06-12-13 AMENDED Agenda Packet
Transcription
06-12-13 AMENDED Agenda Packet
111 E. COMMERCIAL STREET WILLITS, CALIFORNIA 95490 (707) 459-4601 TEL (707) 459-1562 FAX WILLITS CITY COUNCIL AMENDED AGENDA JUNE 12, 2013 ♦ 6:30 P.M. ♦ COUNCIL CHAMBERS 1. OPENING MATTERS – a) Call to Order; b) Pledge to Flag; c) Roll Call 2. PUBLIC MATTERS a. Introduction of Willits Police Department’s New K-9 Officer – “Doc” b. Proclamation Designating Western Wear Days June 23rd Through July 4th, 2013 c. Recognition of Willits Airport Commissioners and Volunteers for their Dedicated Service and Many Contributions d. Noticed Public Hearing to Conduct Annual Review of Rates and Charges for Various City Services and Adopt a Resolution Approving Changes in Certain City Fees and Charges, Effective July 1, 2013 e. Discussion and Possible Direction Regarding Fiscal Year 2013/2014 Draft Budget f. Discussion and Possible Direction Regarding Possible Amendments to the Transportation Expenditure Plan 3. PUBLIC COMMUNICATIONS Council welcomes participation in its meetings. Comments shall be limited to three (3) minutes per person so that everyone may be given an opportunity to be heard. To expedite matters and avoid repetition, whenever any group of persons wishes to address the Council on the same subject matter, the Mayor may request that a spokesperson be chosen by the group. This item is limited to matters under the jurisdiction of the City Council which are not on the posted agenda. Public criticism of the City Council, Commission, Boards and Agencies will not be prohibited. No action shall be taken. 4. CONSENT CALENDAR Matters listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by a single motion and roll call vote by the City Council. Items may be removed from the Consent Calendar upon request of a Councilmember and acted upon separately by the City Council. The following items are recommended for approval: a. City Council Minutes: April 24, 2013 May 22, 2013 May 29, 2013 (Budget Workshop) June 3, 2013 (Special Meeting) b. Disbursements Journals: Warrant Nos. 22191-22201, Totaling $48,137.78 Warrant Nos. 22202-22279, Totaling $99,856.44 c. Building Inspection Activity Report – May 2013 d. Response to Mendocino County Grand Jury Report, “The K-5th Grade Willits Charter School” 5. RIGHT TO APPEAL Persons who are dissatisfied with the decisions of the City Council may have the right to a review of that decision by a court. The City has adopted Section 1094.6 of the Code of Civil Procedure which generally limits to 90 days the time within which the decisions of the City boards and agencies may be judicially challenged. 6. COMMISSIONS, AGENCIES AND AUTHORITIES The Willits City Council meets concurrently as the City of Willits Planning Commission and City of Willits Successor Agency. 7. OLD BUSINESS Page 1 of 3 8. CITY MANAGER REPORTS AND RECOMMENDATIONS a. Verbal Reports – No Action 9. DEPARTMENT RECOMMENDATIONS a. Police b. City Attorney c. Public Works d. Engineering (1) Discussion and Possible Action to Award Contract to Willow Basin Engineering to Provide Inspection Services for Humboldt Street and Vicinity Rehabilitation Project, Phase I, in an Amount Not to Exceed $30,300 (2) Discussion and Possible Action to Award Contract to His Design to Provide Inspection Services for Water Treatment Plant Project, in an Amount Not to Exceed $60,000 (3) Discussion and Possible Action to Approve Contract with Vertical Mapping, Inc., for Citywide Aerial Mapping, in an Amount Not to Exceed $61,145 e. Finance f. City Clerk/Human Resources 10. CITY COUNCIL AND COMMITTEE REPORTS a. Mendocino Council of Governments (MCOG) b. Local Agency Formation Commission (LAFCO) c. Mendocino Transit Authority (MTA) d. Revit-ED Committee e. Mendocino Solid Waste Management Authority-Joint Powers Authority (MSWMA-JPA) f. Economic Development and Financing Corporation (EDFC) g. League of California Cities h. Water Resources Committee i. Sewer System Committee j. Finance Committee k. Ad Hoc Committees l. Other Committee Reports 11. COUNCIL MEMBER REPORTS AND RECOMMENDATIONS 12. ENACTMENT OF ORDINANCES 13. GOOD & WELFARE 14. CLOSED SESSION NOTICE a. Conference with Legal Counsel Pursuant to Government Code §54956.9 – Existing Litigation: Brooktrails Township Community Services District, a Public Agency vs. City of Willits, a General Law City; and DOES 1 through 100, Inclusive; Case No. SCUK CVG-1056037 b. Conference with Legal Counsel Pursuant to Government Code §54956.9b – Anticipated Litigation (One Case) c. Conference with Legal Counsel Pursuant to Government Code §54956.9 – Existing Litigation: People of the State of California and the City of Willits v. Remco Hydraulics, Inc., et al. (United States District Court – Northern District of California, Case No. C-96-6283 SI 12/22/2000) d. Pursuant to Government Code §54957 – Public Employee Employment: City Manager e. Pursuant to Government Code §54957 – Public Employee Performance Evaluation: Chief of Police f. Conference with Real Negotiators Pursuant to Government Code §54956.8 – Willits Justice Center, Located at 125 East Commercial Street, Willits, California 95490; Agency Negotiator: Adrienne Moore, City Manager, and H. James Lance, City Attorney; Negotiating Parties: County of Mendocino; Under Negotiation: Potential Acquisition, Price, and Terms Willits City Council Agenda – June 12, 2013 Page 2 of 3 15. ADJOURNMENT I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the bulletin board at the main entrance of the City of Willits City Hall, located at 111 East Commercial Street, Willits, California, not less than 72 hours prior to the meeting set forth on this agenda. th Dated this 9 day of June, 2013. Cathy Sanders, Deputy City Clerk Willits City Council Agenda – June 12, 2013 Page 3 of 3 PROCLAMATION A PROCLAMATION OF THE WILLITS CITY COUNCIL DESIGNATING WESTERN WEAR DAYS JUNE 23RD THROUGH JULY 4TH, 2013 WHEREAS, Frontier Days is the oldest continuous rodeo in the California and continues to draw people from all over; and WHEREAS, this year, 2013, marks the 87th anniversary of Willits Frontier Days; and WHEREAS, this traditional annual community event instills great pride in all of us who call Willits home; and WHEREAS, it behooves all citizens of the City of Willits to promote, foster, participate in, and enjoy this great event. NOW, THEREFORE, I, Holly Madrigal, Mayor of the City of Willits, do hereby proclaim June 23rd through July 4th, 2013, to be WESTERN WEAR DAYS, and urge all citizens of the City of Willits to observe said days and the spirit of FRONTIER DAYS, by wearing Western Wear in all of its manifestations of color, variation, gaiety and distinction during said Western Wear Days. IN WITNESS WHEREOF, I have hereunto set my hand and cause the Seal of the CITY OF WILLITS to be affixed this 12th day of June, 2013. Holly Madrigal, Mayor ATTEST: Cathy Sanders, Deputy City Clerk Item No. 2d Meeting Date: June 12, 2013 AGENDA SUMMARY REPORT To: Honorable Mayor and Council Members From: Joanne Cavallari, Finance Director/City Treasurer Agenda Title: NOTICED PUBLIC HEARING TO CONDUCT ANNUAL REVIEW OF RATES AND CHARGES FOR VARIOUS CITY SERVICES AND ADOPT A RESOLUTION APPROVING CHANGES IN CERTAIN CITY FEES AND CHARGES, EFFECTIVE JULY 1, 2013 Type: Presentation Consent Regular Agenda Public Hearing Urgent Time: 15 min. Summary of Request: Each year as a part of the budget process, the City’s rates and fees are reviewed by department heads and proposed changes are provided to the City Council for approval. The proposed increases summarized below: General Fund – Under Police Services, fee increases are recommended for copies to cover staff time and materials. The bicycle license fee has been eliminated. Parking fines have been increased and made consistent for all violations of the Municipal Code. In the Community Development Department, fees for site review and engineering review have been increased. Business License daily flat rate fees for Peddlers and Solicitors have increased. Swimming pool fees for water aerobics have been increased and a senior discount has been established. The unlimited season pass has been eliminated, and new 20 times pass has been added for. A new “Family Swim” fee has also been added, and the fee for swim lessons has been increased to be more in line with what is charged in Ukiah. Airport Fund – Hanger fees will be increased from $165 to $180 per month. Commercial hangers, land leases, and tie down fees will also increase. Sewer Fund – Fee increases are proposed for groundwater cleanup and waste discharge permits. The proposed fee increases for sewer user fees were a part of the Prop 218 process in October of 2009. These fees were approved by USDA to raise sufficient revenues for operations, maintenance, debt service, and capital improvements in the Sewer Fund. On the attached fee schedule, * denotes a fee change or new fee. Recommended Action: 1) Conduct a public hearing and take testimony regarding fees and charges; and 2) Adopt a resolution approving changes in certain City fees and charges, effective July 1, 2013. Alternative(s): Following a public hearing and discussion, adopt a resolution approving changes in certain fees and charges alternative to those recommended by City Staff. Fiscal Impact: All recommended changes are in accordance with staff’s analysis of the need to keep pace with costs of providing necessary services and capital improvements, in accordance with law. Personnel Impact: Minimal. Reviewed by: City Manager Council Action: Records: Approved Agreement City Attorney Denied Finance Director Human Resources Risk Other: ________________________________________ Resolution #_________ Ordinance #_________ Other _________ RESOLUTION NO. 2013RESOLUTION OF THE OF THE CITY COUNCIL OF THE CITY OF WILLITS APPROVING CHANGES IN CERTAIN CITY FEES AND CHARGES EFFECTIVE JULY 1, 2013 WHEREAS, the City Council for the City of Willits (“City”) hereby finds as follows: 1. Notice of the time and place of this meeting to consider the adoption of this resolution to increase City fees was given as required by Government Code Section 6062(a). 2. This Public Hearing is being held to meet the public hearing requirements of Government Code Section 66018(a). 3. The amount of the fee and service charges set forth in the attached Exhibit A do not exceed the estimated amount required to provide the service for which the fee or service charge is being levied. 4. Unless the recommended increased fee or service charge is approved, the City will not have sufficient funds to provide the service for which the fee or service charge is being levied. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Willits that based upon the information provided to the City Council at the public hearing held on the adoption of this Resolution and upon the above findings of fact, the City Council hereby approves and adopts the attached Fee Schedule, a copy of which is hereby incorporated by reference and attached hereto as Exhibit “A” to be effective July 1, 2013. The above and foregoing Resolution was introduced by Councilmember seconded by Councilmember , and passed and adopted at a regular meeting of the City Council of the City of Willits, held on the 12th day of June, 2013, by the following vote: AYES: NOES: ABSENT: _________________________________ HOLLY MADRIGAL, Mayor City Council of the City of Willits ATTEST: _________________________ CATHY SANDERS Deputy City Clerk Item No. 2e Meeting Date: June 12, 2013 AGENDA SUMMARY REPORT To: Honorable Mayor and Council Members From: Joanne Cavallari, Finance Director/City Treasurer Agenda Title: FURTHER DISCUSSION AND POSSIBLE DIRECTION REGARDING DRAFT BUDGET FOR FISCAL YEAR 2013/2014 Type: Presentation Consent Regular Agenda Public Hearing Urgent Time: 20 min. Summary of Request: The City Council held a budget workshop on May 29, 2013. Changes made to the draft budget include: Reduction in Council Member’s stipend from $150 per month to $100 per month for Council Members and from $300 per month to $200 per month for Mayor Removal of $5,000 from the Planning Department for EDFC and Local First Campaign Reduction in hours in the Planning Department for the Part-Time Community Development Director from 960 to 480 per year Removal of $15,000 allocated in Police Administration for Insurance Claims deductible Reduction of $8,000 in Overtime in Police Operations, from $138,000 to $130,000 A line item was included in the Parks budget under “Contingencies” for matching funds if a grant to rehabilitate the tennis courts can be found, although no funds were allocated. These changes resulted in savings in the General Fund of about $57,000. However, there is still a budget deficit of $336,117. This does not include closing the deficit in the Street Maintenance Fund. The deficit in the Street Maintenance Fund was reduced to $183,409 after adding D1 Fund Revenues of $82,726 that will be available to claim in Fiscal Year 2013/14. The Sewer and Water Funds were reduced by $25,000 each by removal of the Rate and Fee Studies. An updated Exhibit A is attached that includes the changes discussed above. Recommended Action: Discuss the draft budget and give direction to staff. The final budget is scheduled for adoption on June 26, 2013. Alternative(s): None recommended Fiscal Impact: As stated above. Personnel Impact: Staff will make changes to the budget as directed and prepare the final document for adoption at the June 26th meeting. Reviewed by: City Manager Council Action: Records: Approved Agreement City Attorney Denied Finance Director Human Resources Risk Other: ________________________________________ Resolution #_________ Ordinance #_________ Other _________ Item No. 2f Meeting Date: June 12, 2013 AGENDA SUMMARY REPORT To: Honorable Mayor and Council Members From: Joanne Cavallari, Finance Director/City Treasurer Agenda Title: REVIEW AND DISCUSSION OF POSSIBLE AMENDMENTS TO THE TRANSPORTATION EXPENDITURE PLAN Type: Presentation Consent Regular Agenda Public Hearing Urgent Time: 20 min. Summary of Request: The City Council held a goal setting workshop in April and identified Polices and Priorities for the use of Half-Cent Sales Tax as one of their top priorities. Staff developed the attached Work Program that was distributed to the Council members in May. The attached Transportation Expenditure Plan was adopted at the time the sales tax measure was approved, and provided Guiding Principles on page 6, and Eligible Activities on Page 7. Table 2 on page 9 listed the Priority Streets. This list was updated in 2005 and 2006. Some of the streets have now been repaired, and other projects, such as the Railroad Avenue/Baechtel Road connection have been identified as possible projects that will be funded by the tax. Recommended Action: Review and discuss possible amendments to the Transportation Expenditure Plan, and provide direction to staff as to the appropriate use of the funds. Alternative(s): None recommended. Fiscal Impact: None. Personnel Impact: Staff will prepare a revised Transportation Expenditure Plan based on Council direction, and bring the revised document back for adoption by Resolution. Reviewed by: City Manager Council Action: Records: Approved Agreement City Attorney Denied Finance Director Human Resources Risk Other: ________________________________________ Resolution #_________ Ordinance #_________ Other _________ ACCOUNTS PAYABLE SYSTEM 05/31/2013 17:34:08 WARRANT DATE VENDOR CITY OF WILLITS GL540R-V07.20 PAGE 1 Disbursements Journal DESCRIPTION AMOUNT CLAIM INVOICE PO# F 9 S ACCOUNT GENERAL CHECK FORM 22191 05/17/13 TIGER DIRECT INC 22191 05/17/13 TIGER DIRECT INC 4037 CAMERA 4037 CREDIT RETURN 22192 05/17/13 COX CASTLE NICHOLSON 4176 REMCO LEGAL 1,090.76 517050 380990 P M H 100.1004.2061.020 22193 05/17/13 CYDZIK/MATTHEW 22193 05/17/13 CYDZIK/MATTHEW 4770 DINNER PER DIEM 5/14/1 20.00 4770 PER DIEM 5/15/2013 40.00 60.00 517049 130506 517049 130506 *CHECK TOTAL P N H 100.1020.2105.000 P N H 100.1020.2105.000 22194 05/17/13 CYDZIK/MATTHEW 4770 FLASHLIGHT/HOLSTER 517048 86574 P N H 100.1011.2010.000 517047 130430 517047 130430 *CHECK TOTAL P N H 100.1005.2091.000 P N H 100.1002.2090.000 22195 05/17/13 WILLITS NEWS 22195 05/17/13 WILLITS NEWS 22196 05/22/13 REESE & ASSOCIATES I 358.82 517051 J3974218010 20.48CR 517051 J3974218010 338.34 *CHECK TOTAL 117.62 179 EMPLOYEMENT ADVERTI 1,566.02 179 LEGAL LINER 379.96 1,945.98 517046 13-0300 P N H 409.4090.2061.012 350.00 517042 130524 P N H 690.237 4036 125 PLAN POLICY PRE 1,101.06 517043 807633 P N H 690.246 22199 05/24/13 HARTFORD LIFE INSURA 709 DEFERRED COMPENSATI 2,486.15 517044 130519 P N H 690.236 22200 05/24/13 PERS 22200 05/24/13 PERS 256 EMPLOYER CONTRIBUT 23,441.16 256 EMPLOYEE CONTRIBUTI 7,340.96 30,782.12 517045 130524 517045 130524 *CHECK TOTAL P N H 690.229 P N H 690.230 22197 05/24/13 MENDO-LAKE CREDIT UN 22198 05/24/13 AFLAC 22201 05/23/13 ANDRADE/JEFFERY GENERAL CHECK FORM 4424 SOILS ENGINEERING 9,349.75 P N H 100.1041.2101.045 P N H 100.1040.2055.000 104 DIRECT DEPOSIT 4333 U-HAUL REIMBURSEMENT TOTAL 516.00 48,137.78 517041 98699858 P N H 100.1022.2044.000 ACCOUNTS PAYABLE SYSTEM 05/31/2013 10:02:39 WARRANT DATE CITY OF WILLITS GL540R-V07.20 PAGE 1 Disbursements Journal VENDOR DESCRIPTION AMOUNT CLAIM INVOICE PO# F 9 S ACCOUNT GENERAL CHECK FORM 22202 05/31/13 ACE COPY & SHIPPING 4112 SHIPPING SUPPLIES 15.14 516957 696440 P M W 100.1042.2055.000 22203 05/31/13 ANDERSON/JON 4526 FUEL UNIT 241 29.04 517008 782110 P N W 100.1022.2044.000 22204 05/31/13 ANDRADE/JEFFERY 4333 DEDUCTIBLE REIMBURSEM 500.00 517036 1418 P N W 100.1022.2044.000 22205 05/31/13 ARAMARK 22205 05/31/13 ARAMARK 4443 WORK SHIRTS 4443 WORK SHIRTS 22206 22206 22206 22206 22206 22206 22206 22206 22206 22206 22206 22206 22206 22206 22206 4123 4123 4123 4123 4123 4123 4123 4123 4123 4123 4123 4123 4123 4123 4123 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T AT&T 22207 05/31/13 AT&T 22208 22208 22208 22208 05/31/13 05/31/13 05/31/13 05/31/13 AT&T AT&T AT&T AT&T MOBILITY MOBILITY MOBILITY MOBILITY 22209 22209 22209 22209 22209 22209 22209 22209 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 BANK BANK BANK BANK BANK BANK BANK BANK OF OF OF OF OF OF OF OF AMERICA AMERICA AMERICA AMERICA AMERICA AMERICA AMERICA AMERICA POLICE PUBLIC WORKS ENGINGEERING POOL SEWER PLANT WATER PLANT AIRPORT WCAC 4601-2-3 40% 24% 12% 12% 12% PLANNING 9341 2/3 1/3 66.52 66.52 133.04 525.91 84.34 84.34 15.01 96.02 66.80 31.82 30.61 368.21 220.92 110.46 110.46 110.46 21.21 10.61 1,887.18 4615 WATER 168.22 4253 4253 4253 4253 52.95 16.10 81.32 72.88 223.25 10 10 10 10 10 10 10 10 PUBLIC WORKS CODE ENFORCEMENT SEWER POLICE CHAIR 133.37 COMM CTR TABLES 4,033.04 LABOR LAW POSTERS 194.56 