation assumed that all components met building code requirements in force at the time of construction. Our visual survey was conducted with care by experienced persons, but no warranty or guarantee is expressed or implied. End of Condition Assessment Intentionally Left Blank Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-1 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 CASH FLOW METHOD ACCOUNTING SUMMARY This Pierpointe at Freemason Harbour - Cash Flow Method Accounting Summary is an attachment to the Pierpointe at Freemason Harbour - Replacement Reserve Study dated December 8, 2010 and is for use by accounting and reserve professionals experienced in Association funding and accounting principles. This Summary consists of four reports, the 2011, 2012, and 2013 Cash Flow Method Category Funding Reports (3) and a Three-Year Replacement Funding Report. z CASH FLOW METHOD CATEGORY FUNDING REPORT, 2011, 2012, and 2013. Each of the 202 Projected Replacements listed in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of 13 categories. The following information is summarized by category in each report: Normal Economic Life and Remaining Economic Life of the Projected Replacements. Cost of all Scheduled Replacements in each category. Replacement Reserves on Deposit allocated to the category at the beginning and end of the report period. Cost of Projected Replacements in the report period. Recommended Replacement Reserve Funding allocated to the category during the report period as calculated by the Cash Flow Method. z THREE-YEAR REPLACEMENT FUNDING REPORT. This report details the allocation of the $444,318 Beginning Balance (at the start of the Study Year) and the $464,312 of additional Replacement Reserve Funding in 2011 through 2013 (as calculated in the Replacement Reserve Analysis) to each of the 202 Projected Replacements listed in the Replacement Reserve Inventory. These allocations have been made using Chronological Allocation, a method developed by Miller Dodson Associates, Inc., and discussed below. The calculated data includes: Identification and estimated cost of each Projected Replacement schedule in years 2011 through 2013. Allocation of the $444,318 Beginning Balance to the Projected Replacements by Chronological Allocation. Allocation of the $464,312 of additional Replacement Reserve Funding recommended in the Replacement Reserve Analysis in years 2011 through 2013, by Chronological Allocation. z CHRONOLOGICAL ALLOCATION. Chronological Allocation assigns Replacement Reserves to Projected Replacements on a "first come, first serve" basis in keeping with the basic philosophy of the Cash Flow Method. The Chronological Allocation methodology is outlined below. The first step is the allocation of the $444,318 Beginning Balance to the Projected Replacements in the Study Year. Remaining unallocated funds are next allocated to the Projected Replacements in subsequent years in chronological order until the total of Projected Replacements in the next year is greater than the unallocated funds. Projected Replacements in this year are partially funded with each replacement receiving percentage funding. The percentage of funding is calculated by dividing the unallocated funds by the total of Projected Replacements in the partially funded year. At Pierpointe at Freemason Harbour the Beginning Balance funds 55.5% of Scheduled Replacements in the Study Year through 2016 and provides partial funding(1%) of replacements scheduled in 2017. The next step is the allocation of the $154,771 of 2011 Cash Flow Method Reserve Funding calculated in the Replacement Reserve Analysis. These funds are first allocated to fund the partially funded" Projected Replacements and then to subsequent years in chronological order as outlined above. At Pierpointe at Freemason Harbour the Beginning Balance and the 2011 Replacement Reserve Funding, funds replacements through 2017 and partial funds (36.4%) replacements in 2018. Allocations of the 2012 and 2013 Reserve Funding are done using the same methodology. The Three-Year Replacement Funding Report details component by component allocations made by Chronological Allocation. Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-2 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 2011 - CASH FLOW METHOD CATEGORY FUNDING REPORT Each of the 202 Projected Replacements included in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of the 13 categories listed in TABLE CF-1 below. This calculated data is a summary of data provided in the Three-Year Replacement Funding Report and Replacement Reserve Inventory. The accuracy of this data is dependent upon many factors including the following critical financial data: A Beginning Balance of $444,318 as of the first day of the Study Year, January 1, 2011. Total reserve funding (including the Beginning Balance) of $599,089 in the Study Year. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2011 being accomplished in 2011 at a cost of $31,295. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates to arrange for an update of the Replacement Reserve Study. 2011 - CASH FLOW METHOD CATEGORY FUNDING - TABLE CF-1 CATEGORY NORMAL ECONOMIC LIFE REMAINING ECONOMIC LIFE ESTIMATED REPLACEMENT COST 2011 BEGINNING BALANCE 2011 RESERVE FUNDING SITE COMPONENT 6 to 60 years 2 to 60 years $106,544 $19,065 $8,880 SITE COMPONENT (cont.) 4 to 40 years 0 to 31 years $746,500 $99,245 $58,665 2011 PROJECTED REPLACEMENTS 2011 END OF YEAR BALANCE $1,200 $159,110 $12,395 $107,709 $27,944 SITE COMPONENT (cont.) 10 to 35 years 10 to 25 years $27,949 $1,381 $1,795 BUILDING EXTERIOR (Building 1) 10 to 30 years 0 to 30 years $377,341 $62,025 $33,290 $3,176 BUILDING EXTERIOR (Building 2) 10 to 30 years 1 to 30 years $363,983 $49,642 $25,995 BUILDING EXTERIOR (Building 3) 10 to 30 years 2 to 30 years $695,901 $47,504 $37,212 BUILDING EXTERIOR (Miscellaneous) 7 to 30 years 0 to 12 years $157,686 $34,159 $33,583 BUILDING INTERIOR (Building 1) 3 to 42 years 0 to 25 years $27,439 $4,261 $2,960 BUILDING INTERIOR (Building 2) 3 to 42 years 0 to 25 years $38,926 $5,443 $2,973 $8,416 BUILDING INTERIOR (Building 3) 3 to 42 years 0 to 32 years $57,831 $6,449 $3,901 $10,350 BUILDING SYSTEM (Building 1) 8 to 40 years 1 to 30 years $328,665 $37,383 $17,461 $54,844 BUILDING SYSTEM (Building 2) 8 to 40 years 2 to 31 years $316,765 $36,493 $18,746 $55,239 BUILDING SYSTEM (Building 3) 8 to 40 years 3 to 32 years $441,857 $41,269 $22,097 $63,366 $75,637 $84,716 $17,700 $85,442 $7,220 Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-3 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 2012 - CASH FLOW METHOD CATEGORY FUNDING REPORT Each of the 202 Projected Replacements included in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of the 13 categories listed in TABLE CF-2 below. This calculated data is a summary of data provided in the Three-Year Replacement Funding Report and Replacement Reserve Inventory. The accuracy of this data is dependent upon many factors including the following critical financial data: Replacement Reserves on Deposit totaling $567,794 on January 1, 2012. Total reserve funding (including the Beginning Balance) of $753,860 in 2011 through 2012. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2012 being accomplished in 2012 at a cost of $103,845. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates to arrange for an update of the Replacement Reserve Study. 