WORKSHOP W4.7 - New function for worn down building
Transcription
WORKSHOP W4.7 - New function for worn down building
14 WORKSHOP W4.7 - New function for worn down building Patchwork Square and public canteen with own greenhouse Intro Requirements This project is made by workshop W 4.7 and deals with the proposal for the use an abandoned office building made in 1955 with flat roof and 2 floors and full basement The façade is in red brick. Floor area: 1100 m2 Interviews with people in the local area revealed up to several wishes for the property’s future function. a dropin center for the elderly, a bazaar, a public kitchen and an expansion of the adjacent “Youth Club” Smedetoften 14 is located in the Northwest District of Copenhagen specifically Bispebjerg. The area is characterized by a mixed settlement and a multicultural community. ”Safe haven” is a place where all ages and ethnic origins will come to socialize in the: Youth Club Public kitchen with canteen Concept: The Square LOCATION Refurbishment The building Elder centre such as Bingo, knitting and coffee Club We believe that social sustainability has a mportant part for this area. Nordic living is to reinterpreting communities and reclaim public space Studios & Practice Rooms It is also necessary that the construction itself is sustainable. Functionality and architecture must go up into a higher unity, and lack of process has too often resulted in inappropriate approaches where construction and needs do not go “hand in hand”. Nevertheless, we expect that the process will lead to a good House, “a good alternative, and a better image for the municipality. Costs The estimated cost for refurbishment of the building is set to 15.000 kr. pr. m2. The estimated cost for building the greenhouse is set to 17.000 kr. pr. m2. Total: 20.427.000 kr. The House’s outer expression workshops A greenhouse on the rooftop the Square surrounds and embrase the area, functions and make a nice space for the users. A new 2 floor will be shooting up like a fresh architectural puff to the existing building and will be a greenhouse and a terrace for the kitchen as well as a place to hang out, relax and enjoy a meal. The estimated cost for a demolishing of the building is set to 400 kr. pr. m2. In the efforts to make the House more sustainable, the old façade in the future will appear with a cladding of the fiber cement. The estimated cost for building a new is set to 17.000 kr. pr. m2. A bazaar or a green market can during the week open on the square. WORKSHOP MUSIC Total: 21.690.000 kr. KITCHEN CANTEEN GROUNDFLOOR + SQUARE GREENHOUSE WORKSHOP TERRACE 1.FLOOR ROOFTOP 2.FLOOR PROCES BASEMENT OFFICES mindmaps functions floorplans sketches EECOWEEK W4.7 SME W DETOFTEN N KEA A W4.7 7 SM MED DETTOFTTEN N 14 4 Introducttion Location In connection with the event ""ECOWEEK" whicch is this spring h held at hagen, Copenhaggen Municipalityy has contributed to the KEA in Copenh provision of small 30 "projectss" whereby studeents from many p places in on in the construcction industry, caan the world, witth the Foundatio comprehend aand visualize susstainable solution ns to the tasks prresented. This project w was produced by group W 4.7 and d deals with the p proposal for the use of property Smedeetoften 14, for arround 3 years havve been empty. The prroperty which haas a flat roof and 2 floors and full basement, is ffrom 1955, and rrenovated in 197 75. The façade is in red brick with black joints. You cou uld say that the p property is typicaal for its ue 6. time and has preservation valu has been used for Office, trade, sttorage, includingg public The building h administration. 0 m2 Plot area: 550 Total buildingg area: 1100 m 2 + cellar With needs an nd costs as param meters in the deccision‐making pro ocess is obtained we h herewith this anaalysis. Smedetoften 14 4 is located in thee Northwest Distrrict of Copenhagen specifically Bispeebjerg. The area is characterized by a mixed settleement and apartment b buildings (built in n the 30s and 40ss), villa houses an nd small industrial buildings. The arrea has a very mixed population d must be consid dered as a multicultural society. composition and Not far from Sm medetoften, theree has been established a youth Ho ouse, together with th he existing culturral center on Dorrtheavej 61, it is planned that thee existing culturaal center is complemented by a new building contain ning a library and cultural center ffunction. The area is less w well located in reelation to public transport; the clo osest train station is B Bispebjerg station n and is approxim mately 1,100 metters from the area, aand however the bus service is fairly good, where bus 5A goes very freequently towardss Nørreport s‐train station. Assessme entoftheare ea TheHouse Interviews witth people in the local area revealed up to several wishes for the property's future functtion. This