CONFERENCE MEALS 41.48 DOMAIN REGISTRATION 15.00 WTP CONFERENCE PHONE 271.49 TRACTOR REPAIR PARTS 30.42 WATER PLANT INTERNET 49.99 4,769.35 516956 15314010 516956 15314010 *CHECK TOTAL P N W 100.1011.2010.000 P N W 100.1015.2010.000 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 516954 4327745 *CHECK TOTAL P P P P P P P P P P P P P P P 516953 130519 N N N N N N N N N N N N N N N W W W W W W W W W W W W W W W 100.1020.2015.000 100.1040.2015.000 100.1042.2015.000 100.1030.2015.000 501.5013.2015.000 503.5030.2015.000 500.5001.2110.000 600.601 100.1002.2015.000 265.2650.2015.000 265.2650.2015.000 100.1015.2015.000 100.1010.2015.000 265.2650.2015.000 100.1010.2015.000 P N W 503.5030.2015.000 516955 05202013 516955 05202013 516955 05202013 517010 05202013 *CHECK TOTAL P P P P N N N N W W W W 100.1040.2015.000 100.1011.2015.000 501.5013.2015.000 100.1020.2015.000 517037 130518 517037 130518 517037 130518 517037 130518 517037 130518 517037 130518 517037 130518 517037 130518 *CHECK TOTAL P P P P P P P P N N N N N N N N W W W W W W W W 100.1040.2055.000 100.1016.2025.000 100.1005.2055.000 100.1005.2105.000 100.1003.2041.000 503.5030.2055.000 501.5011.2041.000 503.5030.2015.000 22210 05/31/13 BARRIGA/MARIA .09102 WATER DEPOSIT REFUND 25.20 516959 10202450004 P N W 503.111 22211 05/31/13 BARTOW/DAVID .09101 WATER OVERPAYMENT 71.57 516958 10300777501 P N W 503.0503.6600.000 ACCOUNTS PAYABLE SYSTEM 05/31/2013 10:02:39 WARRANT DATE VENDOR CITY OF WILLITS GL540R-V07.20 PAGE 2 Disbursements Journal DESCRIPTION AMOUNT CLAIM INVOICE PO# F 9 S ACCOUNT GENERAL CHECK FORM 22212 05/31/13 BELTRAMI/ALBERT 22212 05/31/13 BELTRAMI/ALBERT .09109 CONSULT WITH CITY COU 240.00 .09109 MILEAGE 54.80 294.80 22213 05/31/13 BROOKSIDE SCHOOL 4743 FOSTER GRANDPARENT 22214 05/31/13 BUD GARMAN CONSTRUCT 517038 130517 517038 130517 *CHECK TOTAL P N W 100.1005.2081.030 P N W 100.1005.2081.030 1,000.00 517009 130529 P N W 600.626 4769 ROAD REPAIR 626.50 516960 12-249 P M W 100.1045.3020.000 22215 05/31/13 CAINE/DENVEL 4447 CONTRACT OPERATOR 887.00 517034 130509 P M W 503.5033.2081.030 22216 05/31/13 CALIFORNIA ASSOCIATI 4543 CODE ENFORCEMENT TRNG 50.00 516964 130618 P N W 100.1011.2105.000 357.16 516963 670578 P N W 100.1042.2044.000 516961 10403220009 P N W 503.111 22217 05/31/13 CALIFORNIA SURVEYING 22218 05/31/13 CALLAGHAN/JACKIE 410 ENGR EQUIP MAINT .09103 WATER DEPOSIT REFUND 75.00 22219 05/31/13 CAMPBELL/RACHAEL 22219 05/31/13 CAMPBELL/RACHAEL 4237 SEWER GIS MAP & MAP B 450.00 4237 WATER SYSTEM PLAN 1,935.00 2,385.00 22220 05/31/13 CERATTO/MICHAEL 4787 WCAC JANITORIAL 22221 05/31/13 CHEVRON USA, INC. 516965 590152 P M W 600.601 498.88 517035 130522 P N W 100.1022.2044.000 60.00 517013 130531 P M W 100.1020.2199.000 267.10 516966 12406 P N W 100.1042.2095.000 611.45 103.20 77.32 791.97 517011 2013-4 517011 2013-4 517011 2013-4 *CHECK TOTAL P N W 100.1020.2110.000 P N W 100.1020.2110.000 P N W 100.1020.2110.000 197 COURT/STATE FEES PARKI 75.00 517012 130515 P N W 100.1020.2081.030 27 PD FUEL 4221 WATER MAY 2013 22223 05/31/13 COMMERCIAL CAPITAL C 4671 SCANNER LEASE 22225 05/31/13 COUNTY OF MENDOCINO P M W 501.5011.2081.030 P M W 503.5034.2061.012 100.00 22222 05/31/13 CLEARLY MENDOCINO WA 22224 05/31/13 COUNTY OF MENDOCINO 22224 05/31/13 COUNTY OF MENDOCINO 22224 05/31/13 COUNTY OF MENDOCINO 516971 03-09-WSS-TT 516972 01-13-WM-I *CHECK TOTAL 33 JC ELEC SVC APRIL 33 JC WATER SVC APRIL 33 JC GARBAGE SVC APRIL 22226 05/31/13 COUNTY OF MENDOCINO 22226 05/31/13 COUNTY OF MENDOCINO 22226 05/31/13 COUNTY OF MENDOCINO 4133 MO SVC AGREE APRIL 20 660.00 517014 20134-2 4133 HOURLY SUPPORT APRIL2 286.60 517014 20134-2 4133 SERVICE CREDIT 250.00CR 517014 20134-2 696.60 *CHECK TOTAL P N W 100.1020.2081.030 P N W 100.1020.2081.030 P N W 100.1020.2081.030 22227 05/31/13 CREATIVE FORMS & CON 4005 PAYROLL CHECKS 22228 05/31/13 DEEP VALLEY SECURITY 22228 05/31/13 DEEP VALLEY SECURITY 22228 05/31/13 DEEP VALLEY SECURITY 22229 05/31/13 DENBESTE LANDSCAPE S 291.05 516962 111968 P N W 100.1003.2055.000 22.00 16.48 49.42 87.90 516967 240207 516967 240207 516967 240207 *CHECK TOTAL P N W 100.1040.2081.030 P N W 100.1041.2081.030 P N W 100.1042.2081.030 4644 LANDSCAPE FIBER/PLA 4,108.75 516968 560798 P N W 100.1050.2101.045 40 PW SHOP SECURITY 40 PW SECURITY 40 ENGR SECURITY ACCOUNTS PAYABLE SYSTEM 05/31/2013 10:02:39 WARRANT DATE CITY OF WILLITS GL540R-V07.20 PAGE 3 Disbursements Journal VENDOR DESCRIPTION AMOUNT CLAIM INVOICE PO# F 9 S ACCOUNT 4003 AP FUEL TANK REPAIR 303.97 516969 4121 P M W 500.5001.2001.003 .09104 WATER DEPOSIT REFUND 10.50 516970 10404610002 P N W 503.111 GENERAL CHECK FORM 22230 05/31/13 EHLERT/MARTIN 22231 05/31/13 FELICITY/LAUROSE 22232 05/31/13 FISHER WIRELESS 4105 VOLUME KNOB 32.98 517015 218260 P N W 100.1020.2041.000 22233 05/31/13 GAMBLE/BRANDI 4480 CCPOR TRNG MILEAGE 24.30 517016 130528 P N W 100.1020.2105.000 22234 05/31/13 HERMAN/SCOTT 22234 05/31/13 HERMAN/SCOTT 4735 BOOT ALLOWANCE FY 12/ 100.00 4735 BOOT ALLOWANCE FY 12/ 100.00 200.00 516973 159579 516973 159579 *CHECK TOTAL P N W 503.5031.2010.000 P N W 503.5033.2010.000 255 EMPLOYEE CONTRIBUTION 431.05 516974 130524 22235 05/31/13 I B E W 22236 22236 22236 22236 05/31/13 05/31/13 05/31/13 05/31/13 KILLION/FRED KILLION/FRED KILLION/FRED KILLION/FRED 22237 05/31/13 LIBERTY MANUFACTURIN 22238 05/31/13 LOOS/DAWN 22239 05/31/13 MED-TECH RESOURCE IN 4607 4607 4607 4607 JANITORIAL JANITORIAL CITY HALL JANITORIAL VACUUM FOR STAIRS 130.00 130.00 800.00 43.49 1,103.49 4810 RANGE CLEANUP 7,873.00 .09105 CLEANING DEPOSIT REFU 300.00 4580 PPE LATEX GLOVES 136.61 516975 PW&ENG12/13-11 516975 PW&ENG12/13-11 516998 130528 516998 130528 *CHECK TOTAL P N W 690.235 P P P P M M M M W W W W 100.1042.2081.030 100.1040.2081.030 100.1016.2061.020 100.1016.2025.000 517017 7205 P N W 651.6510.2199.000 516976 130518 P N W 100.1050.4211.000 517018 16903 P N W 100.1022.2101.033 22240 05/31/13 MENDOCINO COUNTY YOU 285 YOUTH OUTREACH-WILL 3,000.00 517019 130529 P N W 600.626 22241 05/31/13 MENDOCINO JANITORIAL 4255 JANITORIAL SVC/SUPP 1,373.62 516977 223706 P M W 100.1016.2061.020 22242 05/31/13 MENDOCINO PUBLIC HEA 4811 YOUTH ADVOCATES PRO 1,000.00 517020 130529 P N W 600.626 22243 05/31/13 MOORE/ADRIENNE 22243 05/31/13 MOORE/ADRIENNE 22243 05/31/13 MOORE/ADRIENNE 4325 LUNCH MTG AL BELTRAMI 23.75 4325 DINNER MTG AL BELTRAMI 72.98 4325 BUDGET WRKSHP LUNCH 89.50 186.23 517039 130301 517039 130301 517039 130301 *CHECK TOTAL P N W 100.1002.2199.000 P N W 100.1002.2199.000 P N W 100.1002.2199.000 22244 05/31/13 NEW WORLD SYSTEMS 4586 AEGIS 2013 CUSTOMER 1,245.00 516978 26725 P N W 651.6510.2199.000 22245 05/31/13 NUESTRA ALIANZA DE W 4442 YOUTH PROGRAMS FY 1 5,000.00 517021 130529 P N W 600.626 22246 22246 22246 22246 22246 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 P P P P P G G G G G & & & & & E E E E E COMPANY COMPANY COMPANY COMPANY COMPANY 114 114 114 114 114 ENGINEERING PARKS SEWER WATER PUBLIC WORKS 75.50 37.72 8.12 31.54 75.50 228.38 516979 130514 516979 130514 516979 130514 516979 130514 516979 130514 *CHECK TOTAL P P P P P N N N N N W W W W W 100.1042.2110.000 100.1050.2110.000 501.5013.2110.000 503.5033.2110.000 100.1040.2110.000 ACCOUNTS PAYABLE SYSTEM 05/31/2013 10:02:39 WARRANT DATE CITY OF WILLITS GL540R-V07.20 PAGE 4 Disbursements Journal VENDOR DESCRIPTION AMOUNT CLAIM INVOICE PO# F 9 S ACCOUNT GENERAL CHECK FORM 22247 05/31/13 PACIFIC TELEMANAGEME 4767 AIRPORT PAY PHONE 50.00 516981 533854 P N W 500.5001.2110.000 22248 05/31/13 PINOLEVILLE NATION 4812 GIRLS BASKETBALL TEAM 500.00 517022 130529 P N W 600.626 22249 05/31/13 PITNEY BOWES 4507 POSTAGE 516983 130512 P N W 100.1002.2055.000 516980 10102230005 P N W 503.111 516982 130517 P N W 690.231 516984 6736 P M W 500.5001.2081.030 517023 130529 P N W 600.626 22250 05/31/13 POSEY/MICHAEL D. 22251 05/31/13 PRINCIPAL MUTUAL LIF .09106 WATER DEPOSIT REFUND 2,000.00 629 LIFE INS PREMIUM 42.92 844.15 22252 05/31/13 RAMSEY/DANNY 4773 POSTAGE EQUIP RETURN 22253 05/31/13 REDWOOD CHILDREN'S S 4637 GRIP PROGRAM-BAECHT 3,500.00 22254 05/31/13 SIERRA CHEMICAL CO. 22254 05/31/13 SIERRA CHEMICAL CO. 4330 WATER DEPT CHEMICAL 1,811.17 516988 249593 4330 CONTAINER DEPOSIT RET 900.00CR 516988 249593 911.17 *CHECK TOTAL 22255 05/31/13 SILVERIA/STEVEN 22256 05/31/13 SOLID WASTE OF WILLI .09107 WATER DEPOSIT REFUND 29.86 P N W 503.5033.2101.034 P N W 503.5033.2101.034 516987 10202540004 P N W 503.111 516989 94 P M W 501.5013.2199.000 516985 902731453 P N W 100.1016.2041.000 1,215.88 516991 41341 P M W 503.5033.2041.000 .09108 VOID OUTSTANDING PAYR 256.26 516990 39232 P N W 100.140 517024 130528 P N W 100.1020.2105.000 517025 FOCS117242 P N W 100.1022.2044.000 330 SEWER PLANT BIN SERVI 212.79 22257 05/31/13 STANLEY SECURITY SOL 4283 KEYS 22258 05/31/13 STANLEY/DONALD 4757 WATER PLANT TREES 22259 05/31/13 TAYLOR/CARLY 15.08 43.71 22260 05/31/13 TONELLI/DEBRA 4542 CCPOR TRNG MILEAGE 24.30 22261 05/31/13 UKIAH FORD INC 382 VEHICLE MAINT UNIT 1,375.15 22262 05/31/13 UKIAH PAPER SUPPLY I 22262 05/31/13 UKIAH PAPER SUPPLY I 22262 05/31/13 UKIAH PAPER SUPPLY I 164 WASHROOM FLOOR MATS 164 WCAC EVENT SUPPLIES 164 WCAC EVENT SUPPLIES 140.81 87.16 54.47 282.44 516995 130520 516995 130520 516995 130520 *CHECK TOTAL P N W 100.1016.2025.000 P N W 600.601 P N W 600.601 22263 22263 22263 22263 22263 165 165 165 165 165 73.13 13.18 25.31 6.15 9.22 126.99 516992 958793123 516993 958793213 516994 5382F9193 516994 5382F9193 516994 5382F9193 *CHECK TOTAL P P P P P 516996 957213 516997 957287 *CHECK TOTAL P N W 503.5031.2041.000 P N W 503.5033.2041.000 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 UNITED UNITED UNITED UNITED UNITED PARCEL PARCEL PARCEL PARCEL PARCEL SERVIC SERVIC SERVIC SERVIC SERVIC 22264 05/31/13 UTILITY SUPPLY OF AM 22264 05/31/13 UTILITY SUPPLY OF AM POSTAGE POSTAGE POSTAGE POSTAGE POSTAGE 3997 WATER PLANT TOOLS 3997 PRESSURE SWITCH 672.41 408.20 1,080.61 M M M M M W W W W W 100.1002.2055.000 100.1002.2055.000 100.1042.2055.000 100.1040.2055.000 202.2020.2061.012 ACCOUNTS PAYABLE SYSTEM 05/31/2013 10:02:39 WARRANT DATE CITY OF WILLITS GL540R-V07.20 PAGE 5 Disbursements Journal VENDOR DESCRIPTION AMOUNT CLAIM INVOICE PO# F 9 S ACCOUNT GENERAL CHECK FORM 22265 05/31/13 W P O A 262 EMPLOYEE CONTRIBUTION 871.42 P N W 690.234 517001 125AI0240052 P N W 690.246 22266 05/31/13 WAGE WORKS 4755 125 PLAN FSA SVC FEE 22267 05/31/13 WATER WORKS ENGINEER 4285 WTP ENGR & PRJCT M 17,470.67 517006 2895 P N W 409.4090.2061.012 22268 05/31/13 WILLIAMS SCOTSMAN IN 4116 MOBILE OFFICE RENT 517007 97033335 P N W 501.5010.2096.000 22269 05/31/13 WILLITS HIGH SCHOOL 4441 BOYS SOCCER PROGRAM 1,000.00 517028 130529 P N W 600.626 22270 05/31/13 WILLITS HIGH SCHOOL 4740 GIRLS BASKETBALL PR 1,000.00 517029 130529 P N W 600.626 22271 05/31/13 WILLITS HIGH SCHOOL 4813 YOUTH EXERCISE PROG 5,000.00 517027 130529 P N W 600.626 22272 05/31/13 WILLITS HIGH SCHOOL 4814 TENNIS PROGRAM 1,000.00 517030 130529 P N W 600.626 22273 05/31/13 WILLITS KIDS CLUB 22273 05/31/13 WILLITS KIDS CLUB 3981 PAYROLL DEDUCTION 20.00 3981 AFTER SCHOOL/SUMMER 3,000.00 3,020.00 517000 130524 517026 130529 *CHECK TOTAL P N W 690.248 P N W 600.626 22274 22274 22274 22274 22274 1245 1245 1245 1245 1245 70.26 19.44 252.29 252.29 252.28 846.56 517005 130501 517005 130501 517005 130501 517005 130501 517005 130501 *CHECK TOTAL P P P P P 1,000.00 517032 130529 P N W 600.626 10,000.00 517031 130529 P N W 600.626 200.00 517033 130521 P N W 651.6510.2199.000 74.03 151.19 225.22 517003 1304J5 517003 1304J5 *CHECK TOTAL P N W 503.5033.2105.000 P N W 503.5033.2105.000 517002 33118 517004 33161 517040 33165 *CHECK TOTAL P M W 202.2020.2081.030 P M W 202.2020.2081.030 P M W 501.5011.2061.020 05/31/13 05/31/13 05/31/13 05/31/13 05/31/13 WILLITS WILLITS WILLITS WILLITS WILLITS POWER POWER POWER POWER POWER 299.93 SEWER PLANT SUPPLIES EQUIP MAINT WEEDEATER WEEDEATER WEEDEATER 22275 05/31/13 WILLITS SOBER GRAD 4381 SOBER GRAD FUNDING 22276 05/31/13 WILLITS UNIFIED SCHO 4815 YOUTH COUNSELING 22277 05/31/13 WILLITS UNIFIED SCHO 50.00 516999 130524 457 BRONCO VIDEO PROJECT 22278 05/31/13 WILSON/BILL 22278 05/31/13 WILSON/BILL 4363 WTR OP TEST MILEAGE 4363 WTR OP TEST LODGING 22279 05/31/13 WIPF/ERNEST 22279 05/31/13 WIPF/ERNEST 22279 05/31/13 WIPF/ERNEST 1032 VACTOR COMMERCIAL ST 812.50 1032 VACTOR BARBARA ST 1,000.00 1032 VACTOR MILL CREEK RD 625.00 2,437.50 GENERAL CHECK FORM TOTAL 99,856.44 M M M M M W W W W W 501.5011.2041.000 100.1050.2041.000 100.1050.2041.000 201.2012.2041.000 201.2011.2041.000 CITY OF WILLITS BUILDING INSPECTION ACTIVITY REPORT FOR THE MONTH OF: May, 2013 NEW CONSTRUCTION 1) Single Family Dwellings 2) Two Family Dwelling 3) Three and Four Family Dwelling 4) Five or More Family Dwelling 5) Moved Dwellings and Modular Units 6) Hotels and Motels 7) Amusement and Recreation Buildings 8) Churches and Religious Buildings 9) Industrial Buildings 10) Private Garages and Carports 11) Service Station and Repair Garages 12) Office, Bank and Professional Buildings 13) Stores and Similar Buildings 14) Warehouse and Agriculture Buildings MISCELLANEOUS CONSTRUCTION 15) Reroof, Siding, Windows, Etc. 16) Heating and Air Conditioning 17) Electric, Mechanical, Plumbing 18) Demolition STRUCTURES OTHER THAN BUILDINGS 19) Foundations, Pools, Walls, Signs, etc. CONVERSIONS 20) Non-Residential to Residential 21) Residential to Non-Residential ADDITIONS AND ALTERATIONS 22) Residential Buildings 23) Non-Residential Buildings LIVING UNITS Grading BLDG. PERMITS VALUATION 2 $ 84,400.00 2 1 6 2 $ $ $ $ 11,000.00 2,500.00 384,450.00 22,200.00 TOTALS COMPARISON Valuation This Month Same Month Last Year $ $ 547,550.00 70,800.00 Revenue This Month Same Month Las Year $ $ 3,962.40 1,363.65 Permits This Month Same Month Last Year TOTALS TO DATE THIS FISCAL YEAR Construction Valuation Fees Collected No. of Permits 15 8 TYPE OF PERMIT AND OTHER REVENUE #'s FEE'S Building 6 $ 1,948.90 Electrical 4 $ 576.25 Mechanical 1 $ 108.00 Plumbing 2 $ 808.00 Grading 2 $ 521.25 Demolition Plan Check 6 $ 567.00 Late Fee Bldg. Survey Sewer Insp. $ 2,875,350.00 $ 47,715.44 120 TOTALS: TOTALS TO SAME DATE LAST YEAR Construction Valuation Fees Collected No. of Permits $ $ 295,010.00 39,216.00 102 21 $ 4,529.40 Respectfully Submitted: _______________________________ John Sherman, Building Inspector CITY OF WILLITS BUILDING AND SAFETY 111 E. Commercial St. Willits, Ca. 95490 (707) 459-7122 DATE: 6/05/2013 TO: Mendocino County Assessor Att: Joe 501 Low Gap Rd., 1020 Ukiah, CA. 95482 FROM: Building Department, City of Willits RE: Permit Completion for Month of _May 2013__ PARCEL# 005-241-24 006-110-21 007-291-26 006-074-04 005-142-05 007-120-17 006-076-07 007-120-22 006-091-02 005-091-19 007-170-19 007-092-17 006-210-19 007-210-24 038-080-30 WORK DONE ADDRESS VALUE The following permits were issued. Swimming Pool Equipment 188 Easy St. 500.00 Replace Elect. Svc. Panel 850 Blosser Lane 950.00 Tearoff Reroof 100 Margie Dr. 3000.00 Construct new garage/shop 46 W. Oak St. 50400.00 Construct new garage/shop 184 State St. 34000.00 Grade pad and driveway 1490 Baechtel Rd. 8000.00 Reframe roof 37 Monroe St. 43000.00 Reroof 1565 S. Main St. 8000.00 3.2kw PV Solar 165 Laurel St. 17000.00 Grade Bldg. pad 145 Mill Creek Dr. 4200.00 Entry Monument Signs 1702 S. Main St. 2500.00 Replace Elect. Svc. Panel 1450 Willow Lane 1500.00 Grade and install playground equip. 1265 Blosser Lane 10000.00 Fuel storage for backup generators. 1 Marcela Dr. 362000.00 Furnace replacement 24050 N. Hwy 101 2500.00 DATE PERMIT # 5/01/13 5/03/13 5/06/13 5/07/13 5/07/13 5/08/13 5/09/13 5/09/13 5/10/13 5/13/13 5/16/13 5/16/13 5/16/13 5/21/13 5/23/13 8077 8078 8079 8080 8081 8082 8083 8084 8085 8086 8087 8088 8089 8090 8091 005-241-24 005-171-14 006-110-21 007-291-26 006-091-02 007-230-21 006-252-07 COMPLETED PROJECTS Swimming Pool Equipment 188 Easy St. New deck and patio door 611 Hawthorn St. Replace Elect. Svc. Panel 850 Blosser Ln. Tearoff Reroof 100 Margie Dr. 3.2kw PV Solar 165 Laurel St. Revise drainage and ADA parking 265 Margie Dr. Remodel Bathroom 1253 Magnolia Ave. ________________________________ John Sherman Building Inspector City of Willits 500.00 5000.00 950.00 3000.00 17000.00 7500.00 3500.00 5/01/13 5/03/13 5/03/13 5/06/13 5/21/13 5/24/13 5/20/13 8077 7971 8078 8079 8085 8071 8076 Item No. 4d Meeting Date: June 12, 2013 AGENDA SUMMARY REPORT To: Honorable Mayor and Council Members From: Adrienne Moore, City Manager Agenda Title: APPROVE RESPONSE TO MENDOCINO COUNTY GRAND JURY REPORT ENTITLED “THE K-5TH GRADE WILLITS CHARTER SCHOOL” Type: Presentation Consent Regular Agenda Public Hearing Urgent Time: N/A Summary of Request: On April 12, 2013, the City received the Mendocino County Grand Jury report entitled “The K-5th Grade Willits Charter School”. Per the California Penal Code, the City must respond to the Grand Jury’s findings and recommendations within 90 days. In terms of the Grand Jury’s findings, the City Council must respond that the Council either agrees with the findings, or wholly or partially disagrees with Findings #3 and #4. Please find attached a copy of the aforementioned Grand Jury Report with proper forms and explanations prepared for the City Council consideration and possible approval. Recommended Action: Approve response to Mendocino County Grand Jury Report entitled “The K-5th Grade Willits Charter School”. Alternative(s): None recommended. Fiscal Impact: Not applicable. Personnel Impact: Not applicable. Reviewed by: City Manager Council Action: Records: Approved Agreement City Attorney Denied Finance Director Human Resources Risk Other: ________________________________________ Resolution #_________ Ordinance #_________ Other _________ Received 4/12/13 Within 90 days Willits City Council F3, F4 N/A N/A N/A N/A N/A June 12, 2013 Holly Madrigal, Mayor, Willits City Council -0- Item No. 9d(1) Meeting Date: June 12, 2013 AGENDA SUMMARY REPORT To: Honorable Mayor and Council Members From: Tom Mannatt, City Engineer Agenda Title: DISCUSSION AND POSSIBLE ACTION TO AWARD CONTRACT TO WILLOW BASIN ENGINEERING TO PROVIDE INSPECTION SERVICES FOR HUMBOLDT STREET AND VICINITY REHABILITATION PROJECT, PHASE I, IN AN AMOUNT NOT TO EXCEED $30,300, AND AUTHORIZE CITY MANAGER TO EXECUTE SAME Type: Presentation Consent Regular Agenda Public Hearing Urgent Time: 15 min. Summary of Request: In April 2013, staff released a Request for Proposals (RFP) for inspection services for the Humboldt Street and Vicinity Rehabilitation Project, Phase I. Proposals were requested from SHN Consulting Engineers and Geologists, Inc., LACO Associates, Pope Engineering, Water Consultant Services, Willow Basin Engineering (WBE), and His Design. Proposals were received from WBE and His Design. Staff reviewed the proposals and preliminarily