US Building / Edge Construction - Education

Transcription

US Building / Edge Construction - Education
LEDCOR
EDgE CONSTRUCTION LLC
EDUCaTION
FOCUSED.
KNOW-HOW.
aCROSS THE CONTINENT,
THIS IS WHAT WE DO. AND WE DO IT WELL.
Ledcor understands the needs of school districts, agencies, principals and students—and
working while school is in session. We follow a step-by-step process that ensures we
complete each scope of work and strive to exceed your expectations as our client.
We offer construction management, design-build, lease-leaseback and general
contracting services for new, modernization, and expansion of school projects.
Our commitment to excellence results in safe, positive, and environmentally
sustainable learning facilities that allow students in your school distrct
to excel and thrive.
Murrieta Mesa High School, Murrieta, California
innovation.
environment.
we are innovating today,
so we can build for tomorrow.
As a member of the U.S. Green Building Council and a leader in sustainable building,
Ledcor’s green building solutions can help you optimize the quality and life cycle costs
of your facility. Since 1997, we have built over 7 million square feet of green building
space across the continent, with dozens of projects achieving LEED® and Living Building
certification. Understanding the balance between design and constructability has
allowed us to meet our clients’ sustainability goals and financial return requirements
for both new and existing facilities.
Lakeside High School, Lake Elsinore, California
.
Murrieta Mesa High School, Murrieta, California
This high school is biult on 65 acres and is comprised of 10 separate buildings, including: a 35,000 sq. ft. theatre; 16,000 sq. ft. library; 57,000 sq. ft. gymnasium;
8,000 sq. ft. cafeteria kitchen; and 126,000 sq. ft. of classroom space. Other amenities include an Olympic-size swimming pool and pool building; six basketball courts;
eight tennis courts; softball, baseball, and soccer fields; and a football stadium.
our
promise.
quality
We never lose sight of the ultimate goal: delivering a
signature level of craftsmanship on time and on budget—
or better. With a diverse range of construction expertise
and experience, EDGE/Ledcor can be who you need us
to be, do what you need us to do. We have been doing it
since 1947—the right way. Always.
collaboration
EDGE/Ledcor is for people who want partners, not
suppliers. We believe every project—your project—is about
more than concrete and steel. It’s about people and the
power of partnerships. We complete your work with
integrity. Commitment. And consider you a colleague,
collaborator and vital member of our team.
diversity
Our unique perspective comes from expertise in many
areas. We offer a broad range of construction solutions.
And our diversity allows us to see the job from many
angles. We are always prepared to undertake new
challenges. Expand our capabilities. Travel with you to
new markets. Let’s grow. Together.
ADDITIONAL CALIFORNIA PROJECTS
•
•
•
•
•
•
•
Temecula Valley High School Theater and Locker Room, Temecula
Monterey Ridge Elementary School, San Diego
Mission Vista High School, Oceanside
UCLA South Campus Student Center, Los Angeles
Vista Murrieta High School, Murrieta
Vista Murrieta High School Sports and Aquatics
Complex, Murrieta
CA State University, San Marcos, Center for Children and Families Building, San Marcos
University of California, Irvine (UCI) Arts Building, Irvine, California
The Arts Building at UCI provides a combination of spaces for technology-driven instruction, research,
performance, production support, academia, and administration. This certified LEED® Gold designbuild project spans 60,000 sq. ft. and rises 4 stories over a basement level.
Crowne Hill Elementary School , Temecula, California
Spanning 84,444 sq. ft., the new enclosed building
includes seven new classroom and administration
buildings, plus covered walkways, new playground,
permanent fire access road, irrigation, and landscaping.
uC riverside student
academic support services
riverside, CALIFORNIA
“The EDGE team has been performing an outstanding job. They are thorough and
dedicated to quality and customer satisfaction, and have consistently demonstrated
good work ethic and professionalism through completion of the project. EDGE...is
dedicated to outstanding work and customer satisfaction.”
Darius Maroufkhani
Senior Architect, UCR Office of Design and Construction
Chaffey College Physical Education Facility, Rancho Cucamonga, CA
This 19,222 sq. ft. project consists of a new masonry gymnasium building
that features a brand new full size gymnasium, faculty and team locker
rooms, retractable bleachers, and a public address system.
Del Sur Elementary School, San Diego, California
Del Sur Elementary School is a truly unique design: one single building with
32 classrooms for 800 students, spanning 56,000 sq. ft. This project was
awarded the 2006 Coalition for Adequate School Housing/American Institute of
Architects, California Council Leroy F Greene Design Award for Project-In-Design.
PROVEN.
RELIABLE.
SINCE 1947, the Ledcor Group
has been building with integrity.
The Ledcor Group of Companies is one of North America’s largest, most diversified, employee-owned construction
companies. We provide a broad portfolio of construction services to organizations in every major industry. Founded in
Leduc, Alberta, Ledcor now employs thousands of people in 20 offices across North America.
With over 34 years of construction experience in Southern California combined, EDGE Construction LLC brings together
the brand strength of Ledcor and the education and public works building expertise of EDGE Development Inc.
Projects depicted in this brochure were constructed by EDGE Development Inc.
CORPORATE Head Office
us Head Office
1067 West Cordova Street, Suite 1200
6405 Mira Mesa Boulevard, Suite 100
Vancouver, British Columbia
San Diego, California
Canada V6C 1C7
USA 92121
P 604 681 7500
P 858 527 6400
F 604 681 4385
F 858 527 6410
For a full listing of Ledcor offices across the United States and Canada, visit LEDCOR.COM/CONTACTUS
www.ledcor.com
“LEDCOR and LEDCOR Design are trademarks of Ledcor IP Holdings Ltd., used under license.”