ranges from the desire for a n drop‐in center for the elderly, a bazaar, a public kitchen and an expansion of tthe adjacent "Youth Club". Theree must also be a ffocus on the users of th he building and Children's and d Youth Committtee of the municiipality was thereffore also prepared with h information on needs in this particular area. It iss this work teams believed that a co omplete and thorrough mapping o of what is eed to have" is haaving a nice balance "nice to have"" and what is "ne between thosse factors to meeet the different needs. ” Safe haven" is the concept, and d the House will act as a place theere will be across all ages aand ethnic originss in its shape of tthe lighthouse, w a place you com me to socialize. So o that the House should serve as: Club in association n with Smedetofften 12, young peeople Youth C in the arrea may have thee opportunity forr more activitiees and courses in the form of vaarious workshops. Public kitchen with canteeen. Bazaar o once a week indo oors and outside Elder acctivities such as B Bingo, knitting an nd coffee Club Studios & Practice Room ms Option ffor the holding courses, for exam mple, IT and cookiing. It is also necessaary that the consstruction itself is sustainable. Functionality an nd architecture m must go up into a higher unity, and d lack of process has to oo often resulted d in inappropriatte approaches wh here construction and d needs do not ggo "hand in hand". Nevertheless, we expect that the process will lead d to a good Housee, "a good alternative, and a better imaage for the municipality. Concept As mentioned d before, it is imp perative that needs, functionality,, economy and sustainability go oes hand‐in‐hand d as a red thread through With this, we beliieve that social su ustainability and this project. W functionality, got a bigger and more importantt as the project nd needs were id dentified. ”. Afterr interview from ccontact progressed an person of children and young people Committee, we have in th he team ng from received undeerstanding to maany young peoplee in the area fallin education and d feel rootless. In n this critical phase of their lives, it is important thaat someone pickss them up and heelp them safely in nto adult life and "off th he streets". We h have allowed ourrselves to think vvisionary on these areas. Connecting nr. 14 and nr. 12 w we picture a square embraced by a “Circle of trust” in ground levell consisting of a bolizing the assem mbly of patchwork of partly grass and pavement, symb ures. Whit in thiss circle people can interact and co om different cultu together in baazaars and other activities. TheHouse'souterex xpression In the efforts to make the Hou use more sustainable, the old façaade in ber cement. A neew 2 the future will appear with a ccladding of the fib ural puff to the exxisting floor will be shooting up like aa fresh architectu will be a greenho ouse and a terracce for the kitchen n as well building and w as a place to h hang out, relax and enjoy a meal. Thebuild ding’savailability 1.Floor The location o of the various fields of application n in the building will, of course, alwayys be a topic for d debate, but as a sstarting point, area connections aand functions, could the proximityy diagram look like this: Basement GroundFlo oor 2.Floor Areabudget A sustainable construction Each function in the diagram above is associated with an area assessment, and as shown there will be consistency among features. In subsequent area budget is a terms of sales needed. It is important to note here that since it has not been possible to talk with the building's future users, this have been estimates. As mentioned in the introduction, there is hinted to take the task, to make the building both structurally and socially sustainable. High importance on that construction should be able to pass an environmental global assessment. Therefore visualized that the building will be further isolated from the outside with façade bats. The foundations are insulated with polystyrene. Ground slabs the same. New low‐energy Windows and ventilation system with heat recovery Environment loads from the building must be minimized. There should, therefore, be looked at in the design: Choice of Materials Construction and supply methods Heating Principles Indoor Climate Waste water and waste management Program Offices Stairs Workshops Canteen Kitchen Hallways Serverroom Studio Technial rooms Depot Toilets Dayroom Greenhouse Bandrehersal Total 64 56 97 205 99 81 14 12 29 133 21 105 231 95 1242 Costs The estimated cost for refurbishment of the building is set to: 15.000 kr. pr. m2. The estimated cost for building the greenhouse is set to 17.000 kr. pr. m2. Total: 20.427.000 kr. The estimated cost for a demolishing of the building is set to 400 kr. pr. m2. The estimated cost for building a new is set to 17.000 kr. pr. m2. Total: 21.690.000 kr.