rated the consultants based on their professional experience. After rating the proposals, staff determined that WBE was the most qualified firm. Subsequently, staff reviewed WBE’s cost estimate and determined that the cost of $34,800 was out of the range the City could afford and commenced negotiations. Staff contacted WBE and spoke with them about the project budget and requested a second cost estimate that was more in line with the project budget. WBE returned with a new cost estimate of $30,300, which fits the project budget. Staff is, therefore, recommending that the City Council approve the contract with WBE to provide construction management services for the Humboldt Street and Vicinity Rehabilitation Project. WBE’s Scope of Services and Cost Estimate are attached for review. Recommended Action: Award a Contract to Willow Basin Engineering to provide Inspection Services for the Humboldt Street and Vicinity Rehabilitation Project, Phase I, in an amount not to exceed $30,300, and authorize City Manager to execute same. Alternative(s): None recommended. Fiscal Impact: This project is proposed to be paid for out of FY13-14 Fund 202-2020-4030-000 (half-cent sales tax). Personnel Impact: Staff time will be needed to manage the contract and to provide general support. Reviewed by: City Manager Council Action: Records: Approved Agreement City Attorney Denied Finance Director Human Resources Risk Other: ________________________________________ Resolution #_________ Ordinance #_________ Other _________ CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is made and entered into in duplicate, effective this 13 day of June, 2013, by and between the CITY OF WILLITS, California, hereinafter referred to as the CITY, and Willow Basin Engineering whose address is 101 Nancy Lane, Willits, CA 95490 hereinafter referred to as the CONTRACTOR, as follows: RECITALS A. Contractor is specially trained, experienced and competent to perform the special services which will be required by this Contract; and B. Contractor possesses the skill, experience, ability, background, certification, and knowledge to provide the services described in this Contract on the terms and conditions described herein. C. City desires to retain Contractor to render professional services as set forth in this contract. CONTRACT 1. SERVICES TO BE PERFORMED BY CONTRACTOR. Contractor shall perform the services described in “Exhibit A,” which is attached hereto and incorporated herein by reference. Contractor shall provide said services at the time, place, and in the manner specified in “Exhibit A,” subject to the direction of the City through its staff that it may provide from time to time. 2. TERM. The services of Contractor are to commence upon execution of this Contract and shall continue until all authorized work is approved by the City. All such work shall be completed no later than September 30th, 2013. 3. COMPENSATION. Compensation to be paid to Contractor shall be in accordance with “Exhibit A,” which is attached hereto and incorporated herein by reference. In no event shall Contractor’s compensation exceed $30,300 without additional written authorization from the City. Payment by City under this Contract shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4. METHOD OF PAYMENT. Contractor shall submit monthly billings to City describing the work performed during the preceding month. Contractor’s bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Contractor no later than 30 days after approval of the monthly invoice by City staff. 5. EXTRA WORK. At any time during the term of this Contract, City may request that Contractor perform Extra Work. As used herein, "Extra Work" means any work, which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Contract. Contractor shall not perform, nor be compensated for, Extra Work without written authorization from the City. 6. TERMINATION. This Contract may be terminated by the City immediately for cause or by either party without cause upon fifteen days written notice of termination. Upon termination, Contractor shall be entitled to compensation for services performed up to the effective date of termination. Revised: 12/2011 1 Professional Contract: W/ WBE - Humboldt and Vicinity Inspection Services Job name 7. OWNERSHIP OF DOCUMENTS. All plans, studies, documents and other writings prepared by and for Contractor, its officers, employees and agents and subcontractors in the course of implementing this Contract, except working notes and internal documents, shall become the property of the City upon payment to Contractor for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Contractor or to any other party. Contractor shall, at Contractor’s expense, provide such reports, plans, studies, documents, and other writings to City upon written request. In the event of termination, all finished or unfinished documents, data, studies, and reports prepared by Contractor under this Contract shall become the City’s property; and Contractor shall deliver such documents to the City Clerk within two (2) business days from the date that this Contract is terminated. 8. CONTRACTOR’S BOOKS AND RECORDS. a. Contractor shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor to this Contract. b. Contractor shall maintain all documents and records which demonstrate performance under this Contract for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Contract. c. Any records or documents required to be maintained pursuant to this Contract shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Contractor’s address indicated for receipt of notices in this Contract. d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Contractor’s business, City may, by written request by any of the above named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Contractor, Contractor’s representatives, or Contractor’s successor-in-interest. 9. INDEPENDENT CONTRACTOR. Both parties hereto in the performance of this Contract will be acting in an independent capacity and not as agents, employees, partners, or joint ventures of one another. Contractor is not an employee of City and is not entitled to any of the rights, benefits, or privileges of City employees including, but not limited to, medical, or Worker’s Compensation insurance. The parties intend to and have entered into a bonafide independent contract and nothing herein is a subterfuge to avoid making the Contractor an employee of the City. Contractor shall have control of the means, methods and details of performing the work and shall only be subject to the general direction and supervision of the City to insure that results contracted for are achieved per plans and specifications provided to the Contractor. Contractor expressly warrants and agrees that it will exercise its own independent judgment in evaluating the accuracy and reliability of all data, technical reports and studies prepared by the applicant for the Project, its officers, agents, employees and subcontractors or prepared by any other person or entity not a party to this contract. Revised: 12/2011 2 Professional Contract: W/ WBE - Humboldt and Vicinity Inspection Services Job name 10. INTEREST OF CONTRACTOR. Contractor (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by this Contract or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Contractor’s services hereunder. Contractor further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Contract. Contractor is not a designated employee within the meaning of the Political Reform Act because Contractor: a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal contract monitoring; and b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).) 11. PROFESSIONAL ABILITY OF CONTRACTOR. City has relied upon the professional training and ability of Contractor to perform the services hereunder as a material inducement to enter into the Contract. Contractor shall therefore provide properly skilled professional and technical personnel to perform all services under this Contract. All work performed by Contractor under this Contract shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Contractor’s field of expertise. 12. COMPLIANCE WITH LAWS. Contractor shall use the standard of care in its profession to comply with all applicable federal, state, and local laws, codes, ordinances and regulations. 13. LICENSES. Contractor represents and warrants to City that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required of Contractor to practice its profession. Contractor represents and warrants to City that Contractor shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Contract, any licenses, permits, insurance and approvals which are legally required of Contractor to practice its profession. Contractor shall, if required, maintain a City of Willits business license. 14. HOLD HARMLESS. Contractor shall assume the defense of, and indemnify and save harmless, the City and each and every employee and agent thereof from all suits, actions, damages, claims or loss of every name and description to which the City may be subjected or put because of or arising out of Contractor’s negligent performance under this Contract. In providing the indemnification of City provided in this Contract, Contractor agrees to provide for all costs of any necessary legal defense. 15. INSURANCE REQUIREMENTS. a. Contractor, at Contractor’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. Revised: 12/2011 3 Professional Contract: W/ WBE - Humboldt and Vicinity Inspection Services Job name i. Workers’ Compensation Coverage. Contractor shall maintain Workers’ Compensation Insurance and Employer’s Liability Insurance for his/her employees in accordance with the laws of the State of California. The Employer’s Liability Insurance shall be maintained in an amount not less than two million dollars ($2,000,000) per accident for bodily injury or disease. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California for all of the sub-contractor’s employees. Any notice of cancellation or nonrenewal of all Workers’ Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees, and volunteers for losses arising from work performed by Contractor for City. ii. General Liability Coverage. Contractor shall maintain commercial general liability insurance in an amount not less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit. iii. Automobile Liability Coverage. Contractor shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with the work to be performed under this Contract, including coverage for owned, hired and non-owned vehicles, in an amount of not less than two million dollars ($2,000,000) combined single limit for each occurrence. iv. Professional Liability Coverage. Contractor shall maintain professional errors and omissions liability for protection against claims alleging negligent acts, errors, or omissions which may arise from Contractor’s operations under this Contract, whether such operations be by the Contractor or by its employees, subcontractors, or subconsultants. The amount of this insurance shall not be less than two million dollars ($2,000,000) on a claims-made annual aggregate basis, or a combined single-limit per occurrence basis. b. Endorsements. Each general liability, automobile liability, and Workers’ Compensation insurance policy shall be with insurers possessing a Best’s rating of no less than A: VII and shall be endorsed with the following specific language: i. The City, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Contractor, including materials, parts or equipment furnished in connection with your “ongoing operations” and “your work.” ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self-insured retention the City may have shall be considered excess insurance only and shall not contribute with it. iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. Revised: 12/2011 4 Professional Contract: W/ WBE - Humboldt and Vicinity Inspection Services Job name iv. The insurer waives all rights of subrogation against the City, its elected or appointed officers, officials, employees, or agents. v. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City. c. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City’s option, Contractor shall demonstrate financial capability for payment of such deductibles or self-insured retentions. d. Certificates of Insurance. Contractor shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. The endorsement shall be on forms provided by the City or on other forms which conform to all City requirements. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Contract. Current certification of insurance shall be kept on file with the City at all times during the term of this Contract. 16. NOTICES. Any notice required to be given under this Contract shall be in writing and either served personally or sent prepaid, first class mail. Any such notice shall be addressed to the other party at the address set forth below. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section. If to City: City of Willits 111 East Commercial St. Willits, CA 95490-3188 If to Contractor: Rod Wilburn Willow Basin Engineering 101 Nancy Lane Willits, CA 95490 17. ENTIRE CONTRACT. This Contract constitutes the complete and exclusive statement of Contract between the City and Contractor. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Contract. 18. AMENDMENTS. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 19. ASSIGNMENT AND SUBCONTRACTING. The parties recognize that a substantial inducement to City for entering into this Contract is the professional reputation, experience, and competence of Contractor. Assignments of any or all rights, duties or obligations of the Contractor under this Contract will be permitted only with the express consent of the City. Contractor shall not subcontract any portion of the work to be performed under this Contract without the written authorization of the City. If City consents to such subcontract, Contractor shall be fully responsible to City for all acts or omissions of Revised: 12/2011 5 Professional Contract: W/ WBE - Humboldt and Vicinity Inspection Services Job name the subcontractor. Nothing in this Contract shall create any contractual relationship between City and subcontractor, nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. 20. WAIVER. Waiver of a breach or default under this Contract shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under this Contract. 21. SEVERABILITY. If any term or portion of this Contract is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Contract shall continue in full force and effect. 22. CONTROLLING LAW VENUE. This Contract and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Contract shall be held exclusively in a state court in the County of Mendocino. 23. LITIGATION EXPENSES AND ATTORNEYS FEES. If either party to this Contract commences any legal action against the other party arising out of this Contract, the prevailing party shall be entitled to recover its reasonable litigation expenses, including court costs, expert witness fees, discovery expenses, and attorneys’ fees. 24. MEDIATION. The parties agree to make a good faith attempt to resolve any disputes arising out of this Contract through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and shall divide the costs of mediation equally. If the parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS/ENDISPUTE ("JAMS") or its successor in interest. JAMS shall provide the parties with the names of five qualified mediators. Each party shall have the option to strike two of the five mediators selected by JAMS and thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation, either party may commence litigation. 25. EXECUTION. This Contract may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Contract, it shall not be necessary to produce or account for more than one such counterpart. 26. AUTHORITY TO ENTER CONTRACT. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Contract. Each party warrants that the individuals who have signed this Contract have the legal power, right, and authority to make this Contract and to bind each respective party. 27. PROHIBITED INTERESTS. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no member, officer, or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. Revised: 12/2011 6 Professional Contract: W/ WBE - Humboldt and Vicinity Inspection Services Job name 28. EQUAL OPPORTUNITY EMPLOYMENT. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such nondiscrimination shall include, but not be limited to, all activities related to initial employment, upgrading demotion, transfer, recruitment or recruitment advertising, layoff or termination. IN WITNESS WHEREOF, the parties have caused this Contract to be executed on the date first written above. CITY OF WILLITS: CONTRACTOR: By (Signature): Adrienne Moore Interim City Manager Title: License # APPROVED AS TO FORM: ATTEST: H. James Lance City Attorney Cathy Sanders Deputy City Clerk Exhibits: Exhibit A - Scope of Work / Schedule of Charges Exhibit B - Insurance Certificates Exhibit C - Insurance Endorsements Exhibit D - IRS W-9 Reporting Form Revised: 12/2011 7 Professional Contract: W/ WBE - Humboldt and Vicinity Inspection Services Job name EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 PROPOSAL FOR INSPECTION SERVICES for HUMBOLDT STREET & VICINITY REHABILITATION PROJECT, PHASE I WORK PLAN PO SE D Willow Basin Engineering is pleased to prepare this proposal for the City of Willits to provide Construction Management and Inspection Services for the Humboldt Street and Vicinity Rehabilitation Project Phase I (Project). Having completed the hydrologic and hydraulic analysis for this project, I feel my knowledge of the project will be helpful in providing the variety of services outlined in the Request for Proposals (RFP). Also, having attended the Pre-Bid Meeting and job walk in accordance with the RFP, I'm comfortable with my understanding of all aspects of the construction in this project. PR O It is understood that the project is a significant project for downtown Willits and the construction will provide many challenges including traffic control and the potential for utilities conflicts. It will be essential that the Construction Manager work closely with the City of Willits and the Contractor to manage the expectations of the businesses and community members directly and indirectly affected by the project. It is also understood that this project is partially funded by the California Department of Transportation (Caltrans) through the State and Local Partnership Program (SLPP), which requires additional documentation for the Construction Manager and Inspector as deemed necessary by Caltrans. The primary goal is to assist in the completion of the Project within the time allowed under the contract while providing cost control if contract work changes are necessary. Other goals include ensuring quality work is being performed consistent with contract specifications; ensuring traffic and pedestrian safety measures are in place and effective; ensure that the contractor is complying with work place safety and health standards; submit monthly reports in a timely manner; and closeout the project expeditiously. The overall approach to this project is to remain proactive in communications with City Staff, the contractor and the community; prepare all necessary documents and create/maintain organized electronic copies; and meet all deadlines for monthly construction reports, payment processing and project closeout reports. Page | 1 EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 FIRM DESCRIPTION D Willow Basin Engineering is a sole-proprietorship owned by Rod Wilburn, PE (RCE #69388) that has been working with the City of Willits and providing a broad range of services for a little over four years. These services include construction inspection, hydrology/hydraulic analysis, engineering design, drafting, plan check, consulting, assistance with technical specifications and assistance with determining materials testing requirements for a construction project. Mr. Wilburn will be in responsible charge of all construction management and inspection services outlined in this proposal. PO SE The following is a list of projects Willow Basin Engineering has been involved with within the past three years, which involved work similar to the scope of services for this project: PR O 1. Humboldt Street and Vicinity Rehabilitation Project - Completed storm drain analysis, reviewed improvement plans and reviewed technical specifications. 