tanger automotive city
Transcription
tanger automotive city
Turin, October 28th 2015 TANGER MED: A STRATEGIC LOCATION The Straits of Gibraltar: 100 000 ships annually 20% of worldwide container traffic Cross-roads of shipping lines: East-West & North-South (0 deviation) Detroit de Gibraltar TANGER MED: A STRATEGIC LOCATION ENHANCING LOGISTIC COMPETITIVENESS 40 regular services 150 ports 56 countries 5 continents The Straits of Gibraltar: 100 000 ships annually 20% of worldwide container traffic Cross-roads of shipping lines: East-West & North-South (0 deviation) TANGER MED: STATE OF ART INFRASTRUCTURE 8 Mil+ TEUs annual handling capacity EUR 3.5 billion public / private investment 1 Mil vehicles per annum 5 Mil tons of Oil products 7 Mil passengers 700 K trucks End to end length: 9 km Water depth: 16 to 18 m TANGER MED INDUSTRIAL PLATFORM Industrial, logistics and commercial hub built on strong fundamentals : 600 active companies Over 4 BEUR of export More than 2 BEUR private investment Large car manufacturing facility Land reserves of 3000 Ha Strategic location at cross roads between Europe and Africa State of the art infrastructure offering Industrial, Logistics and services oriented zones under the supervision of one operator Free Zone Status in conjunction with sounds investment incentives Reference international players Large land reserves offer long term development perspective Large range of services AUTOMOTIVE IN TANGER MED ZONES Automotive activities in Tanger Med Zones 80 Automotive supplier More than 30'000 jobs More than 7 Mdhs private investment 70% of the Export turnover for Automotive: Total Automotive Export at TFZ 1779 MEUR Total Export at RTM 1500 MEUR Acess to large market ALREADY ESTABLISHED IN TANGER MED AUTOMOTIVE PLATFORM New Installation KANSAI PAINT TANGER AUTOMOTIVE CITY – SKILLED HUMAN RESOURCES Work force availability Total available in Tangier 77.190 Total available in Tetouan 21.240 Total available in Morocco 480.368 Available work force in Fahs Anjra High school level Total High school graduated Techniciens Diplôme de qualification professionnelle Certified technicien Total Graduated from OFPPT University degree – Bachelor University degree – Master University degree – PhD Engineer TOTAL Graduated from University Total 1342 995 456 349 70 875 243 275 46 22 586 TOTAL graduated in 2014 4.087 Total available in Fahs Anjra 13.700 Figures of 2014 provided by ANAPEC Monthly Net Paid Cost for the company Operator 220 € 280 € Team Leader 400 € 500 € Quality inspector 400 € 500 € Warehouse handler 360 € 450 € Maintenance technician 750 € 1050 € Supervisory shift 1300 € 1900 € HR Responsible 1600 € 2350 € Category Max Total cost including: bonus, taxes, transportation, catering… TANGER MED INDUSTRIAL PLATFORM – ENHANCING LOGISTIC COMPETITIVENESS Freight From TAC/ to Costs per Trailer Madrid 1.450 € Barcelone 1.600 € Vigo 1.700 € Bremen / Straubing 3.450 € St Nazaire Pauillac Morocco Transport Infrastructure Map Gènes Livourne Sète Barcelone Naples Tunis Tanger Med Existing services: Number of calls / year: 8 500 calls - Tanger Med – Algesiras : 45 mn more than 49 dep / day. On-going projects: - Tanger Med – Sète : 36 h - Tanger Med – Barcelone : 26 h - Tanger Med – Genova : 41 h - Vigo - Malaga - Marseille TANGER AUTOMOTIVE CITY – DEDICATED INDUSTRIAL PLATFORM TANGER AUTOMOTIVE CITY – DEDICATED INDUSTRIAL PLATFORM TAC - Automotive Logisitic Platform TAC - Automotive Logistic Platform "Automotive Logistic Platform" project aims mainly to consolidate logistic flows that can meet growing needs of the automotive industry . Logistic operation Grouping Handling (empty packaging) Storage Cross-dock Packaging Distribution Consolidated Flows Direct Flows Reception of parts in small packages that grouped / consolidated in predefined packaging of the customer – ready for delivery Management of « cross-dock » platform: reception of part and