Earthworks - TKL Group

Transcription

Earthworks - TKL Group
EARTHWORKS
Earthworks
TKL Earthworks has earned a reputation for
reliability over the past 8 years in the Construction
Industry operating over a wide geographical area.
This has been achieved and retained by an ever
increasing attention to planning, organisation and
management in every stage of the contract with
the aim of giving total satisfaction to the Client and
his professional team.
This approach has led on many occasions to repeat
orders, and of equal importance to our company
name being passed on, which in turn assists
ourselves in maintaining a suitable workload.
The common factor across each of our divisions is
the focus on Earthmoving where TKL has a proven
track record in recent Industrial, Commercial and
Residential Developments.
Client
Contract
Contract Value
Outline of works
Clugston
Construction
Redhouse
Doncaster
£1,635,000
Topsoil strip, bulk earthworks
ground engineering, land drainings
On site production of aggregates.
Clugston
Construction
Immingham
£1,600,000
Site clearance,Topsoil removal
cut/fill, supply and lay of bulk fills
Bowmer &
Kirkland
DIRFT, Daventry
£785,000
Site Clearance, Bulk Earthworks
Tolent
Construction
Railport,
Doncaster
£1,400,000
Moving 450,000m3 of material on
site, Importing 1000,000 tonne of
150mm clean stone.
Thyssen
Construction
River Rother
Orgreave
£800,000
Creating new river course moving
450,000m3 in 12 weeks, laying
geotextile, laying RIP RAP
Bernhards
Landscapes
Earthcentre
Doncaster
£83,500
Excavate & Clay line agricultural
pond, Import 3000m3 clay
Quarmby
Construction
Crystal Peaks
Sheffield
£400,000
Bulk earthworks
Supply and lay hardcore, sub bases etc
JF Finnegan
B&Q Warehouse
Darnall, Sheffield
£455,000
Demolition of former bus depot
Decontamination of site
Excavate & filling on site - 50,000m3
crushing concrete/buildings - 30,000m3
importation of bulk fill
(Class 1A) - 15,000m3
REMEDIATION
Remediation
A major amount of our excavation and earthworks revolves around the highly specialised land remediation sector. Our company has carried out several major colliery land remediation schemes and numerous
brownfield site redevelopments.These works include dealing with special waste, processing or
concrete / unsuitable materials, ground engineering and ground remodelling in preparation for
redevelopment / landscaping.
Processing of Materials
Contaminated Land
One of our abilities at TKL is the processing of
materials to the highest specification on site.We
have developed three principle stages to enable
material to be processed promptly:
TKL deal with all types of special waste and have
vast amounts of experience treating contaminated
materials by various methods:
1. Off site disposal to a licensed land fill site
2. On site treatment i Encapsulation within an
engineered cell
ii Bioremediation techniques
To ensure safe practice COSHH assessments, risk
assessments and method statements are of paramount importance to provide protection for both
the workforce and the general public.
TKL are registered carriers of waste therefore all
off site works can be undertaken in-house. Off site
works are carried out under both Duty of Care and
current Environmental Protection Act Legislation
1. Screening
2. Crushing of reinforced concrete to class 6f2,
DOT and MOT Type1 specification
3. Recompaction of fill materials to above 95%
of the maximum dry density
Client
Contract
Contract Value
Outline of works
JF Finnegan
Matalan
Cortonwood
£200,000
Lime Stabilisation
Remediation Works
Persimmon
Homes
Birkinshaw
Bradford
£200,000
Remediation of former ash tip
for new housing estate
MJ Gleeson
Devonshire
Green,
Sheffield
£485,000
Ground Remediation
Site Clearance
Decontamination
Removal off Site
Thyssen
Construction
Bentley
Reclamation
Doncaster
£1,940,000
Remoulding Colliery Tip
excavating Mounds &
Watercourses.
Cultivating soils with lime &
bio pellets
Importing 140,000m3 topsoils
Constructing 6 km internal
roads & footpaths.