2. Central Street Rehabilitation Project - Completed the storm drain analysis, reviewed improvement plans, assisted with engineering design, provided inspection services and consulted on contractor progress payment issues. 3. Sherwood Road Rehabilitation Project - Completed design; prepared plans, specifications and engineer's estimate; provided full time inspection services; negotiated extra work costs and final billing with the contractor; and provided a hardcopy binder with Inspector's Daily Reports. 4. West Commercial Street Rehabilitation Project - Although there was no underground storm drain included in this project, it is a Public Works project that involved traffic control . Mr. Wilburn was considered the design engineer and assisted with construction engineering at the Muir Lane Driveway. The other services provided included assistance with technical specifications, engineer's estimate, list of materials certificates required and list of materials testing required by Caltrans. 5. Van Lane and Vicinity Storm Drain Project - Completed storm drain analysis and reviewed improvement plans. 6. New Howard Hospital - Plan check, Drainage Study review and storm drain construction inspection. 7. Various Encroachment Permit Inspections Page | 2 EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 SCOPE OF WORK The following scope of work describes the project approach and lists City of Willits projects that I have been involved with as Construction Inspector and/or Construction Manager. Pre-Construction PO SE D Since the construction is going to take place in a busy, commercial area of downtown Willits, it is important to start coordinating with the contractor as soon as possible. The construction schedule and Traffic Control Plan need to provided prior to the Pre-Construction Meeting so that those items can be reviewed. This would lead to a more productive meeting and thought could be given to such things as putting up changeable message signs (CMS) as one of the first priorities. Another important consideration prior to construction is making sure to be proactive in the communication and coordination with the businesses and the one public entities directly affected the construction. This coordination should include the contractor or at least input from the contractor to determine the best ways to handle traffic and pedestrian safety through the different phases of construction. With limited parking available, one of the biggest challenges will be to maintain access for the Willits Unified School District Office when construction is taking place on Humboldt Street directly in front of the office. A possible solution could be constructing a temporary driveway allowing access to the parking lot from Pearl Street. PR O There will also need to be coordination with the Willits Police Department since they use Mendocino Avenue for access to their station. The other businesses that front on Humboldt Street will be in a similar situation as those along Central Street during the Central Street Rehabilitation Project. It would be valuable to have some direction from the City of Willits staff involved in that project with regards to what worked best in maintaining access to the businesses. The businesses along Main Street that have double fronting lots like the Savings Bank of Mendocino County and North Valley Bank could potentially allow for an alternate exit. In the case of North Valley Bank, the vehicles could use Main Street as both ingress and egress and in the case of the Savings Bank, vehicles could potentially use the drive up teller lane as an egress route since Wood Street is a one-way street. During the job walk at the Pre-Bid Meeting it was indicated by City of Willits representatives that PG&E will be moving two natural gas lines during construction. The contractor will be digging the trench so that PG&E can come in and move the gas lines. It will be important to ensure that the scheduling of these tasks is completed as a scope of this work. It was also indicated that there is some discrepancy as to the condition of the AT&T duct work in the street Page | 3 EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 so assistance with clearing up the discrepancy and all other utility coordination will be addressed as a part of this contract. Prior to construction a video would be taken of the existing conditions in all areas where construction is to occur. The video would be shot with a high-definition, wide angle camera and a copy provided to the City of Willits on a separate flash drive. This video could potentially help resolve any disputes with property or business owners if any claims of damage or unwanted alteration are brought against the contractor or the City of Willits. D Construction PR O PO SE This task will include all field related services necessary to provide full time construction observation and inspection. One person will be onsite at all times during construction to observe and log daily traffic control and construction activities. This person will be responsible for preparing the Inspector's Daily Report (Exhibit 16-C2) and communicating with the contractor with respect to progress and schedule. The field person will also be noting personnel onsite, collecting weigh slips for asphalt concrete pavement and other materials, and measuring quantities as required by the construction progress payments. With an understanding of the City of Willits Public Works Quality Assurance Program (QAP) and the Caltrans Local Assistance Procedure Manual (LAPM), the daily inspection and construction management tasks need to be documented according to according to Caltrans requirements. The documentation listed in the RFP from the LAPM will be completed daily and a hard copy will be placed in the project binder. Electronic copies of all documentation will be created by scanning the hard copies when necessary and all electronic copies will be provided to the City of Willits on a flash drive or other media if requested. Project scheduling will need to be addressed weekly at a minimum and daily when necessary. The affected businesses, public entities, property owners and community need to be kept up to date on the scheduling and progress. Willow Basin Engineering understands that they will be expected to provide the City of Willits with these updates on a regular basis (weekly at a minimum) and whenever called upon. Also, for every day of construction, it is important to ensure that all traffic control measures included in the approved Traffic Control Plan are in place before construction begins. Photographs will be taken of traffic control measures and locations noted in the Inspector's Daily Report (Exhibit 16-C2). Photographs will be taken throughout construction and the photographs will be stored electronically in folders broken down by date. If possible, the photograph folders will provide some description of the work completed on that day. The Page | 4 EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 photographs along with any additional videos will be provided to the City of Willits on a flash drive or other media if requested. Post Construction D Based on the RFP it is understood that Willow Basin Engineering would be responsible for completing all project management forms from the Clatrans LAPM as required by Caltrans. It is assumed that all forms required by the LAPM and QAP that are related specifically to materials testing and the results of that testing will be completed by the firm that is responsible for that testing. As a part of the project closeout a punch-list will be prepared by July 26, 2013 so that the construction can be completed by August 2, 2013. PROJECT SCHEDULE PO SE Upon completion of the construction it is understood that a complete set of the construction contract, project management and inspection documentation must be submitted in a timely manner. Also, the recommendation to the City of Willits will be prepared and provided as to the release of the final payment and retention. The Notice of Completion, project balancing and all other necessary documentation will be coordinated with City Staff to ensure the project closeout is as expeditious as possible. The construction schedule provided at the Pre-Bid Conference is as follows: Bid Opening: 5/20/13 at 1:00 PM City Council Authorization to Award: 5/24/13 Notice of Award: 5/24/13 Pre-Construction Conference: 6/11/13 Notice to Proceed: 6/11/13 Construction Start: 6/12/13 Punch List Development: 7/26/13 Construction Completion: 8/2/13 Project Balancing/Staff Submission of Project Completion Paperwork: 8/5/13 Council Acceptance of Project: 8/14/13 Notice of Completion Recorded with County: 8/15/13 Retention Invoice Due: After 8/15/13 but before 9/10/13 Final Payment to Prime Contractor: 9/16/13 PR O • • • • • • • • • • • • • The dates that of specific importance under this proposal are: • Pre-Construction Conference 6/11/13 Page | 5 EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 • • • • Construction Start: 6/12/13 Punch List Development 7/26/13 Construction Completion: 8/2/13 Project Balancing/Staff Submission of Project Completion Paper Work: 8/5/13 Other important dates: Submission of Monthly Project Management Reports: 7/8/13 & 8/5/13 Submission of a complete set of construction contract documentation: 8/16/13 D • • COST PO SE It is proposed that the Scope of Work be completed on a time and materials basis with the following costs: Construction Inspection @ $70/hour - Estimated Cost $21,500 Construction and Project Management @ $110/hour - Estimated Cost $8,800 Total Estimated Cost $30,300 PR O The above rates are specific to this project and additional work on this project can be completed at these rates. Page | 6 EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 Rodney L. Wilburn, Jr., P.E. Civil Engineer/Owner Willow Basin Engineering 101 Nancy Lane Willits, CA 95490 (707) 304-2996 Willits High School 1990 Bachelor of Science degree in Environmental Resources Engineering, Humboldt State University, Arcata, CA. REGISTRATION: Registered Civil Engineer, State of California, #69388 exp. 6/30/2014 D EDUCATION: WORK EXPERIENCE: PR O PO SE Willow Basin Engineering November 2007 to Present Principal Civil Engineer/Owner • Humboldt Street & Vicinity Rehabilitation Project - City of Willits. Contracted to perform hydrology and hydraulic analysis of proposed storm drain system. Also reviewed improvement plans and technical specification. • Encroachment Permit Plan Review - City of Willits. Review of plan submittals, drainage studies and inspection of improvements within the City of Willits right-of-way. • Sherwood Road Rehabilitation Project - City of Willits. Contracted to complete engineering design, plans, technical specifications and provide construction management and daily inspection services. • West Commercial Street Rehabilitation Project – City of Willits. Contracted as design engineer and assisted with technical specifications and engineer’s estimate. Also provided bidding support services. • Van Lane & Vicinity Storm Drain Project – City of Willits. Contracted as design engineer and assisted with technical specifications and engineer’s estimate. Performed hydrology and hydraulic calculations for the proposed storm drain system. • Central Street Rehabilitation Project – City of Willits. Contracted as design engineer and assisting with technical specifications and engineer’s estimate. Performing hydrology and hydraulic calculations for the proposed storm drain system. Round Valley Indian Housing Authority, Covelo, CA April 2008 to Present Project Management • Managing the Construction of 10 single-family residential: Budget $2.2 Million • Managed the construction of 8 single-family residential units. Budget $2.75 Million – Cost to Complete $2.25 Million • Managed a variety of housing renovation projects with budgets from $10,000 emergency rehabilitation on the reservation to $120,000 modular replacement in Nice, CA. • Responsible for supervising as many as 17 construction workers • Responsible for coordinating plumbers, electricians, roofers, insulation contractor, HVAC contractor, drywall contractor, wood stove installers and general contractor contracted to complete finish work and painting. • Responsible for communication with architect, geotechnical engineers and surveyors. • Responsible for authorizing and assisting with procurements of professional services, contractors, materials, tools and equipment. Page | 7 EXHIBIT A WBE 101 Nancy Lane Willits, CA 95490 (707) 304-2996 • Responsible for review of construction bids and professional proposals and providing recommendations for contract awards. PO SE D Quad Knopf, Inc., Roseville, CA June 2005 to October 2007 Civil Engineer • Supervised as many as four employees and was responsible for timesheet reviews, processing time off requests, reviewing and approving expense reports and conducting performance reviews. • Managed multiple projects in land development that included drainage studies, sewer studies, improvement plans and quantity/cost estimates. • Performed grading drainage, sewer and other design functions for commercial projects in Reno, Carson City and Minden, Nevada. • Interfaced with clients and public agencies during engineering design and processing of improvement plans. • Prepared both formal and letter proposals for public and private projects. • Assisted the Planning Department with preparation of Environmental Impact Reports, specific plans and interpretation of engineering documents provided by other consulting firms. • Reviewed drainage studies for residential developments for the City of Hughson, CA. PR O SHN Consulting Engineers & Geologists, Inc., Willits, CA February 2002 to June 2005 Assistant Engineer • Prepared improvement plans, bid documents, technical specifications, quantity/cost estimates for construction, drainage calculations and reports, and performed drafting work for multiple public works projects for the City of Willits. • Assisted with design and drafting for the Davis Creek Water Main Relocation Project, which was the relocation of a large section of the 16-inch water main connecting the City of Willits to the reservoir system. • Performed daily inspection and construction administration for road rehabilitation projects and parking lot construction projects on behalf of the City of Willits. These projects included drainage improvements, pavement rehabilitation, new parking lot construction, new sidewalk construction, landscaping and irrigation and relocation of affected utilities. • Field survey work including boundary, topographic and construction survey. Round Valley Indian Housing Authority, Covelo, CA February 2000 to February 2002 Planner/Developer • Performed environmental reviews to ensure the Round Valley Indian Housing Authority met either the U.S. Department of Housing and Urban Development or the Bureau of Indian Affairs environmental review requirements for construction projects and non-construction expenditures. • Responsible for writing Rental Assistance Program and Procurement Policies. • Assisted with preparation of Native American Housing and Self Determination annual grant application. • Managed 26-unit rehabilitation project for rental units. COMPUTER SKILLS: Autodesk Infrastructure Design Suite 2013; Autodesk Storm and Sanitary Analysis 2013; Civil 3D 2010; AutoCAD 2007; Land Development Desktop, StormCAD, Microsoft Excel, Microsoft Word, Microsoft Project, FlowMaster and Terramodel. Page | 8 Item No. 9d(2) Meeting Date: June 12, 2013 AGENDA SUMMARY REPORT To: Honorable Mayor and Council Members From: Tom Mannatt, City Engineer Agenda Title: DISCUSSION AND POSSIBLE ACTION TO AWARD A CONTRACT TO HIS DESIGN TO PROVIDE INSPECTION SERVICES FOR THE WATER TREATMENT PLANT PROJECT FOR THE NOT TO EXCEED AMOUNT OF $60,000 AND AUTHORIZE CITY MANAGER TO EXECUTE SAME Type: Presentation Consent Regular Agenda Public Hearing Urgent Time: 15 min. Summary of Request: The City needs an Inspector for the Water Treatment Plant Project. Inspection duties are currently being split between Water Works Engineers and City staff. In order to continue work on several upcoming projects, staff recommends the City retain the services of His Design for inspection of the Water Treatment Plant Project. If Council approves this contract, His Design will fulfill the City’s portion of inspecting, with some oversight by City staff. This will allow engineering staff to continue with surveying and design of various upcoming projects. Staff is, therefore, recommending that the City Council approve the contract with His Design to provide inspection services for the Water Treatment Plant Project. His Design’s Scope of Services and Cost Estimate are attached for your review. Recommended Action: Award a contract to His Design to provide inspection services for the Water Treatment Plant Project, in an amount not to exceed $60,000, and authorize City Manager to execute same. Alternative(s): None recommended. Fiscal Impact: This project is proposed to be paid for out of FY13-14 Fund 409-4090-2061-012 (Water Treatment Plant Improvement Project Fund). Personnel Impact: Staff time will be needed to manage the contract and to provide general support. Reviewed by: City Manager Council Action: Records: Approved Agreement City Attorney Denied Finance Director Human Resources Risk Other: ________________________________________ Resolution #_________ Ordinance #_________ Other _________ CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is made and entered into in duplicate, effective this 13th day of June 2013, by and between the CITY OF WILLITS, California, hereinafter referred to as the CITY, and HIS Design whose address is 325 Pomo Court, Willits, CA 95490 hereinafter referred to as the CONTRACTOR, as follows: RECITALS A. Contractor is specially trained, experienced and competent to perform the special services which will be required by this Contract; and B. Contractor possesses the skill, experience, ability, background, certification, and knowledge to provide the services described in this Contract on the terms and conditions described herein. CONTRACT D C. City desires to retain Contractor to render professional services as set forth in this contract. PO SE 1. SERVICES TO BE PERFORMED BY CONTRACTOR. Contractor shall perform the services described in “Exhibit A,” which is attached hereto and incorporated herein by reference. Contractor shall provide said services at the time, place, and in the manner specified in “Exhibit A,” subject to the direction of the City through its staff that it may provide from time to time. 2. TERM. The services of Contractor are to commence upon execution of this Contract and shall continue until all authorized work is approved by the City. All such work shall be completed no later than June 30, 2014. PR O 3. COMPENSATION. Compensation to be paid to Contractor shall be in accordance with “Exhibit A,” which is attached hereto and incorporated herein by reference. In no event shall Contractor’s compensation exceed $60,000 without additional written authorization from the City. Payment by City under this Contract shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4. METHOD OF PAYMENT. Contractor shall submit monthly billings to City describing the work performed during the preceding month. Contractor’s bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Contractor no later than 30 days after approval of the monthly invoice by City staff. 