2012 - CASH FLOW METHOD CATEGORY FUNDING - TABLE CF-2 CATEGORY NORMAL ECONOMIC LIFE REMAINING ECONOMIC LIFE ESTIMATED REPLACEMENT COST 2012 BEGINNING BALANCE 2012 RESERVE FUNDING SITE COMPONENT 6 to 60 years 1 to 59 years $106,544 $27,944 $8,880 SITE COMPONENT (cont.) 4 to 40 years 0 to 30 years $746,500 $159,110 $58,203 2012 PROJECTED REPLACEMENTS 2012 END OF YEAR BALANCE $62,850 $280,162 $36,824 SITE COMPONENT (cont.) 10 to 35 years 9 to 24 years $27,949 $3,176 $1,795 $4,971 BUILDING EXTERIOR (Building 1) 10 to 30 years 4 to 29 years $377,341 $107,709 $26,171 $133,881 BUILDING EXTERIOR (Building 2) 10 to 30 years 0 to 29 years $363,983 $75,637 $25,995 BUILDING EXTERIOR (Building 3) 10 to 30 years 1 to 29 years $695,901 $84,716 $37,212 $12,395 $114,028 $121,928 BUILDING EXTERIOR (Miscellaneous) 7 to 30 years 0 to 11 years $157,686 $85,442 $24,107 $20,400 BUILDING INTERIOR (Building 1) 3 to 42 years 0 to 24 years $27,439 $7,220 $2,960 $5,100 $129,949 BUILDING INTERIOR (Building 2) 3 to 42 years 1 to 24 years $38,926 $8,416 $2,973 BUILDING INTERIOR (Building 3) 3 to 42 years 1 to 31 years $57,831 $10,350 $3,901 BUILDING SYSTEM (Building 1) 8 to 40 years 0 to 29 years $328,665 $54,844 $17,461 BUILDING SYSTEM (Building 2) 8 to 40 years 1 to 30 years $316,765 $55,239 $18,746 $73,984 BUILDING SYSTEM (Building 3) 8 to 40 years 2 to 31 years $441,857 $63,366 $22,097 $85,463 $15,280 $11,388 $14,251 $3,100 $75,405 Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-4 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 2013 - CASH FLOW METHOD CATEGORY FUNDING REPORT Each of the 202 Projected Replacements included in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of the 13 categories listed in TABLE CF-3 below. This calculated data is a summary of data provided in the Three-Year Replacement Funding Report and Replacement Reserve Inventory. The accuracy of this data is dependent upon many factors including the following critical financial data: Replacement Reserves on Deposit totaling $618,720 on January 1, 2013. Total Replacement Reserve funding (including the Beginning Balance) of $908,630 in 2011 to 2013. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2013 being accomplished in 2013 at a cost of $64,611. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates to arrange for an update of the Replacement Reserve Study. 2013 - CASH FLOW METHOD CATEGORY FUNDING - TABLE CF-3 NORMAL ECONOMIC LIFE REMAINING ECONOMIC LIFE ESTIMATED REPLACEMENT COST SITE COMPONENT 6 to 60 years 0 to 58 years $106,544 SITE COMPONENT (cont.) 4 to 40 years 0 to 29 years $746,500 CATEGORY 2013 BEGINNING BALANCE 2013 RESERVE FUNDING 2013 PROJECTED REPLACEMENTS 2013 END OF YEAR BALANCE $36,824 $8,880 $7,464 $53,167 $280,162 $42,229 $560 $322,951 SITE COMPONENT (cont.) 10 to 35 years 8 to 23 years $27,949 $4,971 $1,795 $6,766 BUILDING EXTERIOR (Building 1) 10 to 30 years 3 to 28 years $377,341 $133,881 $26,171 $160,052 BUILDING EXTERIOR (Building 2) 10 to 30 years 4 to 29 years $363,983 $114,028 $22,539 BUILDING EXTERIOR (Building 3) 10 to 30 years 0 to 28 years $695,901 $121,928 $37,212 $17,495 $176,635 BUILDING EXTERIOR (Miscellaneous) 7 to 30 years 0 to 10 years $157,686 $129,949 $18,995 $25,400 $174,344 BUILDING INTERIOR (Building 1) 3 to 42 years 8 to 23 years $27,439 $15,280 $1,663 BUILDING INTERIOR (Building 2) 3 to 42 years 0 to 23 years $38,926 $11,388 $2,973 $2,550 $16,911 BUILDING INTERIOR (Building 3) 3 to 42 years 0 to 30 years $57,831 $14,251 $3,901 $6,503 $24,654 $136,566 $16,943 BUILDING SYSTEM (Building 1) 8 to 40 years 0 to 28 years $328,665 $75,405 $16,608 $1,540 $93,553 BUILDING SYSTEM (Building 2) 8 to 40 years 0 to 29 years $316,765 $73,984 $18,746 $3,100 $95,830 BUILDING SYSTEM (Building 3) 8 to 40 years 1 to 30 years $441,857 $85,463 $22,097 $107,560 Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-5 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CASH FLOW METHOD - THREE-YEAR REPLACEMENT FUNDING REPORT TABLE 4 below details the allocation of the $444,318 Beginning Balance, as reported by the Association and the $464,312 of Replacement Reserve Funding calculated by the Cash Flow Method in 2011 to 2013, to the 202 Projected Replacements listed in the Replacement Reserve Inventory. These allocations have been made by Chronological Allocation, a method developed by Miller Dodson Associates, Inc., and outlined on Page CF-1. The accuracy of the allocations is dependent upon many factors including the following critical financial data: Replacement Reserves on Deposit totaling $444,318 on January 1, 2011. Replacement Reserves on Deposit totaling $567,794 on January 1, 2012. Replacement Reserves on Deposit totaling $618,720 on January 1, 2013. Total Replacement Reserve funding (including the Beginning Balance) of $908,630 in 2011 to 2013. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2011 to 2013 being accomplished as scheduled in the Replacement Reserve Inventory at a cost of $199,751. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates, Inc., to arrange for an update of the Replacement Reserve Study. CASH FLOW METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE CF-4 Item # Description of Projected Replacement Estimated Replacement Costs Allocation of Beginning Balance 7,464 52,247 4,699 4,699 4,699 8,766 8,766 8,766 404 404 404 404 404 404 404 404 404 404 1,200 1,200 7,464 2011 2011 Reserve Projected Funding Replacements 2011 End of Year Balance 2012 2012 Reserve Projected Funding Replacements 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 2013 End of Year Balance SITE COMPONENT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Asphalt pavement, seal coat Asphalt pavement, overlay Concrete curb & gutter (20%) Concrete curb & gutter (20%) Concrete curb & gutter (20%) Concrete curb (20%) Concrete curb (20%) Concrete curb (20%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Quarry tile at entrances (partial) Quarry tile at entrances (partial) 224 7,464 180 1,704 11,931 1,073 9,168 11,931 1,073 5,759 40,315 3,626 2,002 2,002 6,764 (7,464) 7,464 52,247 4,699 8,766 404 404 404 1,200 1,200 1,200 1,200 560 4,000 2,553 750 2,400 20,250 560 4,000 4,600 750 1,200 20,250 560 4,000 4,600 750 1,474 926 4,000 4,600 750 2,400 17,197 10,803 28,000 12,061 12,061 1,303 1,037 1,241 930 1,303 1,037 1,241 930 SITE COMPONENT (cont.) 21 22 23 24 25 26 27 28 29 30 31 32 33 Light pole, site Light, site, pole mounted Actuator, drop arm, entry gate Gate barrier Keypad entry system Entry gate reurbishing Bulkhead, sheetpile (Bldg 1), refurbish Bulkhead, sheetpile (Bldg 1), replace Bulkhead, (Bldg 2 & 3), refurbish Bulkhead, (Bldg 2 & 3), replace Sink hole, backfill & cap Concrete pile, refurbishing Concrete pile cap (partial) 2,520 560 4,000 4,600 750 1,200 20,250 83,700 42,600 207,320 14,000 330,000 35,000 2,047 (1,200) 42,600 42,600 14,000 14,000 274 (560) (20,250) (42,600) 3,197 SITE COMPONENT (cont.) 34 35 36 37 38 39 3" water meter Domestic water main (10%) Sanitary main (10%) Domestic water lateral (partial) Sanitary lateral (partial) Storm water, curb inlet (25%) 4,400 3,780 3,010 3,600 2,700 4,750 Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-6 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CASH FLOW METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE 4 cont'd Item # 40 41 Description of Projected Replacement Storm water, drop inlet (50%) Storm water, 18" RCP (25%) Estimated Replacement Costs Allocation of Beginning Balance 2011 2011 Reserve Projected Funding Replacements 2011 End of Year Balance 2012 2012 Reserve Projected Funding Replacements 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 2013 End of Year Balance 4,100 1,609 BUILDING EXTERIOR (Building 1) 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Roofing, shingle asphalt/fiberglass Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing, metal PVC Fascia Trim EIFS dormers, chimneys & cupola, rep EIFS dormers, chimneys & cupola, refu Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators 70,042 14,000 4,199 3,900 18,000 15,600 3,500 5,621 1,440 1,200 19,451 4,000 5,585 64,900 92,880 1,636 20,655 531 531 16,000 4,800 3,310 3,660 1,900 3,500 (3,500) 5,585 64,900 24,137 4,824 24,137 4,824 6,203 6,203 1,206 1,937 1,206 1,937 6,703 1,378 6,703 1,378 (5,585) 64,900 64,900 64,900 1,636 1,636 1,636 1,636 531 531 531 531 1,900 1,900 1,900 1,900 3,500 3,500 (3,500) (5,585) 64,900 64,900 3,310 (3,310) BUILDING EXTERIOR (Building 2) 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 Roofing, shingle asphalt/fiberglass Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing , metal PVC Fascia EIFS dormers & chimneys, replace EIFS dormers & chimneys, refurbish Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators 56,983 14,000 4,199 3,600 18,000 15,600 3,500 5,621 1,440 1,200 19,451 4,000 5,585 64,900 92,880 1,636 20,655 531 531 16,000 4,800 3,310 3,660 1,900 5,585 36,024 28,875 5,585 64,900 908 728 1,636 1,636 1,636 295 236 531 531 531 1,900 1,900 1,900 3,500 3,500 (3,500) (7,375) 3,310 1,055 3,310 845 (3,310) BUILDING EXTERIOR (Building 3) 