Preliminary Engineering Report
Transcription
Preliminary Engineering Report
City of Port Orford Water Supply Expansion Phase I – Distribution System Phase II – Hubbard Creek Impoundment City of Port Orford Water Supply Expansion Presented by: City of Port Orford SHN Consulting Engineers & Geologists, Inc. Water Supply Expansion Project Acknowledgements: Oregon Infrastructure Finance Authority (Community Development Block Grant). Technical Assistance Grant Oregon Water Resources Department USDA Rural Utilities Services – TA Grant Rural Community Assistance Corporation City of Port Orford City Council Water Supply Status 2005 Water Master Plan Shortage of Raw Water Supply Alternatives to Expand Source N. Fork Reservoir Expansion New (additional) North Fork Reservoir Garrison Lake Do Nothing Water Loss (Yr 2000 @ 22%) Water Loss (Yr 2010 @ 57%) Opinion of Probable Cost Phase 1--Distribution System Phase 2--Reservoir $ 13,145,000 $ 3,829,000 Application in to USDA RUS for ARRA Funding for $ 14,000,000 *Based on Preliminary Engineering Report Distribution Phase 1 Phase I Water Distribution System Improvements Water distribution system leaks Distribution system piping System consists of 15 miles of water lines 12 miles of Asbestos Cement pipe 3 miles a mix of PVC and other pipe Oldest located (so far) is from 1926 Most was installed in the 1950s and 1960s 6 Distribution system pump stations pump stations, necessary due to terrain Portions of system less than 20 psi No capacity to allow additional connections to some of the pump stations No fire flow in higher elevation areas Age of pump stations causing maintenance problems (parts availability, reliability etc.) Types of System Failures Phase 2 Reservoir Expansion Water Supply Status 2010 Situation Critical Shortage of Raw Water Supply Alternatives to Expand Source N. Fork Reservoir Expansion New (additional) North Fork Reservoir Garrison Lake Do Nothing Water Loss (Yr 2009 52% - Yr 2010 @ 57%) Less Than Average Year – Requires Conservation N. Fork Hubbard Creek Reservoir N. Fork Hubbard Creek Reservoir Water Supply Status 2010 Situation Critical Shortage of Raw Water Supply Distribution System is Failing Continue Leak Detection and Repair Water Loss (Yr 2010 @ 57%) PER/EA – Evaluation of Expanding Source Replacing Distribution System Expansion of N. Fork Reservoir Funding Applications Water Consumption Practices Recommendations Reduce Water Losses to Less than 10% Replace Distribution System Implement Conservation During Drought (15% Reduction in Water Usage) Expand Existing Impoundment 59 acre-feet (19.4 Million Gallons) 38 foot Dam Height Release Minimum Stream Flow - 0.14 cfs Phase II – Expanded Reservoir Proposed Earthen Dam Section of Proposed Dam & Intake Section of Proposed Dam and Primary Spillway Current Water Rates 2010 Base rate, incl. first 2000 gallons $27.08 2001-5000 gallons $6.49 5001-10000 gallons $8.49 10001-20000 gallons $9.49 20001 + gallons $10.49 Water bill calculation Usage 4400 gallons Base rate $27.08 2400 gallons @ 6.49/M $15.58 Total bill this customer $42.66 Wastewater Rates Base Rate (no gallons included) Usage rate per thousand gallons $37.08 $6.13 Wastewater Bill Calculation Usage 4400 gallons Base Rate Usage (at $6.13/thousand gallons) Total for this customer $37.08 $26.97 $64.05 “Average Customer” water and waste water bill Average customer 4400 gallons of water/wastewater per month. Water Bill Wastewater Bill $42.66 $64.05 Total bill for “average” customer $106.71 Water system operating budget Personal Services Materials and Services(O & M) Annual debt service Total Costs to operate water system FY2010 revenue (charge for water) Net loss for FY2010 $183,760 $109,631 $72,450 $365,841 $342,368 <23,480> Water system total usage 667 utility accounts Average use per account 4400 gallons/ month Average amount of water sold/month 2,488,814 2010 total data Total water treated for the year 67,493,004 Total water sold for the year 29,865,768 Total water fund revenue 667 connections @ $27.08 2400 gallons X 6.49/M X 667 Total revenue generated $216,748 $124,702 $341,450 Water system (only) debt Water system debt principal $348,495 Water system debt interest $67, 529 Debt total for water only $416,024 Distribution system (phase 1) funding package Grant funds CDBG $1.895 M USDA $1.250 M Loan funds SDW USDA $6.0 M $4.0 M Total package $13.145 M Payment and interest calculations $4,000,000 loan amount, 3.5% interest, 40 years $6,000,000 loan amount, 1% interest, 30 years Rate based payback Payment is 419,797.81 per year, or approximately $52.45 per customer per month. Total water (only) bill for this scenario is $94.45 Property Tax based payback General Obligation, 100,000,000 assessed value $4.1980 per thousand of assessed value Payment based on $6M General Obligation bond and $4M Revenue Bond General Obligation bond $2.3249 per thousand of assessed value. Revenue Bond requires rate increase of $23.40 per month per customer. COUNCIL DECISION REQUIRED: If the vote for either the general obligation bond fails, or the revenue bond fails, the project cannot be completed. Both MUST pass in order for the funding package to be viable. This ends the presentation