5. EXTRA WORK. At any time during the term of this Contract, City may request that Contractor perform Extra Work. As used herein, "Extra Work" means any work, which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Contract. Contractor shall not perform, nor be compensated for, Extra Work without written authorization from the City. 6. TERMINATION. This Contract may be terminated by the City immediately for cause or by either party without cause upon fifteen days written notice of termination. Upon termination, Contractor shall be entitled to compensation for services performed up to the effective date of termination. Revised: 12/2011 1 Professional Contract: W/ HIS Design WTP Project –Inspection Services 7. OWNERSHIP OF DOCUMENTS. All plans, studies, documents and other writings prepared by and for Contractor, its officers, employees and agents and subcontractors in the course of implementing this Contract, except working notes and internal documents, shall become the property of the City upon payment to Contractor for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Contractor or to any other party. Contractor shall, at Contractor’s expense, provide such reports, plans, studies, documents, and other writings to City upon written request. In the event of termination, all finished or unfinished documents, data, studies, and reports prepared by Contractor under this Contract shall become the City’s property; and Contractor shall deliver such documents to the City Clerk within two (2) business days from the date that this Contract is terminated. 8. CONTRACTOR’S BOOKS AND RECORDS. D a. Contractor shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor to this Contract. PO SE b. Contractor shall maintain all documents and records which demonstrate performance under this Contract for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Contract. O c. Any records or documents required to be maintained pursuant to this Contract shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Contractor’s address indicated for receipt of notices in this Contract. PR d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Contractor’s business, City may, by written request by any of the above named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Contractor, Contractor’s representatives, or Contractor’s successor-in-interest. 9. INDEPENDENT CONTRACTOR. Both parties hereto in the performance of this Contract will be acting in an independent capacity and not as agents, employees, partners, or joint ventures of one another. Contractor is not an employee of City and is not entitled to any of the rights, benefits, or privileges of City employees including, but not limited to, medical, or Worker’s Compensation insurance. The parties intend to and have entered into a bonafide independent contract and nothing herein is a subterfuge to avoid making the Contractor an employee of the City. Contractor shall have control of the means, methods and details of performing the work and shall only be subject to the general direction and supervision of the City to insure that results contracted for are achieved per plans and specifications provided to the Contractor. Contractor expressly warrants and agrees that it will exercise its own independent judgment in evaluating the accuracy and reliability of all data, technical reports and studies prepared by the applicant for the Project, its officers, agents, employees and subcontractors or prepared by any other person or entity not a party to this contract. Revised: 12/2011 2 Professional Contract: W/ HIS Design WTP Project –Inspection Services 10. INTEREST OF CONTRACTOR. Contractor (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by this Contract or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Contractor’s services hereunder. Contractor further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Contract. Contractor is not a designated employee within the meaning of the Political Reform Act because Contractor: a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal contract monitoring; and D b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).) PO SE 11. PROFESSIONAL ABILITY OF CONTRACTOR. City has relied upon the professional training and ability of Contractor to perform the services hereunder as a material inducement to enter into the Contract. Contractor shall therefore provide properly skilled professional and technical personnel to perform all services under this Contract. All work performed by Contractor under this Contract shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Contractor’s field of expertise. 12. COMPLIANCE WITH LAWS. Contractor shall use the standard of care in its profession to comply with all applicable federal, state, and local laws, codes, ordinances and regulations. PR O 13. LICENSES. Contractor represents and warrants to City that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required of Contractor to practice its profession. Contractor represents and warrants to City that Contractor shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Contract, any licenses, permits, insurance and approvals which are legally required of Contractor to practice its profession. Contractor shall, if required, maintain a City of Willits business license. 14. HOLD HARMLESS. Contractor shall assume the defense of, and indemnify and save harmless, the City and each and every employee and agent thereof from all suits, actions, damages, claims or loss of every name and description to which the City may be subjected or put because of or arising out of Contractor’s negligent performance under this Contract. In providing the indemnification of City provided in this Contract, Contractor agrees to provide for all costs of any necessary legal defense. 15. INSURANCE REQUIREMENTS. a. Contractor, at Contractor’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. i. Revised: 12/2011 Workers’ Compensation Coverage. Contractor shall maintain Workers’ Compensation Insurance and Employer’s Liability Insurance for his/her employees in accordance with the 3 Professional Contract: W/ HIS Design WTP Project –Inspection Services laws of the State of California. The Employer’s Liability Insurance shall be maintained in an amount not less than two million dollars ($2,000,000) per accident for bodily injury or disease. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California for all of the sub-contractor’s employees. Any notice of cancellation or nonrenewal of all Workers’ Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees, and volunteers for losses arising from work performed by Contractor for City. D ii. General Liability Coverage. Contractor shall maintain commercial general liability insurance in an amount not less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit. PO SE iii. Automobile Liability Coverage. Contractor shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with the work to be performed under this Contract, including coverage for owned, hired and non-owned vehicles, in an amount of not less than two million dollars ($2,000,000) combined single limit for each occurrence. O iv. Professional Liability Coverage. Contractor shall maintain professional errors and omissions liability for protection against claims alleging negligent acts, errors, or omissions which may arise from Contractor’s operations under this Contract, whether such operations be by the Contractor or by its employees, subcontractors, or subconsultants. The amount of this insurance shall not be less than two million dollars ($2,000,000) on a claims-made annual aggregate basis, or a combined single-limit per occurrence basis. i. PR b. Endorsements. Each general liability, automobile liability, and Workers’ Compensation insurance policy shall be with insurers possessing a Best’s rating of no less than A: VII and shall be endorsed with the following specific language: The City, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Contractor, including materials, parts or equipment furnished in connection with your “ongoing operations” and “your work.” ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self-insured retention the City may have shall be considered excess insurance only and shall not contribute with it. iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. Revised: 12/2011 4 Professional Contract: W/ HIS Design WTP Project –Inspection Services iv. The insurer waives all rights of subrogation against the City, its elected or appointed officers, officials, employees, or agents. v. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City. c. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City’s option, Contractor shall demonstrate financial capability for payment of such deductibles or self-insured retentions. PO SE D d. Certificates of Insurance. Contractor shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. The endorsement shall be on forms provided by the City or on other forms which conform to all City requirements. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Contract. Current certification of insurance shall be kept on file with the City at all times during the term of this Contract. 16. NOTICES. Any notice required to be given under this Contract shall be in writing and either served personally or sent prepaid, first class mail. Any such notice shall be addressed to the other party at the address set forth below. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section. City of Willits 111 East Commercial St. Willits, CA 95490-3188 O If to City: PR If to Contractor: Tom & Rachael Campbell HIS Design 325 Pomo Court Willits, CA 95490 17. ENTIRE CONTRACT. This Contract constitutes the complete and exclusive statement of Contract between the City and Contractor. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Contract. 18. AMENDMENTS. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 19. ASSIGNMENT AND SUBCONTRACTING. The parties recognize that a substantial inducement to City for entering into this Contract is the professional reputation, experience, and competence of Contractor. Assignments of any or all rights, duties or obligations of the Contractor under this Contract will be permitted only with the express consent of the City. Contractor shall not subcontract any portion of the work to be performed under this Contract without the written authorization of the City. If City consents to such subcontract, Contractor shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Contract shall create any contractual relationship between City and Revised: 12/2011 5 Professional Contract: W/ HIS Design WTP Project –Inspection Services subcontractor, nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. 20. WAIVER. Waiver of a breach or default under this Contract shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under this Contract. 21. SEVERABILITY. If any term or portion of this Contract is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Contract shall continue in full force and effect. 22. CONTROLLING LAW VENUE. This Contract and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Contract shall be held exclusively in a state court in the County of Mendocino. D 23. LITIGATION EXPENSES AND ATTORNEYS FEES. If either party to this Contract commences any legal action against the other party arising out of this Contract, the prevailing party shall be entitled to recover its reasonable litigation expenses, including court costs, expert witness fees, discovery expenses, and attorneys’ fees. PO SE 24. MEDIATION. The parties agree to make a good faith attempt to resolve any disputes arising out of this Contract through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and shall divide the costs of mediation equally. If the parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS/ENDISPUTE ("JAMS") or its successor in interest. JAMS shall provide the parties with the names of five qualified mediators. Each party shall have the option to strike two of the five mediators selected by JAMS and thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation, either party may commence litigation. PR O 25. EXECUTION. This Contract may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Contract, it shall not be necessary to produce or account for more than one such counterpart. 26. AUTHORITY TO ENTER CONTRACT. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Contract. Each party warrants that the individuals who have signed this Contract have the legal power, right, and authority to make this Contract and to bind each respective party. 27. PROHIBITED INTERESTS. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no member, officer, or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. Revised: 12/2011 6 Professional Contract: W/ HIS Design WTP Project –Inspection Services 28. EQUAL OPPORTUNITY EMPLOYMENT. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such nondiscrimination shall include, but not be limited to, all activities related to initial employment, upgrading demotion, transfer, recruitment or recruitment advertising, layoff or termination. IN WITNESS WHEREOF, the parties have caused this Contract to be executed on the date first written above. CITY OF WILLITS: CONTRACTOR: By (Signature): Adrienne Moore City Manager Title: H. James Lance City Attorney ATTEST: PO SE APPROVED AS TO FORM: D License # Cathy Sanders Deputy City Clerk PR O Exhibits: Exhibit A - Scope of Work / Schedule of Charges Exhibit B - Insurance Certificates Exhibit C - Insurance Endorsements Exhibit D - IRS W-9 Reporting Form (on file) Revised: 12/2011 7 Professional Contract: W/ HIS Design WTP Project –Inspection Services EXHIBIT A THOMAS M. MANNATT, CITY ENGINEER CITY OF WILLITS 111 E. COMMERCIAL ST. WILLITS, CA 95490 Dear Mr. Mannatt, PO SE D It is with great pleasure that we submit our contract proposal for the consultant services for the City of Willits Water Treatment Plant improvement project. We have enjoyed working with the City Public Works Department over the last five years doing mapping, surveying, structural design, O&M manuals and updating the City of Willits Standard Specifications manual. We have a good working relationship with many of the city staff, utility system managers and the operators that will make this job function smoothly. HIS Design planning & drafting has been serving this community for more than 20 years. Our staff has a wide range of experience in construction design and inspection, as you will see in our attached resumes, that will allow us to proficiently and effectively inspect, document and assist in managing this project. Sincerely, PR O We thank you for your consideration of our enclosed proposal and look forward to working with you again in the future. Tom & Rachael Campbell Co-owners HIS Design Planning & Drafting 1 [email protected] EXHIBIT A Public works PO SE D HIS Design Planning and Drafting has been in operation since 1998 with over 30 years combined experience in construction design and development. It is a minority owned business that has a partnership of husband and wife planning and design team, Tom and Rachael Campbell. It also works closely with other local civil and structural engineers as well as surveyors and architects. The Design business has a wide variety of abilities and expertise from field data collection to AutoCAD design and project management. We have been assisting entities including: tribes; housing authorities; city public works departments; building committees; as well as individual property owners to reach their design goals for many years. We are passionate about helping clients see their vision and bring it into reality. PR O Updating and publishing of the latest City of Willits Standard Specifications manual Water systems: design and planning; AutoCAD design and plan set completion; installation inspection and project management; O&M manual preparation; as built mapping; GIS Waste water systems: design and planning; AutoCAD design and plan set completion; development of