Simons
Construction
Sweet Street
Leeds
£300,000
Remediation of
contaminated ground
REMEDIATION
(cont)
Remediation
(cont)
Client
Contract
Contract Value
Outline of works
Thyssen
Construction
Adtranz, Crewe
£250,000
Ground Remediation
Breaking out obstructions
Crushing 20,000m3
Lovell
Warmsworth
Doncaster
£250,000
Site Remediation and infilling
works. Materials processing
from former landfilling works.
JF Finnegan
Broadfield Rd
Sheffield
£250,000
Site Remediation and
Decontamination of former
industrial area
Bulk earthworks and
material processing
Persimmon
Homes
Old Churwell
Leeds
£150,000
Site Remediation of former scrap
yard, tannery and piggeries
Marshall
Construction
Castlegate
Wakefield
£58,000
Site Remediation
Site Clearance
Taywood
Homes
Farnley, Leeds
£300,000
Site Remediation of former quarry
for new build of 150 houses
Thyssen
Construction
Hickleton
Colliery
£675,000
Remediation of former
Hickleton colliery
Grubbing out existing foundations
Processing materials for re-use
Bowmer &
Kirkland
B&Q Distribution
Manton,Worksop
£1,300,000
Site Clearance
Remediation of mine workings
(processing natural &
artificial materials)
Bowmer &
Kirkland
New Sainsbury
Supermarket
Oldham
£1,200,000
Site Remediation of former
gas works.
Processing 50,000m3 of
material on site
DEMOLITION
Demolition
TKL is a well known and respected company within
the Demolition Industry within the North of
England.
We provide a full demolition to sites in industrial,
Commercial and Residential Developments and take
great pride in providing total satisfaction to the
Clients requirements and personal attention to
detail on a natiowide basis.
We have an extensive fleet of modern specialist
demolition equipment including high reach
excavators with a reach of upto 26m.The machine
are of the latest technology fitted with in-cab
cameras, equipped with concrete crushers and
sheer attachments.
All our Companys experienced demolition
operatives have completed NFDC Training and are
fully conversant with the Health and
Safety requirements.
Client
Contract
Contract Value
Outline of works
Persimmon
Homes
Folkwood School
Sheffield
£175,000
Demolition of former school
On site processing & recycling
Formation of new sports pitch
Barratt
Sheffield
Co-op Dairies
Sheffield
£325,000
Demolition of former factory
buildings. Recycling of materials
Asbestos Removal
Henry Boot
Management
Staffordshire
Tableware,
Stoke-On-Trent
£460,000
Demolition of warehouse plus
6 other buildings on 10 acre site
Notifiable Asbestos &
Ceramic fibres
Crushing & Ground Engineering
MJ Gleeson
Holmfirth
£125,000
Demolition of former mill complex
MJ Gleeson
Nether Edge
Hospital
Sheffield
£646,000
Demolition of various buildings of
the old hospital site 10,000m3
of crushing
Internal strip out of listed buildings
Bramall
Construction
Swarcliffe, Leeds
£284,000
Demolition of two tower blocks
and crushing 4,000m3. Installation
of concrete foundation system of
new developments
David Wilson
Homes
Totley, Sheffield
£450,000
Demolition of multi-storey former
campus using explosives
Crushing to MOT Type 1 Notifiable
asbestos stripping
Simons
Sweet Street
£300,000
Demolition of ex council depot,
Multi-storey structures
Remediation of contaminated ground
Ackroyd &
Abbott
Lincoln Green
£386,000
Demolition of housing & maisonettes
Taywood
Homes
Farnley, Leeds
£300,000
Demolition of steel portal framed,
asbestos clad buildings
GROUNDWORK
FOUNDATIONS
& DRAINAGE
Groundwork
Foundations
& Drainage
From the Companys core skill in the Earthmoving
Market has emerged a Specialist Contractor
focusing on the Clients requirements for a
company to carry out Demolition, Remediation,
Excavation and Groundworks as a single package.
The current shifts in planning have seen a boom in
the development of former Industrial sites.
The TKL business supported by its inhouse
Geotechnical Team and Civil Engineeers has
developed a Groundworks team to enable us to
deliver the specific needs of the development of the
Client.
Staffed by a permanent team dedicated to this
initiative,TKL specialises in contracts involving the
installation of roads and sewers together with
building the substructures up to damp proof course.
This service is carried out on a lump sum all risk
basis or on the more traditional re-measure.