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 Roofing, standing seam metal Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing, metal PVC Fascia EIFS dormers, chimneys & cupola, rep EIFS dormers, chimneys & cupola, refu Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace 287,587 21,000 6,911 5,800 26,000 15,600 3,500 6,353 2,880 2,400 32,012 8,800 7,375 79,389 113,616 1,743 22,003 3,500 7,375 28,925 7,375 28,925 50,464 7,375 79,389 635 635 1,108 1,743 79,389 1,743 Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-7 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CASH FLOW METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE 4 cont'd Item # Description of Projected Replacement 107 108 109 110 111 112 113 French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators Estimated Replacement Costs 797 797 24,000 9,600 6,620 7,320 3,800 Allocation of Beginning Balance 2011 2011 Reserve Projected Funding Replacements 290 2011 End of Year Balance 290 6,620 2012 2012 Reserve Projected Funding Replacements 506 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 797 6,620 2013 End of Year Balance 797 6,620 (6,620) 1,385 1,385 2,415 3,800 3,800 7,215 5,908 8,862 16,215 5,908 8,862 10,307 15,461 16,215 16,215 24,323 3,309 16,215 16,215 24,323 3,309 2,083 1,466 6,100 2,700 1,900 6,100 BUILDING EXTERIOR (Miscellaneo 114 115 116 117 118 119 120 121 122 123 124 Balcony Soffits (Bldg 1) Balcony Soffits (Bldg 2) Balcony Soffits (Bldg 3) Roof eave soffits (Bldg 1) Roof eave soffits (Bldg 2) Roof eave soffits (Bldg 3) Awning, fabric (Building 3) Awning, frame (Building 3) Joint Sealants,exterior (Building 1) Joint Sealants, exterior (Building 2) Joint Sealants, exterior (Building 3) 16,215 16,215 24,323 9,603 9,603 16,326 2,700 1,900 17,700 17,700 25,400 9,001 2,700 2,700 17,700 17,700 25,400 617 434 (2,700) 617 434 (17,700) 17,700 25,400 (17,700) 5,100 (5,100) 25,400 (25,400) BUILDING INTERIOR (Building 1) 125 126 127 128 Flooring, interior carpet (Flr 2-4) Flooring, porcelain tile (1st Floor) Lobby furnishings (partial) Mailboxes, aluminum gang boxes 5,100 14,199 6,500 1,640 5,100 2,240 2,240 BUILDING INTERIOR (Building 2) 129 130 131 132 133 134 Flooring, porcelain tile (Flr 4) Flooring, interior carpet (Flr 2 & 3) Flooring, porcelain tile (1st Floor) Lobby furnishings (partial) Mailboxes, aluminum gang boxes Corridor wall coverings (Flr 2-4) 5,532 2,550 14,199 6,500 1,640 8,505 2,550 2,550 2,550 (2,550) 2,240 4,721 3,784 8,505 8,505 6,503 6,503 2,240 8,505 BUILDING INTERIOR (Building 3) 135 136 137 138 139 140 Flooring, marble tile (Flrs 2-4) Flooring, interior carpet (Flr 2-4) Flooring, porcelain tile (1st Floor) Lobby furnishings (partial) Mailboxes, aluminum gang boxes Corridor wall coverings (Flr 2-4) 23,470 6,503 14,199 6,500 2,624 4,536 6,503 (6,503) 2,240 1,653 1,653 2,883 2,240 4,536 4,536 7,900 29,500 7,900 29,500 BUILDING SYSTEM (Building 1) 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 Elevator cab & door, passenger Elevator, hydraulic psngr, controls Elevator, hydraulic psngr, piston Domestic water pumps Pump controller Plumbing risers, partial Pressure tanks Backflow preventer, domestic Backflow preventer, fire Fire pump & jockey pump Fire pump controllers Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances Backup generator Switchgear Intercom system (partial) Fire alarm control panel BUILDING SYSTEM (Building 2) 7,900 29,500 14,800 2,600 1,450 176,000 1,600 3,900 4,300 7,700 3,300 1,985 1,250 2,980 1,540 1,680 2,000 1,200 3,120 2,160 39,000 3,600 3,100 12,000 7,900 29,500 7,900 29,500 1,540 2,000 666 3,120 2,160 3,100 534 1,540 1,540 2,000 1,200 3,120 2,160 2,000 1,200 3,120 2,160 3,100 (3,100) 896 500 896 500 684 431 684 431 (1,540) 2,000 1,200 3,120 2,160 Miller + Dodson Associates, Inc. Cash Flow Method Accounting Summary - Page CF-8 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 CASH FLOW METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE 4 cont'd Item # 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 Description of Projected Replacement Elevator cab & door, passenger Elevator, traction psngr, controls Elevator, traction psngr, mechanical Domestic water pumps Pump controllers Plumbing risers, partial Pressure tanks Backflow preventer Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances Intercom system (partial) Fire alarm control panel Estimated Replacement Costs Allocation of Beginning Balance 7,900 60,200 30,100 2,600 1,450 176,000 1,600 3,900 1,985 1,250 2,980 1,540 1,680 2,000 1,200 3,120 2,160 3,100 12,000 4,385 33,416 2011 2011 Reserve Projected Funding Replacements 3,515 26,784 1,540 2,000 1,732 1,199 3,100 437 1,388 961 2011 End of Year Balance 2012 2012 Reserve Projected Funding Replacements 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 2013 End of Year Balance 7,900 60,200 7,900 60,200 7,900 60,200 1,540 1,540 1,540 2,000 1,200 3,120 2,160 3,100 2,000 1,200 3,120 2,160 2,000 437 3,120 2,160 3,100 763 (3,100) BUILDING SYSTEM (Building 3) 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 Elevator cab & door, passenger Elevator, traction psngr, controls Elevator, traction psngr, mechanical Domestic water pumps Pump controllers Plumbing risers, partial Pressure tanks Backflow preventer Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances Intercom system (partial) Fire alarm control panel 7,900 60,200 30,100 2,600 1,450 281,600 3,200 3,900 1,985 1,250 5,960 3,080 2,520 3,100 1,850 4,992 4,320 5,250 16,600 2,878 21,933 3,080 1,721 5,022 38,267 3,080 1,379 1,819 1,574 5,250 2,878 21,933 3,100 1,819 1,574 5,250 422 3,173 2,746 7,900 60,200 7,900 60,200 3,080 3,080 3,100 422 4,992 4,320 5,250 1,428 3,100 1,850 4,992 4,320 5,250 Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-1 Pierpointe at Freemason Harbour December 8, 2010 1068105PIERPOIN11 COMPONENT METHOD ACCOUNTING SUMMARY This Pierpointe at Freemason Harbour - Component Method Accounting Summary is an attachment to the Pierpointe at Freemason Harbour - Replacement Reserve Study dated December 8, 2010 and is for use by accounting and reserve professionals experienced in Association funding and accounting principals. This Summary consists of four reports, the 2011, 2012, and 2013 Cash Flow Method Category Funding Reports (3) and a Three-Year Replacement Funding Report. z COMPONENT METHOD CATEGORY FUNDING REPORT, 2011, 2012, and 2013. Each of the 202 Projected Replacements listed in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of 13 categories. The following information is summarized by category in each report: Normal Economic Life and Remaining Economic Life of the Projected Replacements. Cost of all Scheduled Replacements in each category. Replacement Reserves on Deposit allocated to the category at the beginning and end of the report period. Cost of Projected Replacements in the report period. Recommended Replacement Reserve Funding allocated to the category during the report period as calculated by the Component Method. z THREE-YEAR REPLACEMENT FUNDING REPORT. This report details the allocation of the $444,318 Beginning Balance (at the start of the Study Year) and the $741,865 of additional Replacement Reserve funding in 2011 through 2013 (as calculated in the Replacement Reserve Analysis) to each of the 202 Projected Replacements listed in the Replacement Reserve Inventory. These allocations have been made using the Component Method as outlined in the Replacement Reserve Analysis. The calculated data includes: Identification and estimated cost of each Projected Replacement schedule in years 2011 through 2013. Allocation of the $444,318 Beginning Balance to the Projected Replacements by the Component Method. Allocation of the $741,865 of additional Replacement Reserve Funding recommended in the Replacement Reserve Analysis in years 2011 through 2013, by the Component Method. Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-2 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 2011 - COMPONENT METHOD CATEGORY FUNDING REPORT Each of the 202 Projected Replacements included in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of the 13 categories listed in TABLE CM-1 below. This calculated data is a summar of data provided in the Three-Year Replacement Funding Report and Replacement Reserve Inventory. The accuracy of this data is dependent upon many factors including the following critical financial data: A Beginning Balance of $444,318 as of the first day of the Study Year, January 1, 2011. Total reserve funding (including the Beginning Balance) of $711,876 in the Study Year. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2011 being accomplished in 2011 at a cost of $31,295. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates to arrange for an update of the Replacement Reserve Study. 2011 - COMPONENT METHOD CATEGORY FUNDING - TABLE CM-1 CATEGORY NORMAL ECONOMIC LIFE SITE COMPONENT 6 to 60 years SITE COMPONENT (cont.) 4 to 40 years REMAINING ECONOMIC LIFE ESTIMATED REPLACEMENT COST 2011 BEGINNING BALANCE 2 to 60 years $106,544 $19,065 $8,880 0 to 31 years $746,500 $99,245 $58,665 2 to 60 years 2011 RESERVE FUNDING 2011 PROJECTED REPLACEMENTS 2011 END OF YEAR BALANCE $1,200 $156,710 $12,395 $82,920 $27,944 SITE COMPONENT (cont.) 10 to 35 years 10 to 25 years $27,949 $1,381 $1,795 BUILDING EXTERIOR (Building 1) 10 to 30 years 0 to 30 years $377,341 $62,025 $33,290 $3,176 BUILDING EXTERIOR (Building 2) 10 to 30 years 1 to 30 years $363,983 $49,642 $25,995 BUILDING EXTERIOR (Building 3) 10 to 30 years 2 to 30 years $695,901 $47,504 $37,212 BUILDING EXTERIOR (Miscellaneous) 7 to 30 years 0 to 12 years $157,686 $34,159 $33,583 BUILDING INTERIOR (Building 1) 3 to 42 years 0 to 25 years $27,439 $4,261 $2,960 BUILDING INTERIOR (Building 2) 3 to 42 years 0 to 25 years $38,926 $5,443 $2,973 $8,416 BUILDING INTERIOR (Building 3) 3 to 42 years 0 to 32 years $57,831 $6,449 $3,901 $10,350 BUILDING SYSTEM (Building 1) 8 to 40 years 1 to 30 years $328,665 $37,383 $17,461 $54,844 BUILDING SYSTEM (Building 2) 8 to 40 years 2 to 31 years $316,765 $36,493 $18,746 $55,239 BUILDING SYSTEM (Building 3) 8 to 40 years 3 to 32 years $441,857 $41,269 $22,097 $63,366 $75,637 $84,716 $17,700 $50,042 $7,220 Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-3 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 2012 - COMPONENT METHOD CATEGORY FUNDING REPORT Each of the 202 Projected Replacements included in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of the 13 categories listed in TABLE CM-2 below. This calculated data is a summary of data provided in the Three-Year Replacement Funding Report and Replacement Reserve Inventory. The accuracy of this data is dependent upon many factors including the following critical financial data: Replacement Reserves on Deposit totaling $680,581 on January 1, 2012. Total reserve funding (including the Beginning Balance) of $962,375 in 2011 through 2012. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2012 being accomplished in 2012 at a cost of $103,845. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates to arrange for an update of the Replacement Reserve Study. 2012 - COMPONENT METHOD CATEGORY FUNDING - TABLE CM-2 CATEGORY NORMAL ECONOMIC LIFE REMAINING ECONOMIC LIFE ESTIMATED REPLACEMENT COST 2012 BEGINNING BALANCE 2012 RESERVE FUNDING SITE COMPONENT 6 to 60 years 1 to 59 years $106,544 $27,944 $8,880 SITE COMPONENT (cont.) 4 to 40 years 0 to 30 years $746,500 $156,710 $58,203 2012 PROJECTED REPLACEMENTS 2012 END OF YEAR BALANCE $62,850 $152,062 $36,824 SITE COMPONENT (cont.) 10 to 35 years 9 to 24 years $27,949 $3,176 $1,795 $4,971 BUILDING EXTERIOR (Building 1) 10 to 30 years 4 to 29 years $377,341 $82,920 $26,171 $109,091 BUILDING EXTERIOR (Building 2) 10 to 30 years 0 to 29 years $363,983 $75,637 $25,995 BUILDING EXTERIOR (Building 3) 10 to 30 years 1 to 29 years $695,901 $84,716 $37,212 $12,395 $89,238 $121,928 BUILDING EXTERIOR (Miscellaneous) 7 to 30 years 0 to 11 years $157,686 $50,042 $24,107 $20,400 BUILDING INTERIOR (Building 1) 3 to 42 years 0 to 24 years $27,439 $7,220 $2,960 $5,100 $53,749 BUILDING INTERIOR (Building 2) 3 to 42 years 1 to 24 years $38,926 $8,416 $2,973 BUILDING INTERIOR (Building 3) 3 to 42 years 1 to 31 years $57,831 $10,350 $3,901 BUILDING SYSTEM (Building 1) 8 to 40 years 0 to 29 years $328,665 $54,844 $17,461 BUILDING SYSTEM (Building 2) 8 to 40 years 1 to 30 years $316,765 $55,239 $18,746 $73,984 BUILDING SYSTEM (Building 3) 8 to 40 years 2 to 31 years $441,857 $63,366 $22,097 $85,463 $5,080 $11,388 $14,251 $3,100 $69,205 Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-4 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 2013 - COMPONENT METHOD CATEGORY FUNDING REPORT Each of the 202 Projected Replacements included in the Pierpointe at Freemason Harbour Replacement Reserve Inventory has been assigned to one of the 13 categories listed in TABLE CM-3 below. This calculated data is a summary of data provided in the Three-Year Replacement Funding Report and Replacement Reserve Inventory. The accuracy of this data is dependent upon many factors including the following critical financial data: Replacement Reserves on Deposit totaling $827,236 on January 1, 2013. Total Replacement Reserve funding (including the Beginning Balance) of $1,186,183 in 2011 to 2013. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2013 being accomplished in 2013 at a cost of $64,611. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates to arrange for an update of the Replacement Reserve Study. 2013 - COMPONENT METHOD CATEGORY FUNDING - TABLE CM-3 NORMAL ECONOMIC LIFE REMAINING ECONOMIC LIFE ESTIMATED REPLACEMENT COST SITE COMPONENT 6 to 60 years 0 to 58 years $106,544 SITE COMPONENT (cont.) 4 to 40 years 0 to 29 years $746,500 CATEGORY 2013 BEGINNING BALANCE 2013 RESERVE FUNDING 2013 PROJECTED REPLACEMENTS 2013 END OF YEAR BALANCE $36,824 $8,880 $7,464 $38,240 $152,062 $42,229 $560 $193,731 SITE COMPONENT (cont.) 10 to 35 years 8 to 23 years $27,949 $4,971 $1,795 $6,766 BUILDING EXTERIOR (Building 1) 10 to 30 years 3 to 28 years $377,341 $109,091 $26,171 $135,262 BUILDING EXTERIOR (Building 2) 10 to 30 years 4 to 29 years $363,983 $89,238 $22,539 BUILDING EXTERIOR (Building 3) 10 to 30 years 0 to 28 years $695,901 $121,928 $37,212 $17,495 $141,645 BUILDING EXTERIOR (Miscellaneous) 7 to 30 years 0 to 10 years $157,686 $53,749 $18,995 $25,400 $47,344 BUILDING INTERIOR (Building 1) 3 to 42 years 8 to 23 years $27,439 $5,080 $1,663 BUILDING INTERIOR (Building 2) 3 to 42 years 0 to 23 years $38,926 $11,388 $2,973 $2,550 $11,811 BUILDING INTERIOR (Building 3) 3 to 42 years 0 to 30 years $57,831 $14,251 $3,901 $6,503 $11,649 BUILDING SYSTEM (Building 1) 8 to 40 years 0 to 28 years $328,665 $69,205 $16,608 $1,540 $84,273 BUILDING SYSTEM (Building 2) 8 to 40 years 0 to 29 years $316,765 $73,984 $18,746 $3,100 BUILDING SYSTEM (Building 3) 8 to 40 years 1 to 30 years $441,857 $85,463 $22,097 $111,777 $6,743 $89,630 $107,560 Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-5 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 COMPONENT METHOD - THREE-YEAR REPLACEMENT FUNDING REPORT TABLE CM-4 below details the allocation of the $444,318 Beginning Balance, as reported by the Association and the $741,865 of Replacement Reserve Funding calculated by the Cash Flow Method in 2011 to 2013, to the 202 Projected Replacements listed in the Replacement Reserve Inventory. These allocations have been made by Chronological Allocation, a method developed by Miller Dodson Associates, Inc., and outlined on Page CF-1. The accuracy of the allocations is dependent upon many factors including the following critical financial data: Replacement Reserves on Deposit totaling $444,318 on January 1, 2011. Replacement Reserves on Deposit totaling $680,581 on January 1, 2012. Replacement Reserves on Deposit totaling $827,236 on January 1, 2013. Total Replacement Reserve funding (including the Beginning Balance) of $1,186,183 in 2011 to 2013. No expenditures from Replacement Reserves other than those specifically listed in the Replacement Reserve Inventory. All Projected Replacements scheduled in the Replacement Reserve Inventory in 2011 to 2013 being accomplished as scheduled in the Replacement Reserve Inventory at a cost of $199,751. If any of these critical factors are inaccurate, do not use the data and please contact Miller Dodson Associates, Inc., to arrange for an update of the Replacement Reserve Study. COMPONENT METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE CM-4 Item # Description