specifications; onsite project management; construction inspection; site evaluations; system and as built mapping; GIS Earthwork and Construction development: Design of grading plans; road ways; parking areas. Project involvement includes: Topographic and boundary surveying; AutoCAD design of plan and profile layout; cut and fill calculations; construction staking; inspection; concrete testing; compaction testing; as built survey and plan completion 2 [email protected] EXHIBIT A PR O PO SE D Our consultant will provide construction inspection and management services on an as needed basis throughout the duration of the Water treatment plant improvement project. These services will be at the direction of the City Engineer and include but are not limited to: all meetings; coordination with city’s engineering dept. record keeping and reporting,. During the construction phase of the project the inspector will be available for field inspection and checking of compliance with the project specifications. They will keep a current an accurate daily record of scheduling, progress, accomplishments, problems and any other pertinent information. This will then be developed into a report and submitted on the 10th of every month both in electronic (Word and/or Excel) and hard copy. They will be aware of the requirements outlined in City of Willits Quality Assurance Procedures Manual and make sure those requirements are met. During this time we will work closely with the City Engineer to coordinate all aspects of the project and maintain good communication on any change orders and or problems that may arise. We will also work closely with the contractors, making sure to communicate any deficiencies in work or divergences from the plans and specifications and to resolve any safety issues. We will conduct and or evaluate testing to verify compliance with construction documents and specifications. The reviewing of expenses and contractors billing statements will be done before submittal to the City for payment. Most importantly we will strive to keep a safe and problem free work environment by being proactive in good communication and understanding between all parties involved. At the completion of the construction phase, we will perform a closeout of the project including the final site inspection and recording to determine compliance with the contracts. Preparation and inspection of punch list . Preparation and submittal of completed construction documentation and record drawings mad during construction. We will also assist in the filing of a Notice of Completion after obtaining the Warranty and Lien Release Information from the contractor. [email protected] EXHIBIT A We will: Scope of Services The Consultant will work at the direction of the City Engineer and be responsible for providing inspection and construction management services during construction, and post-construction of the project including attendance at the, construction management meetings and inspection during construction, coordination with the City’s Engineering Department, management of paper work and record keeping, and complying with project close out requirements. The Consultant will be actively involved in all construction related and project management tasks as directed by the City Engineer. PO SE D The Consultant will also be responsible for understanding all construction management, materials testing, and requirements as defined in the City of Willits Quality Assurance Procedures Manual, any applicable permits, and all state and federal requirements. The Consultant will provide a range of services including but not limited to: construction management inspection, claims mitigation, document control, labor compliance, progress pay estimates & status of funds, and project closeout during the period of construction of the City’s Water Treatment Plant Improvements Project. Tasks PR Scope of Services: O Task 1: Construction Services The Consultant shall be responsible for providing construction inspection services during construction throughout the duration of the project. Project Management, including: Schedule Evaluation (actual vs. planned) Record Management. Consultant shall use the method set forth by the City Engineer. Consultant shall be responsible for retaining a hard copy file as well as an electronic file of all paperwork received. Consultant should be familiar with scanning software and hardware. Site Coordination between Contractor, City of Willits Staff, and Utility Companies Construction Task Order (CTO) management, including cost tracking and estimated vs. actual expenditures Communication with Contractor, City staff, and others Assist in the preparation and submittal of monthly Construction progress report, and payment request. The monthly progress report shall be due on the tenth (10th) of the month and shall contain at a minimum the following in either electronic format on disk or via email as required by the City of Willits: [email protected] EXHIBIT A Overview of work accomplished during the previous month. Overview of work to be accomplished the following month. Updated schedule. This shall be based on Contractor's schedule. Contractor work progress and completion percentage in a summary form and graphs. Problem areas, if any, with proposed corrective actions. Outstanding issues with deadline-to-resolve-by date. Comparison of monthly invoiced amount and cumulative billings with total authorized construction management budget. City Staff shall maintain the progress payment tracking sheet and the Consultant shall work with staff to ensure accuracy of items paid. 8. Review of Contractor’s monthly billings and submittal to City. D 1. 2. 3. 4. 5. 6. 7. PR O PO SE Construction Contract Administration, including: Review of contract documents at 100% completion for familiarity with project plans and specifications. Coordination and Participation in site meetings with the Contractor and City Staff/Consultants, and preparation and distribution of meeting agenda and minutes. Reviewing working days, contract time, and documenting time extensions. Assist the City Engineer with the Resident Engineer’s daily report. Maintaining a daily inspector's report that records the hours worked by men and equipment. Detail must be sufficient to permit the review of the contractor's costs of the work in a manner similar to force account. Equipment must be identified sufficiently to enable determination of the applicable rental rates and operator's minimum wage. The narrative portion of the report shall include a description of the Contractor's operation and location of work and any other pertinent information. Enforcing Labor Compliance by preparing Spot Checks as required by the appropriate funding agency if required. Maintaining well organized photographs and video records. Monitoring construction schedules throughout the course of construction Tracking sub-contractors work. Ensuring contractor submits written request prior to substituting a sub-contractor. Review of Contractor's submittals for compliance with Contract Documents. Review of Contractor's request for information and either provide information from Contract Documents upon City approval back to the Contractor or route request to City for resolution by Design Engineer. Completion of Quantity Calculation Sheets. The amount payable each month to the construction contractor needs to be supported by the Quantity Calculation sheets. Review of Contractor's pay requests and recommendations to City as to acceptability of request. Communication with Contractor regarding acceptability of Work. [email protected] EXHIBIT A PO SE D Project Change Control, including: Review and evaluation of contract change order requests and submittals. Contract change order coordination between Contractor, City, and WWE. Investigation and inspection of site conditions that differ from those described in the Contract Documents. Review of submittals in support, and recommendations for resolution of claims and disputes. Field Inspection, including: Performing field inspection and other quality control activities including necessary materials testing. Review and inspection of Contractor's work for compliance with Contract Documents on a daily basis. Monitoring of corrective actions taken by the Contractor needed to fix work that is not in compliance with Contract Documents. Field inspection diaries to be submitted weekly. Digital photos of work in progress. Quality Assurance Program (QAP) compliance Review of Contractor's compliance with all regulatory permits and mitigation measures. Review of Contractor's compliance with workplace safety and health standards and notification of City of non-compliance. Ensuring contractor properly provides for the safety of the workmen. PR O Task 2: Post-Construction Services The Consultant shall be responsible for providing services during construction close-out. The Consultant shall assist in the preparation of project management forms as identified by the City Engineer. Scope of Services: Services during construction close-out shall include, but not be limited to: Substantial and Final Completion Services, including: Site inspection to determine if facilities are complete and in compliance with Contract Documents. Preparation of punch-list and inspection of punch-list corrective actions. Recommendation to City as to release of payments and retention to Contractor. Record Compilation and Submittal, including; Preparation and submittal of a complete set of organized construction contract documentation. Submittal of any record drawings made by Contractor or Consultant during construction. Obtaining Warranty and Lien Release Information from Contractor and filing a Notice of Completion. [email protected] EXHIBIT A PR O PO SE D Establishing a record file which supports: 1) adequacy of field control, 2) conformance to contract specifications, 3) payments to contractor. The file must be complete, organized and maintained in a manner that permits inspection by the local or State agency. Products and Deliverables All final documents shall be delivered to the City in electronic format and shall become the sole property of the City. Computer aided drawings shall be delivered in AutoCAD-DWG format. Electronic text documents shall be in a Microsoft Word format. Electronic spreadsheets shall be in Microsoft Excel format. 3 [email protected] EXHIBIT A Scope of Work Task 1: Construction Services Project Management- Scheduling, record management, site coordination, progress reports Construction Contract Administration- site meetings, maintaining organized records and photos, Report preparation and submittals, communication liaison, review of contractors submittals, coordinating between engineering and contractors PO SE D Project Change Control- Contract change order review and coordination between Contractor, City, and Caltrans. Field Inspection- Performing field inspection and other quality control activities including necessary materials testing, construction monitoring, compliance with city QAP and Enforcing health and safety standards, Keeping accurate and organized daily records, communications between City and Contractors Task 2: Post-Construction Services PR O Including project close-out, assisting City Engineer in completing and submitting all applicable forms for federal, state and local entities. Our Planning and Design Firm has a substantial amount of experience and a great track record client satisfaction. We aim to work effectively and efficiently on all our projects. We are submitting this proposal for inspection services for the Humboldt Street and vicinity rehabilitation project and feel that we would be able to provide excellent service to the City of Willits Public Works Department. We appreciate your consideration of our firm for this project and would be happy to answer any questions you may have. Sincerely, Thomas and Rachael Campbell 4 [email protected] EXHIBIT A FEE SCHEDULE Fee Inspection *$57.50/ hr Clerical $40.00/hr. *prevailing wage D Duties Cost Estimate PO SE Project: Construction inspection and Management Services for the City of Willits Water Treatment Plant Improvements Project Anticipated Duration of Project : 1 full year @ 3/5 time Approximately 145 work days or 1176 hrs 716.5 hrs 470 hrs PR O Inspection 60% of time @ $57.50/hr Clerical 40% of time @ $40.00/hr Consulting total estimate cost 5 [email protected] $41,200 $18,800 $60,000 Item No. 9d(3) Meeting Date: June 12, 2013 AGENDA SUMMARY REPORT To: Honorable Mayor and Council Members From: Tom Mannatt, City Engineer Agenda Title: DISCUSSION AND POSSIBLE ACTION TO APPROVE CONTRACT WITH VERTICAL MAPPING, INC., FOR CITY-WIDE AERIAL MAPPING, IN AN AMOUNT NOT TO EXCEED $61,145, AND AUTHORIZE CITY MANAGER TO SAME Type: Presentation Consent Regular Agenda Public Hearing Urgent Time: 10 min. Summary of Request: Staff put out an RFP for engineering services on the Main Street Water Line Project. The City received a proposal from Vertical Mapping Resources, Inc. (VMR) for the aerial portion of the work outlined in the RFP. The cost proposed by VMR was significantly less than anticipated. Since the City has had a need for aerial mapping of the entire city for several years, staff solicited a proposal from VMR for this additional mapping. VMR’s cost to provide accurate aerial mapping of the entire city (as shown on the attached map) was $61,145. The proposed city-wide aerial can be used for the Main Street Water Line Project, as well wetlands monitoring, a proposed water reclamation study, sewer collections and water distribution systems mapping, traffic studies, engineering plan production, and many other planned projects. Staff estimates an additional $5,155 for setting of aerial targets. Recommended Action: Approve a contract with Vertical Mapping, Inc., for city-wide aerial mapping, in an amount not to exceed $61,145, and authorize City Manager to same. Alternative(s): None recommended. Fiscal Impact: This project will cost approximately $66,300 and is proposed to be paid for equally out of Funds 202-2020-2101-038, 501-5011-2101-038, and 503-5031-2101-038 ($22,100 each) or budgeted according Council direction. This project is currently budgeted in the FY 2013-2014 budget. Personnel Impact: Staff time managing consultants. Reviewed by: City Manager Council Action: Records: Approved Agreement City Attorney Denied Finance Director Human Resources Risk Other: ________________________________________ Resolution #_________ Ordinance #_________ Other _________ CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is made and entered into in duplicate, effective this 13th day of June 2013, by and between the CITY OF WILLITS, California, hereinafter referred to as the CITY, and Vertical Mapping Resources, Inc. whose address is 193 Blue Ravine Road, Suite 150, Folsom, CA 95630 hereinafter referred to as the CONTRACTOR, as follows: RECITALS A. Contractor is specially trained, experienced and competent to perform the special services which will be required by this Contract; and B. Contractor possesses the skill, experience, ability, background, certification, and knowledge to provide the services described in this Contract on the terms and conditions described herein. PO SE CONTRACT D C. City desires to retain Contractor to render professional services as set forth in this contract. 1. SERVICES TO BE PERFORMED BY CONTRACTOR. Contractor shall perform the services described in “Exhibit A,” which is attached hereto and incorporated herein by reference. Contractor shall provide said services at the time, place, and in the manner specified in “Exhibit A,” subject to the direction of the City through its staff that it may provide from time to time. 2. TERM. The services of Contractor are to commence upon execution of this Contract and shall continue until all authorized work is approved by the City. All such work shall be completed no later than August 31st, 2013. PR O 3. COMPENSATION. Compensation to be paid to Contractor shall be in accordance with “Exhibit A,” which is attached hereto and incorporated herein by reference. In no event shall Contractor’s compensation exceed $61,145 without additional written authorization from the City. Payment by City under this Contract shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4. METHOD OF PAYMENT. Contractor shall submit monthly billings to City describing the work performed during the preceding month. Contractor’s bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Contractor no later than 30 days after approval of the monthly invoice by City staff. 5. EXTRA WORK. At any time during the term of this Contract, City may request that Contractor perform Extra Work. As used herein, "Extra Work" means any work, which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Contract. Contractor shall not perform, nor be compensated for, Extra Work without written authorization from the City. 6. TERMINATION. This Contract may be terminated by the City immediately for cause or by either party without cause upon fifteen days written notice of termination. Upon termination, Contractor shall be entitled to compensation for services performed up to the effective date of termination. Revised: 12/2011 1 Professional Contract: W/ VERTICAL MAPPING RESOURCES, INC. Aerial Mapping – Citywide 7. OWNERSHIP OF DOCUMENTS. All plans, studies, documents and other writings prepared by and for Contractor, its officers, employees and agents and subcontractors in the course of implementing this Contract, except working notes and internal documents, shall become the property of the City upon payment to Contractor for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Contractor or to any other party. Contractor shall, at Contractor’s expense, provide such reports, plans, studies, documents, and other writings to City upon written request. In the event of termination, all finished or unfinished documents, data, studies, and reports prepared by Contractor under this Contract shall become the City’s property; and Contractor shall deliver such documents to the City Clerk within two (2) business days from the date that this Contract is terminated. 8. CONTRACTOR’S BOOKS AND RECORDS. D a. Contractor shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor to this Contract. PO SE b. Contractor shall maintain all documents and records which demonstrate performance under this Contract for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Contract. O c. Any records or documents required to be maintained pursuant to this Contract shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Contractor’s address indicated for receipt of notices in this Contract. PR d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Contractor’s business, City may, by written request by any of the above named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Contractor, Contractor’s representatives, or Contractor’s successor-in-interest. 