2014 Quarter 1 - Cooler Design, Inc.
Transcription
2014 Quarter 1 - Cooler Design, Inc.
Planning and ARCH 1st Quarter 2014 SCHNECK MEDICAL CENTER In 2013 we worked with the hospital to deliver multiple projects which were a direct result of the master facility plan we completed in 2012. The antiquated Cystoscopy Lab equipment was failing and urgently needed to be replaced. A new room was designed almost twice the size to better accommodate multiple pieces of new and future equipment. A dedicated Infusion center with 6 recliners and 4 private rooms was created to relieve a congested outpatient treatment area of the hospital. A psychiatric counseling suite was designed to provide greater privacy for patients seeking these services. A new computer training room was created to serve up to 24 staff at one time. A new 8,000 sf Orthopedic Physician Suite replaced their former smaller suite location on campus. The new suite contains 13 exam rooms and a general radiographic room. All projects for SMC were constructed by CH Garmong & Sons. IU HEALTH BLOOMINGTON HOSPITAL LIBERTY DRIVE Last year we assisted the hospital in turning an existing church and conference center into a medical office building. Opening in December 2013, this completely renovated 22,000 sf two-story building included space for Southern Indiana Physicians’ Outpatient Family Practice, Laboratory, Urology, and X-Ray suites. In addition to the building renovation, the project included modifications to the existing parking lot and sidewalks. HIGHER EDUCATION Over the past year we designed and completed renovation projects for our higher education clients. At Indiana University the projects were in both the Geology and Chemistry buildings in Bloomington. At Ivy Tech we completed a new classroom and faculty offices in Columbus. We have enjoyed building relationships with our new clients, and providing creative solutions to the challenges that each project brings. EMPLOYEE NEWS Brianna Wetzel has created “Keystone”, a not-for-profit that is geared towards being a positive support to teenagers through relationships and providing a nurturing environment for these kids to hangout on Friday nights in her hometown of Cambridge City. Great job Bri!! Bill is still amazed at what a pair of scissors can do to his new “Cavashon” puppy Sadie. After the snow created clumps in her hair, it had to be trimmed. Now her hair is as short as Bills! PROS & CONS OF BIM Building Information Modeling (or BIM) involves creating and using an intelligent 3D model to inform and communicate project decisions. It is changing the industry on how buildings, infrastructures, and utilities are planned, designed, built, and managed. It is key on a BIM project that all the design and building team utilize the same software to create a unified package for the owner, otherwise the process become disconnected. While a great tool in design and construction, it may be completely useless for most owners if they don’t have the capabilities of managing such products. It requires more time and information from those involved to create the model which can produce great coordination between the trades, but this process is not best suited for small or fast track projects, or those with tight schedules. Ask us to explain the pros and cons associated with the use of BIM. Don’t request that it be used without knowing what it’s all about! RIVERVIEW HOSPITAL LABORATORY & PHARMACY In 2013 we worked with the hospital to design and implement a completely new Laboratory and Pharmacy to replace the existing departments in the hospital. The Lab used new Herman Miller systems furniture and a new Beckman Coulter Power Processing line attached to a Beckman Coulter DxI 800 and a Beckman Coulter AU5812 analyzer to process their over 600,000 tests/yr. The Pharmacy provided a much larger and efficient space including a compounding room and utilized R.C. Smith Modular Casework Systems furniture. Both projects were constructed by Meyer Najem.