of Projected Replacement Estimated Replacement Costs Allocation of Beginning Balance 7,464 52,247 4,699 4,699 4,699 8,766 8,766 8,766 404 404 404 404 404 404 404 404 404 404 1,200 1,200 1,361 9,525 1,428 857 286 2,663 1,598 533 130 115 101 86 71 56 42 27 12 2,520 560 4,000 4,600 750 1,200 20,250 83,700 42,600 207,320 14,000 330,000 35,000 345 153 547 943 103 438 5,907 21,362 12,426 15,118 4,400 3,780 3,010 3,600 2,700 4,750 413 2011 2011 Reserve Projected Funding Replacements 2011 End of Year Balance 2012 2012 Reserve Projected Funding Replacements 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 2013 End of Year Balance SITE COMPONENT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Asphalt pavement, seal coat Asphalt pavement, overlay Concrete curb & gutter (20%) Concrete curb & gutter (20%) Concrete curb & gutter (20%) Concrete curb (20%) Concrete curb (20%) Concrete curb (20%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Concrete sidewalk (6%) Quarry tile at entrances (partial) Quarry tile at entrances (partial) 175 2,034 4,747 363 142 98 678 265 183 39 22 16 13 11 9 8 8 7 7 171 57 3,395 14,271 1,791 999 384 3,341 1,864 716 169 138 117 99 82 66 50 35 19 7 346 57 2,034 4,747 363 142 98 678 265 183 39 22 16 13 11 9 8 8 7 7 171 57 5,429 19,018 2,155 1,141 482 4,020 2,129 899 208 160 133 111 93 75 59 42 27 13 517 114 2,034 4,747 363 142 98 678 265 183 39 22 16 13 11 9 8 8 7 7 171 57 145 136 691 522 129 762 7,172 5,195 15,087 6,006 2,800 17,147 2,872 490 289 1,238 1,466 232 635 424 1,928 1,988 362 300 13,078 26,557 27,513 21,124 2,800 55,649 6,275 145 136 691 522 129 300 7,172 5,195 15,087 6,006 2,800 17,147 2,872 27,130 5,600 72,796 9,148 145 136 691 522 129 300 2,025 5,195 4,260 6,006 2,800 17,147 2,872 566 344 274 327 245 721 153 344 274 327 245 201 719 687 547 655 491 922 153 344 274 327 245 201 (7,464) 23,765 2,518 1,284 580 4,698 2,394 1,082 247 182 149 124 103 85 67 50 34 20 688 171 SITE COMPONENT (cont.) 21 22 23 24 25 26 27 28 29 30 31 32 33 Light pole, site Light, site, pole mounted Actuator, drop arm, entry gate Gate barrier Keypad entry system Entry gate reurbishing Bulkhead, sheetpile (Bldg 1), refurbish Bulkhead, sheetpile (Bldg 1), replace Bulkhead, (Bldg 2 & 3), refurbish Bulkhead, (Bldg 2 & 3), replace Sink hole, backfill & cap Concrete pile, refurbishing Concrete pile cap (partial) 38,502 3,403 (1,200) (20,250) 31,752 (42,600) 780 (560) 2,619 2,511 491 600 2,025 36,946 4,260 33,137 8,400 89,943 12,020 SITE COMPONENT (cont.) 34 35 36 37 38 39 3" water meter Domestic water main (10%) Sanitary main (10%) Domestic water lateral (partial) Sanitary lateral (partial) Storm water, curb inlet (25%) 520 153 344 274 327 245 201 873 1,031 821 982 736 1,124 Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-6 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 COMPONENT METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE CM-4 cont'd Item # 40 41 Description of Projected Replacement Storm water, drop inlet (50%) Storm water, 18" RCP (25%) Estimated Replacement Costs Allocation of Beginning Balance 2011 2011 Reserve Projected Funding Replacements 2011 End of Year Balance 2012 2012 Reserve Projected Funding Replacements 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 2013 End of Year Balance 4,100 1,609 448 174 77 622 77 174 77 796 153 174 77 970 230 70,042 14,000 4,199 3,900 18,000 15,600 3,500 5,621 1,440 1,200 19,451 4,000 5,585 64,900 92,880 1,636 20,655 531 531 16,000 4,800 3,310 3,660 1,900 16,174 2,297 459 427 2,953 1,706 1,276 922 158 131 3,191 656 2,036 14,198 10,159 358 2,259 116 58 4,897 1,064 178 165 1,368 662 2,224 427 61 51 1,478 304 3,549 8,450 3,939 213 876 69 23 516 204 2,103 199 270 21,071 3,361 637 592 4,321 2,368 679 548 4,897 1,064 178 165 1,368 662 350 427 61 51 1,478 304 186 8,450 3,939 213 876 69 23 516 204 221 199 270 25,968 4,425 815 757 5,689 3,030 350 1,777 280 233 6,148 1,264 186 31,098 18,037 784 4,011 255 103 1,032 932 221 878 818 4,897 1,064 178 165 1,368 662 350 427 61 51 1,478 304 186 8,450 3,939 213 876 69 23 516 204 221 199 270 30,865 5,489 994 923 7,057 3,691 700 2,204 341 284 7,626 1,568 372 39,549 21,976 997 4,887 324 126 1,548 1,136 441 1,077 1,089 56,983 14,000 4,199 3,600 18,000 15,600 3,500 5,621 1,440 1,200 19,451 4,000 5,585 64,900 92,880 1,636 20,655 531 531 16,000 4,800 3,310 3,660 1,900 9,003 2,042 408 350 2,625 1,517 1,021 820 140 117 2,837 583 1,900 12,620 9,030 318 2,008 103 52 11,825 3,038 581 498 3,906 2,157 2,260 1,220 199 166 4,221 868 3,743 20,089 12,842 506 2,856 164 73 516 664 2,178 617 450 2,822 997 172 148 1,281 640 1,240 400 59 49 1,385 285 1,842 7,469 3,811 188 848 61 22 516 197 1,132 190 242 14,648 4,035 753 645 5,188 2,797 467 1,046 427 208 2,822 997 172 148 1,281 640 1,240 400 59 49 1,385 285 1,842 7,469 3,811 188 848 61 22 516 197 1,132 190 242 807 691 2,822 997 172 148 1,281 640 350 400 59 49 1,385 285 186 7,469 3,811 188 848 61 22 516 197 221 190 242 17,470 5,031 925 793 6,469 3,437 350 2,020 317 264 6,990 1,438 186 35,026 20,464 883 4,551 287 117 1,548 1,058 221 998 933 2,680 588 493 3,318 1,327 893 811 245 204 4,085 1,123 2,420 13,508 9,666 297 1,872 9,586 1,409 275 231 1,745 621 869 426 115 95 2,148 591 1,652 8,235 4,520 181 875 9,586 4,089 863 724 5,063 1,948 1,762 1,237 360 300 6,233 1,714 4,072 21,743 14,185 477 2,747 9,586 1,409 275 231 1,745 621 869 426 115 95 2,148 591 1,652 8,235 4,520 181 875 19,172 5,498 1,138 955 6,807 2,568 2,631 1,663 474 395 8,381 2,304 5,723 29,978 18,705 658 3,622 9,586 1,409 275 231 1,745 621 869 426 115 95 2,148 591 1,652 8,235 4,520 181 875 28,759 6,908 1,413 1,186 8,552 3,189 BUILDING EXTERIOR (Building 1) 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Roofing, shingle asphalt/fiberglass Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing, metal PVC Fascia Trim EIFS dormers, chimneys & cupola, rep EIFS dormers, chimneys & cupola, refu Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators 525 1,207 480 277 (3,500) 1,349 219 182 4,670 960 (5,585) 22,648 14,098 571 3,135 185 81 516 729 (3,310) BUILDING EXTERIOR (Building 2) 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 Roofing, shingle asphalt/fiberglass Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing , metal PVC Fascia EIFS dormers & chimneys, replace EIFS dormers & chimneys, refurbish Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators (3,500) 1,620 258 215 5,606 1,153 (5,585) 27,557 16,653 695 3,703 226 95 1,032 861 (3,310) BUILDING EXTERIOR (Building 3) 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 Roofing, standing seam metal Roofing, single ply membrane Gutter & downspout, 6" aluminum Roof flashing, metal PVC Fascia EIFS dormers, chimneys & cupola, rep EIFS dormers, chimneys & cupola, refu Exhaust vent wall caps Louvers, garage intake, 4'x6' Louvers, garage exhaust fans Brick veneer, repoint (10%) Replace steel lintels (partial) Sill pans for sliding doors Balcony decking Balcony structural framing Balcony railings, refurbish Balcony railings, replace 287,587 21,000 6,911 5,800 26,000 15,600 3,500 6,353 2,880 2,400 32,012 8,800 7,375 79,389 113,616 1,743 22,003 (3,500) 2,090 589 491 10,530 2,895 (7,375) 38,213 23,224 839 4,498 Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-7 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 COMPONENT METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE CM-4 cont'd Item # Description of Projected Replacement 107 108 109 110 111 112 113 French railings, refurbish French railings, replace Balcony column, structural upgrades Storefront entrances Garage doors Exterior doors Garage door operators Estimated Replacement Costs Allocation of Beginning Balance 797 797 24,000 9,600 6,620 7,320 3,800 136 68 2011 2011 Reserve Projected Funding Replacements 2011 End of Year Balance 2012 2012 Reserve Projected Funding Replacements 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 817 1,931 747 277 83 32 774 382 1,563 365 440 218 99 774 1,199 3,494 1,112 717 83 32 774 382 1,563 365 440 301 131 1,548 1,580 5,057 1,478 1,158 83 32 774 382 1,563 365 440 16,215 16,215 24,323 9,603 9,603 16,326 2,700 1,900 17,700 17,700 25,400 3,153 2,759 4,138 1,576 1,401 2,083 703 247 6,453 5,163 6,483 1,866 1,682 2,523 730 684 1,096 998 184 11,247 6,269 6,306 5,019 4,441 6,662 2,305 2,084 