9. INDEPENDENT CONTRACTOR. Both parties hereto in the performance of this Contract will be acting in an independent capacity and not as agents, employees, partners, or joint ventures of one another. Contractor is not an employee of City and is not entitled to any of the rights, benefits, or privileges of City employees including, but not limited to, medical, or Worker’s Compensation insurance. The parties intend to and have entered into a bonafide independent contract and nothing herein is a subterfuge to avoid making the Contractor an employee of the City. Contractor shall have control of the means, methods and details of performing the work and shall only be subject to the general direction and supervision of the City to insure that results contracted for are achieved per plans and specifications provided to the Contractor. Contractor expressly warrants and agrees that it will exercise its own independent judgment in evaluating the accuracy and reliability of all data, technical reports and studies prepared by the applicant for the Project, its officers, agents, employees and subcontractors or prepared by any other person or entity not a party to this contract. Revised: 12/2011 2 Professional Contract: W/ VERTICAL MAPPING RESOURCES, INC. Aerial Mapping – Citywide 10. INTEREST OF CONTRACTOR. Contractor (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by this Contract or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Contractor’s services hereunder. Contractor further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Contract. Contractor is not a designated employee within the meaning of the Political Reform Act because Contractor: a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal contract monitoring; and D b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).) PO SE 11. PROFESSIONAL ABILITY OF CONTRACTOR. City has relied upon the professional training and ability of Contractor to perform the services hereunder as a material inducement to enter into the Contract. Contractor shall therefore provide properly skilled professional and technical personnel to perform all services under this Contract. All work performed by Contractor under this Contract shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Contractor’s field of expertise. 12. COMPLIANCE WITH LAWS. Contractor shall use the standard of care in its profession to comply with all applicable federal, state, and local laws, codes, ordinances and regulations. PR O 13. LICENSES. Contractor represents and warrants to City that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required of Contractor to practice its profession. Contractor represents and warrants to City that Contractor shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Contract, any licenses, permits, insurance and approvals which are legally required of Contractor to practice its profession. Contractor shall, if required, maintain a City of Willits business license. 14. HOLD HARMLESS. Contractor shall assume the defense of, and indemnify and save harmless, the City and each and every employee and agent thereof from all suits, actions, damages, claims or loss of every name and description to which the City may be subjected or put because of or arising out of Contractor’s negligent performance under this Contract. In providing the indemnification of City provided in this Contract, Contractor agrees to provide for all costs of any necessary legal defense. 15. INSURANCE REQUIREMENTS. a. Contractor, at Contractor’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. i. Revised: 12/2011 Workers’ Compensation Coverage. Contractor shall maintain Workers’ Compensation Insurance and Employer’s Liability Insurance for his/her employees in accordance with the 3 Professional Contract: W/ VERTICAL MAPPING RESOURCES, INC. Aerial Mapping – Citywide laws of the State of California. The Employer’s Liability Insurance shall be maintained in an amount not less than two million dollars ($2,000,000) per accident for bodily injury or disease. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California for all of the sub-contractor’s employees. Any notice of cancellation or nonrenewal of all Workers’ Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees, and volunteers for losses arising from work performed by Contractor for City. D ii. General Liability Coverage. Contractor shall maintain commercial general liability insurance in an amount not less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit. PO SE iii. Automobile Liability Coverage. Contractor shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with the work to be performed under this Contract, including coverage for owned, hired and non-owned vehicles, in an amount of not less than two million dollars ($2,000,000) combined single limit for each occurrence. O iv. Professional Liability Coverage. Contractor shall maintain professional errors and omissions liability for protection against claims alleging negligent acts, errors, or omissions which may arise from Contractor’s operations under this Contract, whether such operations be by the Contractor or by its employees, subcontractors, or subconsultants. The amount of this insurance shall not be less than two million dollars ($2,000,000) on a claims-made annual aggregate basis, or a combined single-limit per occurrence basis. i. PR b. Endorsements. Each general liability, automobile liability, and Workers’ Compensation insurance policy shall be with insurers possessing a Best’s rating of no less than A: VII and shall be endorsed with the following specific language: The City, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Contractor, including materials, parts or equipment furnished in connection with your “ongoing operations” and “your work.” ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self-insured retention the City may have shall be considered excess insurance only and shall not contribute with it. iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. Revised: 12/2011 4 Professional Contract: W/ VERTICAL MAPPING RESOURCES, INC. Aerial Mapping – Citywide iv. The insurer waives all rights of subrogation against the City, its elected or appointed officers, officials, employees, or agents. v. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City. c. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City’s option, Contractor shall demonstrate financial capability for payment of such deductibles or self-insured retentions. PO SE D d. Certificates of Insurance. Contractor shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. The endorsement shall be on forms provided by the City or on other forms which conform to all City requirements. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Contract. Current certification of insurance shall be kept on file with the City at all times during the term of this Contract. 16. NOTICES. Any notice required to be given under this Contract shall be in writing and either served personally or sent prepaid, first class mail. Any such notice shall be addressed to the other party at the address set forth below. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section. City of Willits 111 East Commercial St. Willits, CA 95490-3188 O If to City: PR If to Contractor: Kirk Okraski Vertical Mapping Resources, Inc. 193 Blue Ravine Road, Suite 150 Folsom, CA 95630 17. ENTIRE CONTRACT. This Contract constitutes the complete and exclusive statement of Contract between the City and Contractor. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Contract. 18. AMENDMENTS. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 19. ASSIGNMENT AND SUBCONTRACTING. The parties recognize that a substantial inducement to City for entering into this Contract is the professional reputation, experience, and competence of Contractor. Assignments of any or all rights, duties or obligations of the Contractor under this Contract will be permitted only with the express consent of the City. Contractor shall not subcontract any portion of the work to be performed under this Contract without the written authorization of the City. If City consents to such subcontract, Contractor shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Contract shall create any contractual relationship between City and Revised: 12/2011 5 Professional Contract: W/ VERTICAL MAPPING RESOURCES, INC. Aerial Mapping – Citywide subcontractor, nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. 20. WAIVER. Waiver of a breach or default under this Contract shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under this Contract. 21. SEVERABILITY. If any term or portion of this Contract is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Contract shall continue in full force and effect. 22. CONTROLLING LAW VENUE. This Contract and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Contract shall be held exclusively in a state court in the County of Mendocino. D 23. LITIGATION EXPENSES AND ATTORNEYS FEES. If either party to this Contract commences any legal action against the other party arising out of this Contract, the prevailing party shall be entitled to recover its reasonable litigation expenses, including court costs, expert witness fees, discovery expenses, and attorneys’ fees. PO SE 24. MEDIATION. The parties agree to make a good faith attempt to resolve any disputes arising out of this Contract through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and shall divide the costs of mediation equally. If the parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS/ENDISPUTE ("JAMS") or its successor in interest. JAMS shall provide the parties with the names of five qualified mediators. Each party shall have the option to strike two of the five mediators selected by JAMS and thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation, either party may commence litigation. PR O 25. EXECUTION. This Contract may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Contract, it shall not be necessary to produce or account for more than one such counterpart. 26. AUTHORITY TO ENTER CONTRACT. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Contract. Each party warrants that the individuals who have signed this Contract have the legal power, right, and authority to make this Contract and to bind each respective party. 27. PROHIBITED INTERESTS. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no member, officer, or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. Revised: 12/2011 6 Professional Contract: W/ VERTICAL MAPPING RESOURCES, INC. Aerial Mapping – Citywide 28. EQUAL OPPORTUNITY EMPLOYMENT. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such nondiscrimination shall include, but not be limited to, all activities related to initial employment, upgrading demotion, transfer, recruitment or recruitment advertising, layoff or termination. IN WITNESS WHEREOF, the parties have caused this Contract to be executed on the date first written above. CITY OF WILLITS: By (Signature): Adrienne Moore City Manager CONTRACTOR: Title: D License # H. James Lance City Attorney ATTEST: PO SE APPROVED AS TO FORM: Cathy Sanders Deputy City Clerk PR O Exhibits: Exhibit A - Scope of Work / Schedule of Charges Exhibit B - Insurance Certificates Exhibit C - Insurance Endorsements Exhibit D - IRS W-9 Reporting Form Revised: 12/2011 7 Professional Contract: W/ VERTICAL MAPPING RESOURCES, INC. Aerial Mapping – Citywide EXHIBIT A AERIAL PHOTOGRAPHY DIGITAL MAPPING ORTHOPHOTOGRAPHY GIS BASEMAPPING REMOTE SENSING CONSULTING SERVICES June 4, 2013 Mr. Tom Mannatt CITY OF WILLITS 380 East Commercial Street Willits, CA 95490 RE: TRANSMITTAL LETTER – CITYWIDE AERIAL MAPPING PROJECT D Dear Mr. Mannatt: PO SE Thank you for the opportunity to submit our proposal with regard to your Request for Proposal for Aerial Mapping Services. Following this transmittal page, you will find our proposal per the specifications set forth in the RFP. Vertical Mapping Resources (VMR) is a full service provider of digital mapping, aerial imagery and land information services located in Folsom, CA with additional offices in San Diego and Scottsdale, AZ. Over the past twelve years we have created a solid company based upon traditional photogrammetric practice, yet operate by way of cutting edge technology and methodologies. We firmly stand behind the quality of our product, as well as our client service. VMR’s founders and principals consist of two ASPRS Certified Photogrammetrists, in addition to a Registered Land Surveyor who will oversee all aspects of your project. O VMR has completed a considerable amount of large mapping/imagery projects for government entities. We completed these projects on time, to required specifications and within budget constraints. It is that same commitment to the all entities that we will bring to the City of Willits. As a company, we strive to exceed expectations of all clients and bring forth an unmatched level of professionalism in the mapping industry. PR I will be the dedicated project manager and the primary point of contact for this contract. I am an ASPRS Certified Photogrammetrist and a Certified GIS Professional. As an owner of the company, I bring not only experience in having successfully completed projects of identical scope, but the personal commitment to ensuring that my team maintains a strong reputation through the entire course of the project and beyond. I value the relationships that I have built throughout the state in my over fifteen years working in the professional mapping community. Thank you for your time and consideration. Best Regards, VERTICAL MAPPING RESOURCES, INC.; Kurt J. Okraski, CP, GISP Chief Executive Officer 193 Blue Ravine Road Suite 150 Folsom, CA 95630 phone: 916.817.1486 fax: 916.817.1487 www.verticalmapping.com EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 GENERAL PROJECT TEAM INFORMATION Vertical Mapping Resources (VMR) is a full service provider of digital mapping, aerial imagery and land information services located in Folsom, CA with additional offices in San Diego and Scottsdale, AZ. Our firm provides aerial photography, digital mapping, full topographical services, orthophotography, GIS services and 3-D laser modeling for clients throughout the United States. Our company goal is to provide quality, value-added services to our network of customers who require timely, accurate, cost-effective mapping, imagery and geospatial information products. VMR and its associates provide all aspects of aerial surveying, photogrammetric mapping, digital imagery and related services. Vertical Mapping Resources will be performing all technical tasks (aside from flight) completely in-house. The VMR team will allocate local project professionals and technicians who will be completely dedicated to the softcopy photogrammetry required for this project. VMR has a large compilation (map feature collection) base with the capability of performing 384 compilation hours per week locally. PRIME CONTRACTOR FIRM NAME: KEY CONTACT: ADDRESS: PHONE: WEBSITE: D Project Management and Planning, Aerotriangulation, DTM Collection, Topographic Mapping, Orthorectification, QA/QC and All Final Deliverables. VERTICAL M APPING RESOURCES, INC. Kurt J. Okraski, CP, GISP Chief Executive Officer 193 Blue Ravine Road, Suite 150 Folsom, CA 95630 916.817.1486 www.verticalmapping.com PO SE PROJECT TASK: TEAMING SUB CONSULTANTS PR O Vertical Mapping Resources only teams with companies of the highest caliber. In doing so, we are able to offer an expanded array of services to our clients. The following sub-consultants were selected in order to provide the highest quality service and deliverables to the City of Willits. PROJECT T ASK: FIRM N AME: ADDRESS: PHONE: W EBSITE: Aerial Photography AIR FLIGHT SERVICE 2220 Calle de Luna Santa Clara, CA 95054 951.445.4434 www.airphoto.com _______ © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 1 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 KEY PROJECT TEAM MEMBERS PROJECT MANAGER, PRINCIPAL-IN-CHARGE – KURT J. OKRASKI, CP, GISP As Project Manager, Mr. Okraski’s primary role will be to oversee the project as a whole, coordinating all activity between the City, VMR’s subcontractors and production staff. He will supervise each phase from design and aerial acquisition, through production and final delivery to ensure VMR & City of Willits standards are upheld and overall accuracy is maintained. He will handle project specific issues involving schedules, budgets, technical issues and client communications. D Kurt Okraski co-founded Vertical Mapping Resources and serves as Chief Executive Officer. He is an ASPRS Certified Photogrammetrist and GISCI Certified GIS Professional. In this role, he manages staff and budgets, oversees proposal development and client relations, and has gained practical training and experience in all facets of photogrammetry, surface modeling and 3-D laser scanning. He also earned his Private Pilot Certificate in 2007. He is a member of the American Society for Photogrammetry & Remote Sensing (ASPRS), the Arizona Professional Land Surveyors Association (APLS) and the California Land Surveyors Association (CLSA). SENIOR PHOTOGRAMMETRIST – JOSEPH M. BARTORELLI, CP, GISP PO SE As the active Senior Photogrammetrist, Mr. Bartorelli’s primary role will be to assist Mr. Okraski with project planning, aerotriangulation, quality control and to provide professional assistance to the project team when needed. Joseph brings more than 20 years of photogrammetric and geospatial experience to the VMR team. He is an ASPRS Certified Photogrammetrist and GISCI Certified GIS Professional. O Joseph Bartorelli co-founded Vertical Mapping Resources and serves as President. He is responsible for implementation of the company’s mission statement and vision through overall company management, project management, client relationships and employee development, including communication and collaboration with other principals and project/production managers to establish firm-wide consistency among project teams. He is also responsible for overall accuracy standards for the firm and ensures that VMR’s production equipment and project procedures remain state of the art. FLIGHT DIRECTOR / CHIEF PILOT – JACK BARCELONA PR Jack Barcelona began airborne related services at AFS in 1974 which has become a leading service provider able to accomplish time-critical and technically demanding missions within the Western Region