AADE Colony Wash Horizontal Drlg (Chesap[...]
Transcription
AADE Colony Wash Horizontal Drlg (Chesap[...]
2010 AADE Operators Symposium Chesapeake Energy – Colony Wash Horizontals Performance Management Craig Staley, Drilling Engineer – Anadarko Basin 1 Colony Wash – Overview 2 Colony Wash – Overview ● Highlights – – – – – 1st Spud November 2006 5 rigs currently; 8 rigs by May 2010 71 Wells 12,500’ TVD 17,000’ MD 56 Days - $4.27MM 3 Colony Wash – Overview 4 Colony Wash – Overview 5 Colony Wash – Rigs ● Rigs – 11 Different Rigs have been in the fleet 3 rigs have drilled 15 or more wells each (53 Total ~ 70%) ● Rig Inventory – Diesel Electric – 1000 HP Draw-works – 750M lb Derricks – Top Drives – 1600 HP Pumps – Iron Roughnecks Nomac 16 – 20 Wells 6 Colony Wash – Well Design ● 1st Edition: 63 Days $5.1MM – 13 3/8” Surface 500’ – 9 5/8” Inter. 5,500’ – 7” Curve 13,000’ – 4 1/2” Prod. 17,000’ (WBM, Liner-Tieback) ● 2nd Edition: 66 Days $5.6MM – 13 3/8” Surface 1500’ – 9 5/8” Inter. 12,000’ – 4 1/2” Prod. 17,000’ (OBM) ● 3rd Edition: 64 Days $4.9MM – 10 3/4” Surface 1500’ – 7 5/8” Inter. 12,000’ – 4 1/2” Prod. 17,000’ ● 4th Edition 53 Days $4.1MM – 9 5/8” Surface 1500’ – 7” Inter. 12,000’ – 4 1/2” Prod. 17,000’ 7 HOLE SECTIONS 8 Colony Wash – Surface Hole ● Spud to Drill Out Float Equipment ● Surface Casing Waiver to OCC (BTW 300’ – 500’) ● 12 1/4” hole to 1,500’ ● Drill with 117 IADC roller cone bit ● 9 5/8” 40 J55 LTC ● Hole Section Hours Average = 59 Technical Limit = 30 ● Drilling Hours Average = 16 Technical Limit = 8 9 Colony Wash – Intermediate Hole ● Drill Out Surface to FIT ● Drill Out 8 3/4” to depth of 100’ above KOP (12,000’) ● Bits – PDC’s – Drill Out: 5 blades with 5/8” (16mm) Footage: 6140’ – Follow Up: ROP: 78.3 fph 6 blades with 1/2” (13MM) Footage: 2390’ ROP: 35.9 fph – Bit Engineers have started to crack the code, 1st one bit interval! Footage: 10409’ ROP: 50 fph [Oklahoma State Record STC MSi516] » Lesson Learned: 66.5 fph ● Packed BHA ● 7” 26 HC-P110 LTC ● Hole Section Hours ● Drilling Hours Average = 340 Average = 219 Technical Limit = 270 Technical Limit = 161 10 Colony Wash – Intermediate Hole (Cont..) 11 Colony Wash – Pilot Hole ● FIT to PU Directional Tools ● 60% have Pilot Holes ● Drill 6 1/8” Hole (12,000’ – 13,500’) ● PDC Drillable – 60% 2 bits 22.5% 3 bits 15% 4 bits or more – Average ROP = 18 fph ● Packed BHA ● MW 11.5 ppg – 12.5 ppg OBM 12 Colony Wash – Pilot Hole (Cont.) ● Set open hole whipstock – Improved Mill Design increasing ROP 55% 1st Mills 2nd Mills – Whipstock = 25 Hours ● Hole Section Hours ● Drilling Hours FasTrack ROP = 1.79 fph HF ROP = 2.77 fph vs. Cement Plug = 70 Hours Average = 114 Average = 52 Technical Limit = 67 Technical Limit = 29 13 Colony Wash – Curve ● PU Tools to Landing Point ● Drill 6 1/8” Hole ● Bit Selection – Insert to 50○ -60○ , PDC – PDC Evolution – 5 at start of play, 3 currently (280 Hours vs. 200 Hours) ● BHA – 2.1○ Motor 78% Sliding » ROP = 7.6 fph 22% Rotating » ROP = 9.9 fph ● MW 11.5 ppg – 12.5 ppg OBM ● Hole Section Hours Average = 244 ● Drilling Hours Average = 128 TL = 107 TL = 57 14 Colony Wash – Lateral ● Landing Point to Casing Operations ● Target 5’ Cylinder ● Bit Selection – Offset Data, Geology Number of Bits 2 – 23 » 5 - 9 blade PDC’s » ‘627’ insert bits ● BHA – 1.5○ Motor 68% Time Rotating » ROP = 21.2 fph 32% Time Sliding » ROP = 7.9 fph – Rotary Steerable ● Hole Section Hours ● Drilling Hours Average = 587 Average = 313 Technical Limit = 230 Technical Limit = 112 15 Colony Wash – Time Summary 16 Colony Wash – Time Summary 17 Colony Wash – Summary ●Competitive Environment ●Team Effort ●Data Management ●Direction 18 Questions Chesapeake Energy – Colony Wash Horizontals Performance Management Craig Staley, Drilling Engineer – Anadarko Basin 19