THE INCREMENTAL- DEVELOPMENT · SCHEME : A CASE STUDY

Transcription

THE INCREMENTAL- DEVELOPMENT · SCHEME : A CASE STUDY
TOLL- PLAZA
TIONAL HIGHWAY
THE INCREMENTALDEVELOPMENT
· SCHEME :
A CASE STUDY
OF KHUDA-KI-BASTI
IN HYDERABAD,
PAKISTAN
•
lslituto Univers1lario Architettura Venezia
CTS
POA
023
Servizio Bibliografico Audiovisivo
e di Documentazione
l'
THE INCREMENTAL-DEVELOPMENT SCHEME
•
A CASE STUDY OF KHUDA-KI-BASTI
IN HYDERABAD, PAKISTAN
•...I -
'
"I'"
~
• . .,,
-
' .
._,, 0
:
., ' :"' 1
United Nations Centre for Human Settlements (Habitat)
Nairobi, 1991
CONTENTS
PREFACE
ii
SUMMARY
iii
TABLE OF CONTENTS
vi
LIST OF TABLES
•
LIST OF FIGURES
Vi
vi
LISTOF ILLUSTRATIONS
vi
CONVERSION TABLE
vii
INTRODUCTION
1
I. SITES-AND-SERVICES SCHEMES
3
The sites-and-services concept
3
The principles of sites-and-services schemes
3
Some problems of sites-and-services schemes.
4
II. LOW-INCOME HOUSING IN KARACHI AND HYDERABAD
6
Housing conditions in Pakistan
6
The Metroville programme
6
Illegal subdivisions
11
Katchi abadi upgrading
13
BOX 1: THE BALDIA REGULARIZATION AND UPGRADING PROJECT
15
Ill. THE PRINCIPLES OF THE INCREMENTAL-DEVELOPMENT SCHEME
Land, people, works
I lligal subdivisions
Incremental development
17
17
18
19
IV. THE DEVELOPMENT OF KHUDA-Kl-BASTI
21
Hyderabad
21
The birth of Khuda-ki-basti
21
The first attempts
24
Working through the dallals
26
The reception area
The current procedure
26
27
Cost recovery
29
BOX 2: ISMAIL: MAKINGS OF A DALLAL
29
V. CURRENT CONDITIONS IN KHUDA-Kl-BASTI
31
The population of Khuda-ki-basti
31
Housing conditions
33
Infrastructure delivery
34
Public services
34
Community participation
36
v
VI. LESSONS FROM THE INCREMENTAL-DEVELOPMENT SCHEME
IN HYDERABAD
39
39
Reaching the target group
An alternative to illegal sub-divisions?
40
Improving housing conditions
41
Improving infrastructural conditions
41
Community participation
41
Project organization
41
Replicability
42
43
REFERENCES
"
LIST OF TABLES
Katchi abadis in Pakistan
6
2.
Initial proposal for Metroville I (197 4)
3.
Actual rates for Metroville I
7
7
4.
Status of sites-and-services schemes in 1984
11
1.
5.
Growth of katchi abadis in Karachi and Hyderabad
12
6.
Types of katchi abadis
14
7.
8.
9.
10.
Results of the Orangi Pilot Project
Monthly household income in Hyderabad, 1985 - 1986
21
Place .of origin of K,!luda-ki-basti residents
31
Occupation of head of household
32
11.
Mode of payment of head of household
32
12.
Income distribution in Khuda-ki-basti and Greater Hyderabad
32
16
13.
Investment in housing per household
33
14.
Infrastructure installed in Khuda-ki-basti
35
15.
Educational facilities in Khuda-ki-basti in 1988
35
LIST OF FIGURES
1.
2.
3.
4.
5.
6.
7.
8.
9.
9
Karachi
Typical utility-wall housing
10
Processes of housing delivery
20
Hyderabad
22
Gulshan-e-Shahbaz
23
A sector of Khuda-ki-basti
25
Procedure for securing a plot
28
Sector E-4 with infrastructural development
38
LIST OF PHOTOGRAPHS
1.
2.
3.
4.
5.
8
The Karachi region
•
Unoccupied plots in the Gulshan-e-Shahbaz sites-and-services scheme
24
Houses in an illegal s~-division near Khuda-ki-basti
24
Bus stop and entrance to Khuda-ki-basti
27
Reed huts in the reception area
29
Supplier of building materials
29
vi
6.
One of the main streets in Khuda-ki-basti
29
7.
Semi-permanent house
30
8.
Permanent double-storeyed house
30
9.
10.
Unpaved street in Khuda-ki-basti
34
Commercial street in Khuda-ki-basti
34
11.
The informal sector: a shoemaker
36
12.
Coffee shop in Khuda-ki-basti
36
13.
Permanent rooms in the reception area
14.
Permanent and semi-permanent houses in sector E-4
36
15.
A main street in Khuda-ki-basti
39
16.
Private vans used for transport to Hyderabad and Kotri
39
•
CONVERSION TABLE
$US1 =Pakistan Rs9.9 (1974)
$US1 =Pakistan Rs21.3 (1990)
1 square yard = 0.8361 square metre
1 acre= 4047 square metres
vii
36