expedition using same packaging without any changes or conditioning or added value Flow with Packing Mixed Flows Reception of packaged parts and packing /conditioning in customized packaging of downstream flows and conveyance. Process that includes both consolidation and conditioning that allow tailored packaging solution for each parts to be delivred to the clients Automotive Logistic Platform - Objectives TAC - Automotive Logistic Platform Land area 67 400 m² Construction project Phase 1 (25%) 8 438 m² Phase 2 (25%) 8 438 m² Phase 3 (50%) 16 815 m² Storage area and reception zone A1 Warehouse A2 Reception area – docking Offices and social facilites B1 Adminsitraion / offices B2 Social facilities (changing rooms, WC) B3 Local drivers rest + sanitary Other facilites C1 Loading area C2 Heat and AC C3 PT + TGBT C4 Electric transformer C5 Technical area for sprinkler C6 Maintenance C7 Security Landscaping - exterior D1 Parking D2 Maneuvering area to docks D3 Exterior circulation TAC - Automotive Logistic Platform TANGER AUTOMOTIVE CITY SUPPORTING ITALIAN INDUSTRIAL SETTLEMENT ►ITALIAN SQUARE : Land area = 7ha, Industrial building from 1.500 m² Sale of land Sale, rent of beskope buildings ►Customised service offering : One stop-shop for all procedures Italian speaking services All in one service approach Aid for implementation, hiring, training, logistic … ►Dedicated Plateform : Production area, Warehouse, storage Oficces, Comprehenssive real estate offer TANGER AUTOMOTIVE CITY PROCEDURE OF INSTALLATION Application for installation Delivery of the authorization of installation by the regional commission Signature of the sale contract Signature of the Leasing contract Application for the operating license Registration of the sale operation – Land deed registry Application for the construction permit Construction Permit certificate Application for the operating License Certificate for conformity of constructions Operating license TAC undertaking Investor undertaking Start-up of activity AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY UNDERTANDING BUSINESS REQUIREMENTS AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY DEDICATED LAND AREA Assigned location Total land area = 48.560 m² Total Built area = up to 29.000 m² AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY – COMMERCIAL PROPOSAL Phase 1 Land plot Total area m² 94 8.490 95 8.584 96 6.124 97 8.877 Total 32.075 m² Land Price per m² 55 € Total 1.764.125 € Phase 2 : Project extension Land plot Total area m² 92 8.979 93 7.406 Total 16.385 m² Land Price per m² 55 € * Total 901.175 € * Price applicable if reservation in 2015 AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY ESTIMATE HYPOTESIS AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY ESTIMATE HYPOTESIS AUTOMOTIVE INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY COMPREHENSIVE REAL ESTATE OFFER Sale of vacant land PHASE 1 Land plot Phase 1 Phase 2 Total 32.075 m² 16.385 m² 15.000 m² Land Price per m² 55 € 55 € * 3.500 m² Total 1.764.125 € 901.175 € Total Land area 32.075 m² Total Built area – Production hall & facilities Total Built area – Administration * Price applicable if reservation in 2015 PHASE 2 Total Land area Total Built area – Production hall & facilities CONSTRUCTION PROJECT 16.385 m² 10.000 m² PHASE 1 PHASE 2 Architecture, Design, Engineering, geotechnical study, Authorization Fees… 436.400 € 36.400 € Administration & Offices 964.600 € 14.680 € Civil Work 6.302.400 € 3.212.500 € Technical facilities 1.740.000 € 545.000 € 420.000 € 120.000 € 9.863.400 € 3.928.580 € External works TOTAL LEASING OPTION Lease contract duration : 10 years Triennial review of rent price : 10 % Leasing Partner: Institutional Moroccan pension Fund (Volume for investment 4 Bn €) Taxes & insurances not included INDUSTRIAL SETTLEMENT AT TANGER AUTOMOTIVE CITY – PROJECT PLAN Thank you for your attention [email protected] www.tac.ma