3,179 1,702 431 6,885 6,123 9,185 3,035 2,768 4,274 11,431 12,788 1,866 1,682 2,523 730 684 1,096 998 184 1,770 6,269 6,306 19,094 1,866 1,682 2,523 730 684 1,096 386 184 1,770 1,770 6,306 5,100 14,199 6,500 1,640 1,488 1,553 1,066 154 1,806 602 494 57 3,294 2,155 1,560 211 1,806 602 494 57 2,757 2,054 268 510 602 494 57 5,532 2,550 14,199 6,500 1,640 8,505 538 651 1,381 1,066 154 1,654 227 633 583 494 57 979 765 1,284 1,963 1,560 211 2,633 227 633 583 494 57 979 992 1,917 2,546 2,054 268 3,611 227 633 583 494 57 979 23,470 6,503 14,199 6,500 2,624 4,536 1,497 1,660 1,208 1,066 246 772 666 1,614 565 494 91 471 2,163 3,274 1,773 1,560 337 1,242 666 1,614 565 494 91 471 2,829 4,888 2,338 2,054 429 1,713 666 1,614 565 494 91 471 7,900 29,500 14,800 2,600 1,450 176,000 1,600 3,900 4,300 7,700 3,300 1,985 1,250 2,980 1,540 1,680 2,000 1,200 3,120 2,160 39,000 3,600 3,100 12,000 1,728 6,453 1,619 427 238 14,438 131 427 470 842 361 326 205 407 421 1,029 3,841 628 198 110 5,212 47 165 182 327 140 151 95 172 373 105 345 136 406 281 1,654 153 1,060 652 2,757 10,295 2,246 624 348 19,650 179 592 653 1,169 501 477 300 579 794 105 619 382 1,089 754 5,920 546 2,040 2,227 1,029 3,841 628 198 110 5,212 47 165 182 327 140 151 95 172 373 105 345 136 406 281 1,654 153 1,060 652 3,785 14,136 2,874 822 458 24,862 226 757 835 1,495 641 627 395 750 1,167 210 964 519 1,495 1,035 7,574 699 1,029 3,841 628 198 110 5,212 47 165 182 327 140 151 95 172 373 105 345 136 406 281 1,654 153 207 652 2013 End of Year Balance 384 163 2,323 1,962 (6,620) 1,843 1,598 BUILDING EXTERIOR (Miscellaneo 114 115 116 117 118 119 120 121 122 123 124 Balcony Soffits (Bldg 1) Balcony Soffits (Bldg 2) Balcony Soffits (Bldg 3) Roof eave soffits (Bldg 1) Roof eave soffits (Bldg 2) Roof eave soffits (Bldg 3) Awning, fabric (Building 3) Awning, frame (Building 3) Joint Sealants,exterior (Building 1) Joint Sealants, exterior (Building 2) Joint Sealants, exterior (Building 3) (17,700) (2,700) 615 1,770 (17,700) 8,751 7,805 11,708 3,765 3,451 5,370 386 798 3,540 1,770 (25,400) BUILDING INTERIOR (Building 1) 125 126 127 128 Flooring, interior carpet (Flr 2-4) Flooring, porcelain tile (1st Floor) Lobby furnishings (partial) Mailboxes, aluminum gang boxes (5,100) 510 3,360 2,548 325 BUILDING INTERIOR (Building 2) 129 130 131 132 133 134 Flooring, porcelain tile (Flr 4) Flooring, interior carpet (Flr 2 & 3) Flooring, porcelain tile (1st Floor) Lobby furnishings (partial) Mailboxes, aluminum gang boxes Corridor wall coverings (Flr 2-4) 1,219 (2,550) 3,128 2,548 325 4,590 BUILDING INTERIOR (Building 3) 135 136 137 138 139 140 Flooring, marble tile (Flrs 2-4) Flooring, interior carpet (Flr 2-4) Flooring, porcelain tile (1st Floor) Lobby furnishings (partial) Mailboxes, aluminum gang boxes Corridor wall coverings (Flr 2-4) 3,495 (6,503) 2,902 2,548 520 2,183 BUILDING SYSTEM (Building 1) 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 Elevator cab & door, passenger Elevator, hydraulic psngr, controls Elevator, hydraulic psngr, piston Domestic water pumps Pump controller Plumbing risers, partial Pressure tanks Backflow preventer, domestic Backflow preventer, fire Fire pump & jockey pump Fire pump controllers Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances Backup generator Switchgear Intercom system (partial) Fire alarm control panel BUILDING SYSTEM (Building 2) 273 246 683 473 4,266 394 980 1,575 (3,100) 2,878 4,814 17,977 3,502 1,019 568 30,073 273 923 1,017 1,822 781 778 490 922 (1,540) 315 1,309 655 1,901 1,316 9,228 852 207 3,530 Miller + Dodson Associates, Inc. Component Method Accounting Summary - Page CM-8 December 8, 2010 Pierpointe at Freemason Harbour 1068105PIERPOIN11 COMPONENT METHOD - THREE-YEAR REPLACEMENT FUNDING - TABLE CM-4 cont'd Item # 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 Description of Projected Replacement Elevator cab & door, passenger Elevator, traction psngr, controls Elevator, traction psngr, mechanical Domestic water pumps Pump controllers Plumbing risers, partial Pressure tanks Backflow preventer Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances Intercom system (partial) Fire alarm control panel Estimated Replacement Costs Allocation of Beginning Balance 7,900 60,200 30,100 2,600 1,450 176,000 1,600 3,900 1,985 1,250 2,980 1,540 1,680 2,000 1,200 3,120 2,160 3,100 12,000 1,536 11,706 4,390 379 211 12,834 117 379 289 182 362 374 7,900 60,200 30,100 2,600 1,450 281,600 3,200 3,900 1,985 1,250 5,960 3,080 2,520 3,100 1,850 4,992 4,320 5,250 16,600 1,344 10,243 3,841 332 185 17,967 204 332 253 160 634 655 182 219 607 420 904 1,400 2011 2011 Reserve Projected Funding Replacements 2011 End of Year Balance 2012 2012 Reserve Projected Funding Replacements 2012 End of Year Balance 2013 2013 Reserve Projected Funding Replacements 909 6,928 2,143 185 103 5,099 46 160 141 89 164 291 99 303 123 359 249 732 624 2,445 18,634 6,532 564 315 17,933 163 539 431 271 526 666 99 485 341 966 669 1,636 2,024 909 6,928 2,143 185 103 5,099 46 160 141 89 164 291 99 303 123 359 249 732 624 3,354 25,561 8,675 749 418 23,032 209 699 572 360 689 957 198 788 464 1,325 917 2,368 2,647 909 6,928 2,143 185 103 5,099 46 160 141 89 164 291 99 303 123 359 249 732 624 819 6,245 2,020 174 97 7,989 91 155 133 84 313 485 140 423 173 518 448 962 828 2,164 16,487 5,861 506 282 25,956 295 487 387 243 947 1,140 140 564 468 1,367 1,183 2,365 2,523 819 6,245 2,020 174 97 7,989 91 155 133 84 313 485 140 423 173 518 448 962 828 2,983 22,732 7,881 681 380 33,945 386 642 520 327 1,260 1,625 280 987 641 1,885 1,631 3,327 3,351 819 6,245 2,020 174 97 7,989 91 155 133 84 313 485 140 423 173 518 448 962 828 2013 End of Year Balance 4,264 32,489 10,817 934 521 28,131 256 859 713 449 853 1,249 296 1,091 587 1,684 1,166 (3,100) 3,271 BUILDING SYSTEM (Building 3) 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 Elevator cab & door, passenger Elevator, traction psngr, controls Elevator, traction psngr, mechanical Domestic water pumps Pump controllers Plumbing risers, partial Pressure tanks Backflow preventer Heat pump, 2.5 ton Air handler Exhaust fans, garage, 5,100 cfm Exhaust fans, garage, motors Unit heaters, ground floor (20%) Interior lighting, garage (partial) Interior lighting, interiors (partial) Exterior lighting, balconies Exterior lighting, entrances Intercom system (partial) Fire alarm control panel 141 295 849 735 1,404 1,695 3,803 28,977 9,901 855 477 41,934 477 797 653 411 1,574 2,110 420 1,409 813 2,403 2,079 4,288 4,179 Miller - Dodson Associates, Inc. Attachments - Page E1 Appendix 1. COMMON INTEREST DEVELOPMENTS - AN OVERVIEW Over the past 40 years, the responsibility for community facilities and infrastructure around many of our homes has shifted from the local government to Community Associations. Thirty years ago, a typical new town house abutted a public street on the front and a public alley on the rear. Open space was provided by a nearby public park and recreational facilities were purchased ala carte from privately owned country clubs, swim clubs, tennis clubs, and gymnasiums. Today, 60% of all new residential construction, i.e. townhouses, single family homes, condominiums, and cooperatives, is in Common Interest Developments (CID). In a CID, a home owner is bound to a Community Association that owns, maintains, and is responsible for periodic replacements of various components that may include the roads, curbs, sidewalks, playgrounds, street lights, recreational facilities, and other community facilities and infrastructure. The growth of Community Associations has been explosive. In 1965 there were only 500 Community Associations in the United States. According to the U.S. Census, there were 130,000 Community Associations in 1990. Community Associations Institute (CAI), a national trade association, estimates there were more than 200,000 Community Associations in the year 2000, and that the number of Community Associations will continue to multiply. The shift of responsibility for billions of dollars of community facilities and infrastructure from the local government and private sector to Community Associations has generated new and unanticipated problems. Although Community Associations have succeeded in solving many short term problems, many Associations have failed to properly plan for the tremendous expenses of replacing community facilities and infrastructure components. When inadequate replacement reserve funding results in less than timely replacements of failing components, home owners are exposed to the burden of special assessments, major increases in Association fees, and a decline in property values. 