Generator - PKN ORLEN
Transcription
Generator - PKN ORLEN
CCGT WŁOCŁAWEK Investor and Analyst days Włocławek, 23 September 2015 ORLEN. FUELLING THE FUTURE. Gas fired cogenration plants have many competetive advantages LOW CO2 EMISSIONS HIGH-EFFICENCY PRIORITY IN THE UNITS GRID SYSTEM Regulatory COGENERATION SHORT SUPPORT CONSTRUCTION SYSTEM PERIODS MULTIPLE INCOME STREAMS 2 Industrial cogeneration is roughly twice as efficient as large condensing power plants Industrial cogeneration - efficiency PETCHEM & REFINERY Condensing power plant - efficiency Lost Power 50 – 60%* 40%* PKN’s unique competitive advantage Power Process steam fumes fumes 35%* grid grid extraction generator cooling chimney gas condenser coal boiler cooling water 10 GJ fuel ≈ 4 GJ of power * Overall efficiency 40% gas turbine steam turbine boiler heat exchanger 20%* air oil generator gas Municipal heat steam generator turbine 20%* heating water 10 GJ fuel ≈ 7-8 GJ of power & heat * Overall efficiency 70-80% 3 Comments: Just an example, efficiencies as well as steam/electricity structure can vary from plant to plant. Key drivers of the Włoclawek project Power & Heat CCGT will replace existing Anwils CHP CCGT will cover all electricity and majority of heat demand for Anwil Park Stable demand for heat allows to achieve higher net efficiency of CCGT Security of supply Own source of power generation secures Anwil and PTA from electricity shortages Two independent sources of electricity for Anwil (from CCGT and from TSO substation) Infrastructure On-site electricity production with unique trafo setup lowers transmission costs Existing infrastructure in Anwil factory will cover all other media i.e. demi water, sewages, (modernization of the existing infrastructure optimize CAPEX for the project) Partner General Electric as a leader of the EPC consortium Long Term Service Agreement signed with GE for maintenance of „power train” - gas turbine, generator and steam turbine 4 Our locations offer good access to external infrastructure LNG Locations with access to natural Włocławek Kondratki Lwówek Dolna Odra Ostro leka grid connections (PSE) Płock Włocławek PAK Locations in Northern Poland – Kozienice Turów area with weak power Belchat ów Lasów BOT gas pipelines (Gas System) and Polaniec PKE Blachownia Opole Lagisza Siersza Halemba Jaworzno Łaziska Laziska /EnBW Rybnik Cieszyn Electricity generation Skawina generation Wola Drohowicze PKN ORLEN sites Inter-connectors for natural gas transmission LNG Terminal Yamal-Europe Transit Gas Pipelines System Yamal exit 5 CCGT Wloclawek- project technical data CCGT Wloclawek- Project technical data Electric capacity Technology Combined cycle gas turbine unit with steam extraction Gas turbine type GE 9FB05 Ramp up rate 20 MW/min Assumed average fuel utilization efficiency over the life-time EPC+ LTSA 463 MW up to 70% (depending on steam offtake) • EPC: Consortium General Electric & SNC Lavalin Net efficiency in full condensing mode • LTSA: Genral Electric (12 years for the Power Train), PLN 200 mln Assumed average electricity generation 2 - 2.5 TWh/a Total Capex PLN 1.4 bilion EPC Capex PLN 1.1 bilion (0.6 mln EUR/MW) ~59% 6 Construction of the unit is only one of the elements necessary to develop the CCGT project The EPC Contractor – construction of CHP Gaz System gas supplies ANWIL - modernization of Anwil PKN ORLEN construction of power line PSE OPERATOR modernization of Azoty station 7 Main elements of CCGT unit stack heat recovery steam generator engine room building with powertrain ( gas turbine – generator – steam turbine) cooling tower air inlet boiler feed water pomp containers (automatic/ electricity) transformer 8 Gas Turbine Power Combustion system Exhaust flue gases temperature Number of compressor stages 300 MW DLN 2.6+ 637 °C 18 Air flow compressor Number of turbine stages 655 kg/s Flue gas stream to boiler 679 kg/s 3 9 Steam turbine Steam turbine HP, MP, LP and condenser 10 Generator Generator General Electric – 450 H Stator of generator GE 450H – harbor in Wloclawek power output - 543MVA voltage of generator - 19kV cooled by hydrogen weight – 423 ton rotor weight – 70 ton 11 Phase shift transformer Transformer 220/110 kV Transformer power - 230 MWA Total weight – 264 ton 12 HRSG boiler HRSG boiler – Doosan boiler height - 38 m number of modules - 15 number of drums - 3 steam pressure 158 bar, 21 bar, 4 bar tube arrangement - vertical 13 Assembly of the first module 28.05.2014 Fotoinfo 07.2014 07.2014 Cooling system Gas turbine on the foundation 09.2014 Boiler house 09.2014 Machine hall 14 Site - Fotoinfo 08.2014 15 Fotoinfo 08.2015 16 People – key factor of the successful project KEY PEOPLE IN THE PROJECT Dominika Siurmicka-Woźniak H&S Włodzimierz Glinka CCGT Execution PM Krzysztof Witkowski CCGT Business PM Piotr Zelba Total staffing 28 FTE CCGT Production Manager Leszek Kubiak I&C specialist • Production staff recruited from ANWIL– 21 FTE Krzysztof Motyl • • Extensive training by GE Plan Manager: 2 months training in one of the GE Plant in Ireland (Whitegate plant) GT specialist Wojciech Lizak ST and BOP specialist 17 17 Thank you 18