tanger automotive city

Transcription

tanger automotive city
Turin, October 28th 2015
TANGER MED: A STRATEGIC LOCATION
The Straits of Gibraltar: 100 000 ships annually 20% of worldwide container traffic
Cross-roads of shipping lines: East-West & North-South (0 deviation)
Detroit de
Gibraltar
TANGER MED: A STRATEGIC LOCATION ENHANCING LOGISTIC COMPETITIVENESS
40 regular services  150 ports  56 countries  5 continents
The Straits of Gibraltar:
100 000 ships annually
20% of worldwide
container traffic
Cross-roads of shipping
lines:
East-West & North-South
(0 deviation)
TANGER MED: STATE OF ART INFRASTRUCTURE

8 Mil+ TEUs annual handling capacity

EUR 3.5 billion public / private investment

1 Mil vehicles per annum

5 Mil tons of Oil products

7 Mil passengers

700 K trucks

End to end length: 9 km

Water depth: 16 to 18 m
TANGER MED INDUSTRIAL PLATFORM
Industrial, logistics and commercial hub
built on strong fundamentals :
 600 active companies
 Over 4 BEUR of export
 More than 2 BEUR private investment
 Large car manufacturing facility
 Land reserves of 3000 Ha
 Strategic location at cross roads between Europe and Africa
 State of the art infrastructure offering
 Industrial, Logistics and services oriented zones under the
supervision of one operator
 Free Zone Status in conjunction with sounds investment
incentives
 Reference international players
 Large land reserves offer long term development perspective
 Large range of services
AUTOMOTIVE IN TANGER MED ZONES
Automotive activities in Tanger Med Zones

80 Automotive supplier

More than 30'000 jobs

More than 7 Mdhs private investment

70% of the Export turnover for Automotive:


Total Automotive Export at TFZ 1779 MEUR
Total Export at RTM 1500 MEUR
Acess to large
market
ALREADY ESTABLISHED IN TANGER MED AUTOMOTIVE PLATFORM
New Installation
KANSAI PAINT
TANGER AUTOMOTIVE CITY – SKILLED HUMAN RESOURCES
Work force availability
Total available in Tangier
77.190
Total available in Tetouan
21.240
Total available in Morocco
480.368
Available work force in Fahs Anjra
High school level
Total High school graduated
Techniciens
Diplôme de qualification professionnelle
Certified technicien
Total Graduated from OFPPT
University degree – Bachelor
University degree – Master
University degree – PhD
Engineer
TOTAL Graduated from University
Total
1342
995
456
349
70
875
243
275
46
22
586
TOTAL graduated in 2014
4.087
Total available in Fahs Anjra
13.700
Figures of 2014 provided by ANAPEC
Monthly Net Paid
Cost for the
company
Operator
220 €
280 €
Team Leader
400 €
500 €
Quality inspector
400 €
500 €
Warehouse handler
360 €
450 €
Maintenance technician
750 €
1050 €
Supervisory shift
1300 €
1900 €
HR Responsible
1600 €
2350 €
Category
Max Total cost including: bonus, taxes, transportation, catering…
TANGER MED INDUSTRIAL PLATFORM – ENHANCING LOGISTIC COMPETITIVENESS
Freight From TAC/ to
Costs per Trailer
Madrid
1.450 €
Barcelone
1.600 €
Vigo
1.700 €
Bremen / Straubing
3.450 €
St Nazaire
Pauillac
Morocco Transport Infrastructure Map
Gènes
Livourne
Sète
Barcelone
Naples
Tunis
Tanger Med
Existing services:
Number of calls / year: 8 500 calls
- Tanger Med – Algesiras : 45 mn
more than 49 dep / day.
On-going projects:
- Tanger Med – Sète : 36 h
- Tanger Med – Barcelone : 26 h
- Tanger Med – Genova : 41 h
- Vigo
- Malaga
- Marseille
TANGER AUTOMOTIVE CITY – DEDICATED INDUSTRIAL PLATFORM
TANGER AUTOMOTIVE CITY – DEDICATED INDUSTRIAL PLATFORM
TAC - Automotive Logisitic Platform
TAC - Automotive Logistic Platform
"Automotive Logistic Platform" project aims mainly to consolidate logistic flows that can meet growing needs of the
automotive industry .
Logistic operation
Grouping
Handling (empty
packaging)
Storage
Cross-dock
Packaging
Distribution
Consolidated Flows
Direct Flows
Reception of parts in small packages that grouped / consolidated in
predefined packaging of the customer – ready for delivery
Management of « cross-dock » platform: reception of part and
expedition using same packaging without any changes or conditioning
or added value
Flow with Packing
Mixed Flows
Reception of packaged parts and packing /conditioning in customized
packaging of downstream flows and conveyance.
Process that includes both consolidation and conditioning that allow
tailored packaging solution for each parts to be delivred to the clients
Automotive Logistic Platform - Objectives
TAC - Automotive Logistic Platform
Land area
67 400 m²
Construction project
Phase 1 (25%)
8 438 m²
Phase 2 (25%)
8 438 m²
Phase 3 (50%)
16 815 m²
Storage area and reception zone
A1 Warehouse
A2 Reception area – docking
Offices and social facilites
B1 Adminsitraion / offices
B2 Social facilities (changing rooms, WC)
B3 Local drivers rest + sanitary
Other facilites
C1 Loading area
C2 Heat and AC
C3 PT + TGBT
C4 Electric transformer
C5 Technical area for sprinkler
C6 Maintenance
C7 Security
Landscaping - exterior
D1 Parking
D2 Maneuvering area to docks
D3 Exterior circulation
TAC - Automotive Logistic Platform
TANGER AUTOMOTIVE CITY SUPPORTING ITALIAN INDUSTRIAL SETTLEMENT
►ITALIAN SQUARE :
Land area = 7ha,
Industrial building from 1.500 m²
Sale of land
Sale, rent of beskope buildings
►Customised service offering :
One stop-shop for all procedures
Italian speaking services
All in one service approach
Aid for implementation, hiring, training,
logistic …
►Dedicated Plateform :
Production area,
Warehouse, storage
Oficces,
Comprehenssive real estate offer
TANGER AUTOMOTIVE CITY PROCEDURE OF INSTALLATION
Application for installation
Delivery of the authorization of
installation by the regional commission
Signature of the sale contract
Signature of the Leasing contract
Application for the operating license
Registration of the sale operation – Land
deed registry
Application for the construction permit
Construction Permit certificate
Application for the operating License
Certificate for conformity of constructions
Operating license
TAC undertaking
Investor undertaking
Start-up of activity
AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY
UNDERTANDING BUSINESS REQUIREMENTS
AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY
DEDICATED LAND AREA
Assigned location
Total land area = 48.560 m²
Total Built area = up to 29.000 m²
AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY –
COMMERCIAL PROPOSAL
Phase 1
Land plot
Total area m²
94
8.490
95
8.584
96
6.124
97
8.877
Total
32.075 m²
Land Price per m²
55 €
Total
1.764.125 €
Phase 2 : Project extension
Land plot
Total area m²
92
8.979
93
7.406
Total
16.385 m²
Land Price per m²
55 € *
Total
901.175 €
* Price applicable if reservation in 2015
AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY
ESTIMATE HYPOTESIS
AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY
ESTIMATE HYPOTESIS
AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY
COMPREHENSIVE REAL ESTATE OFFER
Sale of vacant land
PHASE 1
Land plot
Phase 1
Phase 2
Total
32.075 m²
16.385 m²
15.000 m²
Land Price per m²
55 €
55 € *
3.500 m²
Total
1.764.125 €
901.175 €
Total Land area
32.075 m²
Total Built area –
Production hall & facilities
Total Built area –
Administration
* Price applicable if reservation in 2015
PHASE 2
Total Land area
Total Built area –
Production hall & facilities
CONSTRUCTION PROJECT
16.385 m²
10.000 m²
PHASE 1
PHASE 2
Architecture, Design, Engineering,
geotechnical study, Authorization Fees…
436.400 €
36.400 €
Administration & Offices
964.600 €
14.680 €
Civil Work
6.302.400 €
3.212.500 €
Technical facilities
1.740.000 €
545.000 €
420.000 €
120.000 €
9.863.400 €
3.928.580 €
External works
TOTAL
LEASING OPTION
 Lease contract duration : 10 years
 Triennial review of rent price : 10 %
 Leasing Partner: Institutional Moroccan pension Fund (Volume for
investment 4 Bn €)
 Taxes & insurances not included
INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY – PROJECT PLAN
Thank you for your
attention
[email protected]
www.tac.ma