2. REPLACEMENT RESERVE STUDY The purpose of a Replacement Reserve Study is to provide the Association with an inventory of the common community facilities and infrastructure components that require periodic replacement, a general view of the condition of these components, and an effective financial plan to fund projected periodic replacements. The Replacement Reserve Study consists of the following: • Replacement Reserve Study Introduction. The introduction provides a description of the property, reviews the intent of the Replacement Reserve Study, and lists documents and site evaluations upon which the Replacement Reserve Study is based. • Section A Replacement Reserve Analysis. Many components owned by the Association have a limited life and require periodic replacement. Therefore it is essential the Association have a financial plan that provides funding for the timely replacement of these components in order to protect the safety, appearance, and value of the community. In conformance with American Institute of Certified Public Accountant guidelines, Section A Replacement Reserve Analysis evaluates the current funding of Replacement Reserves as reported by the Association and recommends annual funding of Replacement Reserves by two generally accepted accounting methods; the Cash Flow Method and the Component Method. Section A Replacement Reserve Analysis includes graphic and tabular presentations of these methods and current Association funding. • Section B Replacement Reserve Inventory. The Replacement Reserve Inventory lists the commonly-owned components within the community that require periodic replacement using funding from Replacement Reserves. The Replacement Reserve Inventory also provides information about components excluded from the Replacement Reserve Inventory whose replacement is not scheduled for funding from Replacement Reserves. Replacement Reserve Inventory includes estimates of the normal economic life and the remaining economic life for those components whose replacement is scheduled for funding from Replacement Reserves. • Section C Projected Annual Replacements. The Calendar of Projected Annual Replacements provides a year-byyear listing of the Projected Replacements based on the data in the Replacement Reserve Inventory. • Section D Condition Assessment. Several of the items listed in the Replacement Reserve Inventory are discussed in more detail. The Condition Assessment includes a narrative and photographs that document conditions at the property observed during our visual evaluation. • Section E Attachments. The Appendix is provided as an attachment to the Replacement Reserve Study. Additional attachments may include supplemental photographs to document conditions at the property and additional information specific to the property cited in the Conditions Assessment (i.e. Consumer Product Safety Commission, Handbook for Public Playground Safety, information on segmental retaining walls, manufacturer recommendations for asphalt shingles or siding, etc). Miller - Dodson Associates, Inc. Attachments - Page E2 Appendix 3. METHODS OF ANALYSIS The Replacement Reserve industry generally recognizes two different methods of accounting for Replacement Reserve Analysis. Due to the difference in accounting methodologies, these methods lead to different calculated values for the Minimum Annual Contribution to the Reserves. The results of both methods are presented in this report. The Association should obtain the advice of its accounting professional as to which method is more appropriate for the Association. The two methods are: • Component Method. This method is a time tested mathematical model developed by HUD in the early 1980s. It treats each item in the replacement schedule as an individual line item budget. Generally, the Minimum Annual Contribution to Reserves is higher when calculated by the Component Method. The mathematical model for this method works as follows: First, the total Current Objective is calculated, which is the reserve amount that would have accumulated had all of the items on the schedule been funded from initial construction at their current replacement costs. Next, the Reserves Currently on Deposit (as reported by the Association) are distributed to the components in the schedule in proportion to the Current Objective. The Minimum Annual Deposit for each component is equal to the Estimated Replacement Cost, minus the Reserves on Hand, divided by the years of life remaining. • Cash Flow Method. The Cash Flow Method is sometimes referred to as the "Pooling Method." It calculates the minimum constant annual contribution to reserves (Minimum Annual Deposit) required to meet projected expenditures without allowing total reserves on hand to fall below the specified minimum level in any year. This method usually results in a calculated requirement for annual contribution somewhat less than that arrived at by the Component Method of analysis. First, the Minimum Recommended Reserve Level to be Held on Account is determined based on the age, condition, and replacement cost of the individual components. The mathematical model then allocates the estimated replacement costs to the future years in which they are projected to occur. Based on these expenditures, it then calculates the minimum constant yearly contribution (Minimum Annual Deposit) to the reserves necessary to keep the reserve balance at the end of each year above the Minimum Recommended Reserve Level to be Held on Account. The Cash Flow Analysis assumes that the Association will have authority to use all of the reserves on hand for replacements as the need occurs. This method usually results in a Minimum Annual Deposit which is less than that arrived at by the Component Method. • 4. Adjusted Cash Flow Analysis. This program has the ability to modify the Cash Flow Method to take into account forecasted inflation and interest rates, thereby producing an Adjusted Cash Flow Analysis. Attempting to forecast future inflation and interest rates and the impact of changing technology is highly tenuous. Therefore, in most cases it is preferable to make a new schedule periodically rather than attempt to project far into the future. We will provide more information on this type of analysis upon request. REPLACEMENT RESERVE STUDY DATA • Identification of Reserve Components. The Reserve Analyst has only two methods of identifying Reserve Components; 1) information provided by the Association and 2) observations made at the site. It is important that the Reserve Analyst be provided with all available information detailing the components owned by the Association. It is our policy to request such information prior to bidding on a project and to meet with the individuals responsible for maintaining the community after acceptance of our proposal. After completion of the Study, the Study should be reviewed by the Board of Directors, individuals responsible for maintaining the community, and the Association’s accounting professionals. We are dependent upon the Association for correct information, documentation, and drawings. • Unit Costs. Unit costs are developed using nationally published standards and estimating guides and are adjusted by state or region. In some instances, recent data received in the course of our work is used to modify these figures. Contractor proposals or actual cost experience may be available as part of the Association records. This is useful information which should be incorporated into your report. Please bring any such available data to our attention, preferably before the report is commenced. • Replacement vs. Repair and Maintenance. A Replacement Reserve Study addresses the required funding for Capital Replacement Expenditures. This should not be confused with operational costs or cost of repairs or maintenance. Miller - Dodson Associates, Inc. Attachments - Page E3 Appendix 5. DEFINITIONS