of the US, Hawaii, Guam and remote South Pacific regions. AFS owns and operates seven aircraft which are specifically modified to accommodate a variety of stateof-the-art aerial mapping and video applications. His resume includes; GIS precision GPS & IMU (position & orientation), multi-spectral digital imagery, LIDAR, real time aerial video Surveillance, Intelligence and Reconnaissance SIR and agricultural sterile insect techniques SIT release applications. He provides airborne platforms for all aspects of imaging but also provide air support on a continuing basis directly to Government & Federal clients like USGS, CDFA, Fish & Wildlife, NOAA, NASA, DoE and DoD. AFS has current national security clearances for Department of Energy over-flights; i.e. - Lawrence Livermore National Labs & Sandia Labs. In addition our aircraft and experienced flight crews are available to customers for installation of their own custom sensor packages within remote regions of the US & Pacific Islands. © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 2 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 TEAM EXPERIENCE & REFERENCES VMR and its team members have a strong understanding of the project scope and the potential pitfalls that a project of this type may present. VMR has completed over 1800 aerial mapping and imagery projects during the past ten years and we feel that we have developed a solid understanding of the procedures and methodologies to deliver a product that will not only meet specifications, but provides for ease of use by City staff. The projects listed below are shown due to their similar nature of scope and terrain that will be encountered in completion of the City of Willits project. SIMILAR PROJECT REFERENCES: NAVFAC – VARIOUS CALIFORNIA LOCATIONS D Client: RBF Consulting / Naval Facilities Engineering Command Contact: Gregory Helmer, PLS Phone: 949-472-3505 Email: [email protected] O PO SE Vertical Mapping Resources, Inc. was recently contracted to provide color digital orthophotography and additional services for several California naval bases, including Corona, Seal Beach and Lemoore. The Navy Region Southwest GeoReadiness Center (SW GRC) required new digital imagery consisting of digital aerial orthophotography and oblique imagery for several Naval Air Station Installations in California, including a 1 mile buffer beyond each current Air Installation Compatible Use Zones (AICUZ). VMR was contracted to provide 1”=40’ DTM collection and color digital orthophotography for each facility, and it’s surrounding AICUZ. The project included acquisition of color aerial photography for the stereoscopic feature collection and surface modeling, utilizing Airborne GPS and IMU technologies. Approximately 1,000 exposures were required to fully capture all of the project areas. VMR also produced a color orthophoto mosaic of each facility with a .25’ pixel resolution. VMR was also tasked with approximately 120 hard copy, mounted prints with sizes up to 60”x72” which were produced on the company’s in-house Cannon i9900 wide format plotter. PR YAVAPAI COUNTY ORTHOPHOTOGRPAHY & TOPOGRAPHIC MAPPING PRESCOTT, AZ Client: Yavapai County Flood Control District Contact: Charlie Cave, PE, CFM Phone: 928-771-3197 Email: [email protected] In November 2011, the Yavapai County Flood Control District entered into an agreement with Vertical Mapping Resources, Inc. to provide photogrammetric mapping services, to FEMA standards, for the Verde Valley and Big Bug Creek areas of northern Arizona. The mapped area totaled 150 square miles of diverse terrain, including mountains, flood plains and populated areas. General elements of the project included over 700 individual exposures for the 1”=100’ scale mapping, with 2’ contours, and color orthophotography. A digital terrain model (DTM) was collected using airborne captured LiDAR data supplemented with photogrammetrically collected break lines from digital softcopy workstations. The digital orthophotography was delivered with a .33’ pixel resolution for multiple uses in County departments. With the most recent project being completed in June 2011, it adds to a total of over 350 square miles of color digital orthophotography and topographic mapping completed through multiple contracts for the County. © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 3 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 I-710/LONG BEACH FREEWAY CORRIDOR – LONG BEACH, CA Winner of ACEC 2010 Award of Excellence in Engineering D Client: Wagner Engineering & Surveying Contact: Stephanie Wagner, PE, RLS Phone: 818.892.6565 Email: [email protected] PO SE VMR recently completed an extensive mapping project of an 18-mile portion of the I-710/Long Beach Freeway corridor. Vertical Mapping Resources was contracted to be the provider of the topographic mapping and orthophotography for the heavily developed alignment. The prime contractor and their team of engineers, surveyors and technicians have been engaged to complete a major corridor study of the I-710/Long Beach Freeway. This study will analyze traffic congestion and other mobility problems in this corridor and will support the development of timely, cost-effective transportation solutions. PR O Vertical Mapping Resources provided color orthophotography, a digital terrain model with 1’ contours and design-scale topographic mapping for an 18-mile section of the I-710/Long Beach Freeway corridor. The complex project encompassed the detailed mapping of numerous highway and local street interchanges, including; SR 1, I-405, SR 91, I-105 and the I-5 interchange. © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 4 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 PROJECT TASKS & METHODOLGIES AERIAL PHOTOGRAPHY Vertical Mapping Resources teams with a select group of aerial photography firms in order to provide a diverse fleet of planes and equipment that have the capabilities to efficiently perform on any project, within any geographic location in the United States. The majority of our projects are flown using a Cessna 206 equipped with a state-of-the-art Wild/Leica RC-30 precision camera equipped with forward motion compensation (FMC). FMC is a camera function that actually moves the film across the plate, thus compensating for the perceived movement of the earth below. This significantly reduces blurring and results in the sharpest photographic images possible. An example of the benefits of utilizing a multifunctional fleet was recently seen in the successful completion of three flights simultaneously in three different states in the U.S. Realizing that weather was going to hinder the window of opportunity in which we are able to capture the photography, VMR was able to fly projects in Utah, California and Arizona all in the same day. PRECISION SCANNING PO SE D Vertical Mapping Resources, Inc. will perform aerial photography of the proposed project site(s) at a scale of 1”=300’. This will guarantee NMAS and ASPRS Class 1 accuracies for the ensuing topographic mapping. The photography will be flown using a Cessna 206 equipped with a GPS receiver for in-flight navigation. The photography will be collected using an L/H Systems (Wild/Leica) RC-30 aerial camera equipped with Forward Motion Compensation (FMC) and mounted on a gyro-stabilized mount. The lens in the RC-30 has a 6” focal length. The photography will have stereo coverage consisting of 60% forwardlap and 30% sidelap. PR O At Vertical Mapping Resources, Inc., our digital scanning equipment is the most advanced in the industry. Utilizing Z/I Imaging’s PhotoScan precision scanner, VMR provides complete scanning services to clients in Engineering, Land Surveying, Architectural, GIS and other related fields. PhotoScan is superior in quality and precision and offers accurate images at a price and performance that cannot be matched by its competition. The PhotoScan system incorporates scanning technology developed by Carl Zeiss, Germany, a world leader in photogrammetric optics and mechanical systems. PhotoScan consistently outperforms and provides extremely high scanning speed (less than 7 minutes for a 14 micron scan of a 236 x 236 mm film for either color or black/white imagery). This throughput is outstanding for color films. SOFTCOPY AEROTRIANGULATION Vertical Mapping Resources performs a digital photogrammetric procedure for establishing additional control within the project area. This process, which is a standard procedure in the aerial mapping realm, is performed to achieve a densified control block without the need for additional ground surveys beyond that of a typical project. Softcopy Aerotriangulation is a routine, in which the GPS ground control is loaded, then the fiducials on the digitally scanned photograph are measured and interior orientation is computed. The system then selects and measures all passpoints and tiepoints. The relative orientation is computed and will show all residuals on the points measured. The final output from the bundle adjustment will supply all of the parameters that are needed to set up the softcopy stereo equipment for the ensuing topographic mapping. All Softcopy AT at VMR is performed utilizing the Z/I ISAT triangulation package mounted on a Z/I ImageStation photogrammetric workstation. ImageStation ISAT is an exceptional automatic triangulation package that delivers the best-matched multi-ray tie points by using robust built-in bundle adjustment during all phases of the image matching operation. © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 5 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 SOFTCOPY COMPILATION / DIGITAL TERRAIN MODELING Stereo digitizing will be performed on Z/I Imaging digital photogrammetric workstations. These workstations utilize CADmap/dgn mapping software, which provides a superior, easy to use, map feature digitizing system for use with stereo scanned imagery. These workstations allow for efficient, accurate data collection while allowing for the ability to easily customize the data to individual clients needs (layering, symbology, etc.). A digital terrain model (DTM) is the basis for all contouring, orthophotography, TIN calculations and other surface modeling. The DTMs collected on the Z/I workstations are comprised of mass points and breaklines; which delineate various terrain defining features, such as ravines, ridges, tops and toes of slopes, as well as mass elevation grid points used in flatter areas. Unless client specified, VMR always collects a full DTM on every project to provide the most accurate surface model possible in order to meet and exceed NMAS and ASPRS Class 1 accuracies. DIGITAL ORTHOPHOTOGRAPHY D The topographic and planimetric mapping will be collected at a scale of 1”=40’ and have a 1’ contour interval. All mapping will meet NMAS and ASPRS Class 1 accuracies. A list of typical planimetric features for 1”=40’ mapping is included in the Appendix section on this proposal. PO SE In general, digital orthorectification corrects image distortion introduced by camera tilt, terrain relief displacement, film deformities, lens aberrations and atmospheric refraction. Digital orthophotos combine the high visual information of a photograph with the geometric accuracy of a map. Vertical Mapping Resources utilizes Z/I Imaging’s OrthoPro software, mounted on high-end workstations, to perform image rectification. OrthoPro is a high-throughput ortho production system that includes project planning, rectification, tonal balancing, mosaicing and quality assessment. Utilizing the sophisticated tools contained within OrthPro, VMR will perform contrast stretches, advanced filtering routines, re-sampling and radiometric correction as necessary to provide the highest quality imagery product available. O Control from the aerotriangulation and ground survey will be used to tie the digital images to actual ground coordinates. The DTM collected from the stereo photography will be used during the digital orthorectification process to adjust each image pixel into its correct position. PR VMR will use an exponential interpolation algorithm to perform the orthorectification processing. This technique provides a much more accurate solution than cubic convolution or nearest neighbor methods. Z/I Imaging’s OrthoPro software will be utilized for this project. Z/I OrthoPro is a high-throughput ortho production system that includes ortho project planning, rectification, tonal balancing, mosaicing and quality assessment. The City of Willits project will have a .15’ pixel resolution. PROJECT MANAGEMENT/REPORTING The production process at VMR is efficiently controlled and easily monitored. From our experience in the industry, we know that the key to a successful project is communication and project organization. Hence from design to billing, each project is assigned a specific project workbook that will follow the project throughout its duration. After project award, a workbook is immediately created detailing the scope of services to be performed for the project. This workbook is comparable to “metadata” for a specific project and remains permanently backed-up once the project is completed. Another project management tool utilized by VMR is evidenced in the creation of project timeline charts utilizing Microsoft Project software. All of VMR’s projects are tracked on individual charts as well as a master VMR throughput schedule. If at any point in time the client inquires about their project, the appointed project manager will be able to accurately relay its status. VMR is adamant about complete communication with our clients and we feel that timely deliveries are a large part of our success. © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 6 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 QUALITY CONTROL / QUALITY ASSURANCE EXAMPLES VMR has a very efficient QA/QC plan, tried and tested, and we think it’s beneficial for clients to review our checks as they review our methodologies. Some highlights of our QA/QC include: - Our project and flight layouts are created digitally over USGS quadrangles and existing digital imagery. This assures us initial planning in the correct project coordinate system. It also allows for us to review elevation changes to plan for flight breaks, terrain/planimetric detail and other crucial planning information. - During AT, ground control is superimposed stereoscopically over the aerial imagery. This is where we compare our computed AT adjustment to actual ground coordinates in a CAD environment. No AT solution is passed until all plotted control locations fit true to their location on the imagery. D - All collected models, both DTM and planimetrics are reviewed by a senior compiler. This ensures that each model has been checked twice, once by the compiler and once by the manager, to prevent missed features. PO SE - All contours are generated in InROADs, and then superimposed stereoscopically over the aerial images. In addition to looking for spikes or wells during compilation, this lets us actually see the contours as they drape the ground. This can only be done in a softcopy environment. PR O - Digital Orthophotography (If Requested) is compared not only to the plotted ground control to check accuracy, it is also compared to the DTM and ground planimetrics. We make sure that our orthophotography matches up with all breakline information, curb lines, transportation corridors, etc. © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 7 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 PR O PO SE D PROJECT LAYOUT & COST CHART © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 8 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 CITYWIDE MAPPING PROJECT Description Task Cost Control Survey Aerial Photography 46 Aerial Control Panels Required (Client Supplied) 1"=300' Photo Scale (67 Color Exposures) Scanning Aerotriangulation Topographic Mapping Digital Orthophotography 7 Micron High Precision Scans Softcopy Aerotriangulation (Intergraph's ISAT Software) 1"=40' Topographic Mapping (DTM & 1' Contours) Color Orthophotography with a .15' Pixel Resolution Total $ 5,390.00 $ $ $ $ $ 1,340.00 4,355.00 45,844.00 4,216.00 61,145.00 Working Days 42 Deliverables Format JPEG 9"x9" Film AutoCAD AutoCAD AutoCAD TIF Product Flight Layout w/ Control Aerial Photography DTM Topographic Mapping Planimetric Mapping Orthophotography D Delivery schedule is based upon the estimated number of production working days (shown on cost chart above) required to complete the project after receipt of ground control and film products. PO SE The following chart shows the total billable hourly rate for each project task per labor classification. The hourly rates shown in this chart are to be utilized for any work outside of the above scope, layout and fee schedule. Vertical Mapping Resources, Inc O Hourly Rate Table PR Labor Classifications Total Burdened Rate Project Principal $ 70.00 Project Manager $ 70.00 Aerotriangulation Technician $ 60.00 Image Scanning Technician $ 40.00 Softcopy Technician / Map Compilation $ 50.00 Map Editing Technician $ 50.00 Orthophoto Technician $ 50.00 Clerical $ 35.00 © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 9 EXHIBIT A City of Willits Aerial Mapping & Imagery Services June 4, 2013 APPENDIX PLANIMETRIC COLLECTION STANDARDS FOR DIGITAL MAPPING These specifications refer to Imperial map scales and their metric equivalents. They are established with the assumption that the specified map scale is derived from aerial photography of a scale normally associated with that map scale. In general, any feature, which meets collection criteria, and whose least dimension at ground level exceeds 0.10” at map scale, will be represented on our maps. SMALL SCALE MAPPING: MEDIUM SCALE MAPPING: PO SE D 400 scale and smaller: Road centerlines, airport pavement, bridges, buildings including tanks and docks, railroad centerlines; drainage centerlines longer than 1” at map scale; dams, vegetated areas. 200 scale: the above, plus: Road edges, landmark fences, pipeways, individual trees. PR O 100 scale: the above, plus: Sidewalks, driveways, paths, slabs, fences, walls; swimming pools, large surface planimetry such as poles and billboards; railroads, both tracks; large utilities such as manholes, lights and electrical equipment; drain edges, channels, golf courses, orchards, marsh areas. LARGE SCALE MAPPING: 40 and 50 scale: the above, plus: Gutters, paved walkways, street furniture, small surface planimetry such as posts and pole anchors; small utilities such as vaults and boxes. 20 scale: the above, plus: Pavement paint and legends; stairs. © - Copyright 2013 All Rights Reserved This Information is Confidential - Page - 10