Our Groundworks Division also specialises in Earth
Retaining Walls and Slope Stabilisation Works and
offer the service of providing the most cost
effective solution, design and warranty for all types
of structures.
Client
Contract
Contract Value
Outline of works
Haslam
Homes
Grimethorpe
Regeneration,
Barnsley
101 New Build
£2,000,000
Bulk Excavation, Roads and Sewers
Plot Works upto
Damp Proof Course
Bramall
Construction
Springhill Close,
Scarborough
£250,000
Asbestos Removal
Demolition
Bulk Excavation
Roads and Sewers
EARTH
RETAINING
WALLS
Earth
Retaining Walls
As a forward thinking company TKL Earthworks
have adapted to the ever changing demands of the
construction industry.With the development of
new technology we can offer cost effective earth
retaining solutions.
TKL have the ability to design a package individual
to the clients requirements.We are delighted to
offer the following earth retaining wall solutions:
• Reinforced Earth Wall Galvanised Straps technique
• Gabion Basket Walls Stoned Faced/Timber Faced
• Reinforced Slope Stabilisation Geotextile Reinforcement
• Timber Permacrib Retaining Walls
There are a number of advantages to using our
earth retaining walls. Not only are they cost
effective, but on site materials can be crushed and
utilised which reduces time and manpower. Earth
retaining walls are uncomplicated to assemble and
because of their flexibility can be tailored to each
individual contract irrelevant of ground conditions.
Our commitment to customer care is reflected in
our dedication to offering warranties for earth
retaining walls assembled.
Client
Contract
Contract Value
Outline of works
Frank Haslam
Milan
Cheddington
Grove, Bradford
£65,000
Gabion Basket Retaining Wall;
150m in length, 3m high
Frank Haslam
Milan
Cross Catherine
Street, Leeds
£30,000
Gabion Basket Retaining Wall
to rear gardens; 100m in length,
1-1.45m high
Face of wall local natural stone &
hand placed
Frank Haslam
Milan
Wood Lane
Huddersfield
£55,000
Gabion Basket Retaining Wall to
retain adjacent road & form rear
gardens; 100m in length &
3.5m high
Recycling materials on site
Bernhards
Landscapes
Wakefield
5 Wiers Walk,
Attercliffe,
Sheffield
£125,000
Foundation built on river bed of
River Don & gabion basket mattress
used as the foundation to the wall
Allen Homes
Pudsey, Leeds
£45,000
Construction of timber faced Gabion
Basket wall along the banks of a local
river, retaining car parking
for the development
Bramall
Construction
Quarry Mount,
Scarborough
£50,000
Gabion Basket Retaining wall to
rear gardens; 150m in length &
3m high
RECYCLING
Recycling
TKL are proud to introduce their new 8 acre
Recycling Facility based at Wath-Upon-Dearne,
Rotherham. Our station includes a 32,000 square
foot building which houses new state of the art
recycling technology imported from Holland.
The Waste Recycling facility offers a comprehensive
range of waste disposal and recycling services,
managed by qualified personnel whose experience
ensures that all operations are handled efficiently,
cost effectively and with the minimum disruption to
the Clients business.
Our ability to remove, sort and recycle
construction & demolition waste means that by
using TKL Recycling you can save significant expense
on waste disposal charges. Our aim at all times is to
offer practical and environmentally sound solutions
to your Waste Management problems with limited
material going to landfill.
Licensed Waste Transfer Station
TKL recently purchased over £2,000,000 of new
state of the art recycling technology including a
Redox Sorting Station which includes a 40 foot
12 person picking station, several screens and wind
shifters together with mobile crushers and screens.
This set up allows our site to process construction
and demolition waste to produce recycled
aggregates to DOT Specification.The products
also include crushed brick and Type 1 concrete
Class 6F2, 6F1 and Class 4A and 5A bulk fill.
Timber, plastic and metals are all separated and
taken away for recycling. Our current success rates
are over 94%
Skip Hire
TKL have purchased a fleet of roll on, roll off skip
wagons and have over 500 skips in circulation from
which the Client may select the size and type that
meets their needs.
TKL offer an efficient and reliable service that will
solve all your Waste Management problems.