Adjusted Cash Flow Analysis. Cash flow analysis adjusted to take into account annual cost increases due to inflation and interest earned on invested reserves. In this method, the annual contribution is assumed to grow annually at the inflation rate. Annual Deposit if Reserves Were Fully Funded. Shown on the Summary Sheet A1 in the Component Method summary, this would be the amount of the Annual Deposit needed if the Reserves Currently on Deposit were equal to the Total Current Objective. Cash Flow Analysis. See Cash Flow Method, above. Component Analysis. See Component Method, above. Contingency. An allowance for unexpected requirements. Roughly the same as the Minimum Recommended Reserve Level to be Held on Account used in the Cash Flow Method of analysis. Critical Year. In the Cash Flow Method, a year in which the reserves on hand are projected to fall to the established minimum level. See Minimum Recommended Reserve Level to be Held on Account. Current Objective. This is the reserve amount that would have accumulated had the item been funded from initial construction at its current replacement cost. It is equal to the estimated replacement cost divided by the estimated economic life, times the number of years expended (the difference between the Estimated Economic Life and the Estimated Life Left). The Total Current Objective can be thought of as the amount of reserves the Association should now have on hand based on the sum of all of the Current Objectives. Cyclic Replacement Item. A component item that typically begins to fail after an initial period (Estimated Initial Replacement), but which will be replaced in increments over a number of years (the Estimated Replacement Cycle). The Reserve Analysis program divides the number of years in the Estimated Replacement Cycle into five equal increments. It then allocates the Estimated Replacement Cost equally over those five increments. (As distinguished from Normal Replacement Items, see below) Estimated Economic Life. Used in the Normal Replacement Schedules. This represents the industry average number of years that a new item should be expected to last until it has to be replaced. This figure is sometimes modified by climate, region, or original construction conditions. Estimated Economic Life Left. Used in the Normal Replacement Schedules. Number of years until the item is expected to need replacement. Normally, this number would be considered to be the difference between the Estimated Economic Life and the age of the item. However, this number must be modified to reflect maintenance practice, climate, original construction and quality, or other conditions. For the purpose of this report, this number is determined by the Reserve Analyst based on the present condition of the item relative to the actual age. Estimated Initial Replacement. For a Cyclic Replacement Item (see above), the number of years until the replacement cycle is expected to begin. Estimated Replacement Cycle. For a Cyclic Replacement Item, the number of years over which the remainder of the component's replacement occurs. Minimum Annual Deposit. Shown on the Summary Sheet A1. The calculated requirement for annual contribution to reserves as calculated by the Cash Flow Method (see above). Minimum Deposit in the Study Year. Shown on the Summary Sheet A1. The calculated requirement for contribution to reserves in the study year as calculated by the Component Method (see above). Minimum Recommended Reserve Level to be Held on Account. Shown on the Summary Sheet A1, this number is used in the Cash Flow Method only. This is the prescribed level below which the reserves will not be allowed to fall in any year. This amount is determined based on the age, condition, and replacement cost of the individual components. This number is normally given as a percentage of the total Estimated Replacement Cost of all reserve components. Normal Replacement Item. A component of the property that, after an expected economic life, is replaced in its entirety. (As distinguished from Cyclic Replacement Items, see above.) Normal Replacement Schedules. The list of Normal Replacement Items by category or location. These items appear on pages designated. Number of Years of the Study. The number of years into the future for which expenditures are projected and reserve levels calculated. This number should be large enough to include the projected replacement of every item on the schedule, at least once. This study covers a 40-year period. Miller - Dodson Associates, Inc. Attachments - Page E4 Appendix One Time Deposit Required to Fully Fund Reserves. Shown on the Summary Sheet A1 in the Component Method summary, this is the difference between the Total Current Objective and the Reserves Currently on Deposit. Reserves Currently on Deposit. Shown on the Summary Sheet A1, this is the amount of accumulated reserves as reported by the Association in the current year. Reserves on Hand. Shown in the Cyclic Replacement and Normal Replacement Schedules, this is the amount of reserves allocated to each component item in the Cyclic or Normal Replacement schedules. This figure is based on the ratio of Reserves Currently on Deposit divided by the total Current Objective. Replacement Reserve Study. An analysis of all of the components of the common property of the Association for which a need for replacement should be anticipated within the economic life of the property as a whole. The analysis involves estimation for each component of its estimated Replacement Cost, Estimated Economic Life, and Estimated Life Left. The objective of the study is to calculate a recommended annual contribution to the Association's Replacement Reserve Fund. Total Replacement Cost. Shown on the Summary Sheet A1, this is total of the Estimated Replacement Costs for all items on the schedule if they were to be replaced once. Unit Replacement Cost. Estimated replacement cost for a single unit of a given item on the schedule. Unit (of Measure). Non-standard abbreviations are defined on the page of the Replacement Reserve Inventory where the item appears. The following standard abbreviations are used in this report: EA: each 6. FT: feet LS: lump sum PR: pair SF: square feet SY: square yard LIST OF RECOMMENDED REPAIRS - PROCEDURES A List of Recommended Repairs is offered as a supplemental report to the Replacement Reserve Study (at an additional fee) to assist the Association in understanding the financial implications of all items owned by the Association, not just the items included for funding by Replacement Reserves listed in the Replacement Reserve Inventory. The following information relates to the List of Recommended Repairs: • Repair costs. Cost range estimates given in the repair list assume that all work by a given trade will be done together as a single project. If repairs are done piece-meal, the costs would be significantly higher. The costs of any repairs to be funded out of the Reserve Fund should be subtracted from the Reserves Currently on Deposit figure. The Board or Property Manager should coordinate this decision with the Reserve Analyst as part of the revision process. • Completion of repairs. The Replacement Reserve Analysis assumes that all repairs cited in the Repair List will be completed within a twelve-month period of time. Estimated Life Left in the Replacement Reserve Study has been factored under this assumption. Any deletions or delays of the projects included in the List of Recommended Repairs may result in major inaccuracies in the Replacement Reserve Analysis. • Safety issues. If safety issues have been cited, they should be given the highest priority and should be done immediately upon receipt of this report. The Board must recognize that from a liability standpoint, they have been made aware of the existence of these unsafe conditions, if any, once the report is delivered for their review. • Unit costs. Nationally published standards and standard estimating manuals have been used in the development of this report. Contractor proposals or actual cost experience may be available as part of the Association records. We will adjust our figures to conform to your experience if the material or information is disclosed to us and/or made available for our use.